VCB, 36kV, 1250A, Type-VD4, 31.5kA/3,ELC. Install n commission Panel
Bharat Petroleum Corporation Ltd
SAGAR, MADHYA PRADESH
Bid Publish Date
20-May-2026, 4:00 pm
Bid End Date
04-Jun-2026, 4:00 pm
Location
Progress
Quantity
2
Category
SIEPAN PANEL, TI/K26/SDO/02/DI-01, SIEMENS 51110101000720
Bid Type
Single Packet Bid
Bhilai Steel Plant, a unit of Steel Authority of India Limited, seeks bids for the supply, installation, testing and commissioning of a SIEPAN PANEL. The project scope covers procurement through commissioning at the ECR-RMP3, Durg facility, with OEM involvement by Siemens Ltd. and authorized support from Shapoorji Pallonji & Co. Ltd. The tender references drawing TI/K26/SDO/02/DI-01, BOM-01, and SLD-01 (Annexure-4). The engagement includes installation at the RMP-3 conveyors, with 18-month warranty and milestone payments tied to commissioning milestones. The OEM/OES arrangement and direct submission path emphasize supplier credibility and back-up OEM guarantees.
SIEPAN PANEL design per TI/K26/SDO/02/DI-01 (Annexure-4)
BOM per TI/K26/SDO/02/BOM-01 (Annexure-4)
Power line diagram per TI/K26/SDO/02/SLD-01 (Annexure-4)
OEM authorization: Siemens Ltd. or authorized OES with GeM linkage
Warranty: 18 months from supply or 12 months from commissioning
Payment: 90% on supply/acceptance, 10% on commissioning; 100% for installation/commissioning
Original packing requirement for all items
Delivery/Installation must be performed by OEM/OES authorized entity with back-up guarantees
Payment schedule is milestone-based: material value and commissioning milestones
Warranty: 18 months from supply or 12 months from commissioning; whichever earlier
OEM original packing required; commissioning certificates mandatory for final payment
Drawings and annexures must be strictly followed (DI-01, BOM-01, SLD-01)
90% of material value on supply/acceptance; 10% on commissioning certificate; 100% for installation/commissioning activities after successful commissioning
Installation, testing and commissioning to be completed as per project milestones; exact timeline not disclosed
Not specified in data; bidders should seek standard LLD terms during final negotiation
OEM authorization from Siemens Ltd or OES authorization with GeM linkage
Dealer bidders must provide OEM/OES back-up guarantee for quality/workmanship
Original packing and packaging compliance with OEM specifications
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SIEPAN PANEL, TI/K26/SDO/02/DI-01, SIEMENS 51110101000720 , INSTALL, INTEGRATE, TEST AND COMMISSION 511101010000123
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Petroleum Corporation Ltd
SAGAR, MADHYA PRADESH
National Aluminium Company Limited, Bhubaneswar
KORAPUT, ODISHA
Nmdc Limited
DANTEWADA, CHHATTISGARH
National Institute Of Ocean Technology (niot)
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
OEM authorization letter (Siemens Ltd) or OES authorization (Shapoorji Pallonji & Co. Ltd) with GeM bid number
Back-up OEM guarantee for quality & workmanship (if bidding via dealer)
Technical bid documents demonstrating conformance to TI/K26/SDO/02/DI-01 and BOM-01
Commissioning certificates or prior similar project experience
Warranty terms proposal covering 18 months from supply or 12 months from commissioning
Packing declaration confirming OEM original packing
Key insights about CHHATTISGARH tender market
Bidders must submit OEM authorization from Siemens Ltd or an OES with GeM reference, along with back-up guarantees for quality. Include BOM-01 and SLD-01 conformance, commissioning certificates, and OEM original packing. Ensure compliance with TI/K26 drawings and Annexures, and provide commissioning milestone documents.
Required documents include GST and PAN, OEM/OES authorization, back-up guarantees for dealers, BOM/SLD conformance, commissioning certificates, and warranty terms (18 months from supply or 12 months from commissioning). Include packing declarations and prior project experience if available.
Payment terms specify 90% of material value on supply/acceptance at BS stores, with 10% balance on commissioning certificate; installation/commissioning activities are paid 100% after successful commissioning and shop certification.
Bidders must follow TI/K26/SDO/02/DI-01 (Annexure-4) for design, TI/K26/SDO/02/BOM-01 (Annexure-4) for BOM, and TI/K26/SDO/02/SLD-01 (Annexure-4) for power line diagrams.
The supplier must offer a warranty of 18 months from the date of supply or 12 months from the date of commissioning, whichever is earlier, covering workmanship and material integrity.
Offers can be submitted by the OEM (Siemens Ltd) or their authorized OES (Shapoorji Pallonji & Co. Ltd) or by authorized dealers with OEM/OES back-up guarantees and GeM references.
Hindustan Aeronautics Limited (hal)
📍 KORAPUT, ODISHA
Armoured Vehicles Nigam Limited
Patratu Vidyut Utpadan Nigam Limited
📍 HAZARIBAG, JHARKHAND
National Aluminium Company Limited, Bhubaneswar
📍 KORAPUT, ODISHA
Indian Army
📍 JABALPUR, MADHYA PRADESH
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS