Central University of Odisha CCTV & Network Equipment Tender Odisha 2025 – ISI/ISO Standards Included
Central University Of Odisha
KORAPUT, ODISHA
Progress
Quantity
41091
Category
4 MP IP IR BULLET CAMERA
Bid Type
Two Packet Bid
Indian Navy invites bids for 4 MP IP IR BULLET CAMERA, 64 GB MEMORY CARD, 4 MP IP IR SPEED DOME PTZ CAMERA, 64 CH NVR WITH 4 SATA HI FOCUS HD NVR 7864Q, 32 CH NVR WITH 4 SATA HI FOCUS HD NVR 7432Q, 8TB SURVEILLANCE HARD DISK, 6 CORE OFC ARMOURED CABLE SINGLE MODE, CAT 6 OUTDOOR NETWORK CABLE, 6 U OUTDOOR RACK WITH POWER MANAGER WATER PROOF IP 67 STANDARD, 6 U RACK WITH POWER MANAGER TRAY AND FAN INDOOR RACK, 9 U SERVER RACK WITH POWER MANAGER AND FAN INDOOR RACK SERVER ROOM, 24 PORT POE GIGABIT SWITCH WITH 4 SFP PORTS, 8 PORT POE GIGABIT SWITCH, SC LC SM DUPLEX PATCH CORD 5 MTRS, GIBIC 10 100 1000 SINGLE MODE DUPLEX, 12 PORT RACK MOUNT LIU SINGLE MODE SIMPLEX, OFC ENCLOSURES, 25 MM PVC PIPE, 40 MM HDPE PIPE, GANG BOX, CUSTOMIZED BRACKETS FOR CAMERAS, GI PIPES 3 INCH GI POLE 6 MTRS WITH WELDING, TRENCHING WORK FOR OFC LAYING WARRANTY NA, ROAD TRENCHING AND REFILLING FOR LAYING OFC ROAD BRACKING 300 MTRS ROAD BRAKING RE CONSTRUCT ROAD, 3 KVA UPS MAKE NUMERIC MODEL NO VALURA IBB WARRANTY 3 YEARS, 3 CORE 1. 5 SQ MM POWER CABLE, ELECTRICAL ACCESSORIES 1 INCH CLUMP SCREW FISHER RACK SCREW CABLE TIA, OLT, SPLICING CHARGES, WORKSTATION, MONITER FOR WORKSTATION, 55 INCH LED DISPLAY, OFC ROUTE MARKER CAST, 1. 5 TON 3 STAR INVERTER SPLIT AC COPPER 4 IN 1 ADJUSTABLE MODE ANTIDUST FILTER, VOLTAGE STABLIZER FOR 1. 5 TON AC 130V 300V STABILIZER WALL MOUNTED, 2X2 CROSS VIDEO WALL, 10 MTRS HDMI CABLE, WIRELESS MOUSE, PVC CONDUIT LAYING CHARGES AND HDPE LAYING CHARGES, CABLE LAYING CHARGES, INSTALLATION TESTING AND COMMISSIONING CHARGES FOR VIDEO WALL DISPLAY, INSTALLATION AND CONFIGURATION CHARGES INCLUDES RACK SWITCH FIXING, COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR 03 YEARS in SOUTH GOA, GOA. Quantity: 41091. Submission Deadline: 11-06-2025 11: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Central University Of Odisha
KORAPUT, ODISHA
Indian Army
Indian Army
BANGALORE, KARNATAKA
Indian Army
BHOPAL, MADHYA PRADESH
Vardhaman Mahaveer Open University (vmou)
CHANDIGARH, CHANDIGARH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 4 MP IP IR BULLET CAMERA | as per technical specificattions | 79 | nos | lpamnadg | 120 |
| 2 | 64 GB MEMORY CARD | as per technical specificattions | 79 | nos | lpamnadg | 120 |
| 3 | 4 MP IP IR SPEED DOME PTZ CAMERA | as per technical specificattions | 9 | nos | lpamnadg | 120 |
| 4 | 64 CH NVR WITH 4 SATA HI FOCUS HD NVR 7864Q | as per technical specificattions | 1 | nos | lpamnadg | 120 |
| 5 | 32 CH NVR WITH 4 SATA HI FOCUS HD NVR 7432Q | as per technical specificattions | 1 | nos | lpamnadg | 120 |
| 6 | 8TB SURVEILLANCE HARD DISK | as per technical specificattions | 9 | nos | lpamnadg | 120 |
| 7 | 6 CORE OFC ARMOURED CABLE SINGLE MODE | as per technical specificattions | 5,000 | mtrs | lpamnadg | 120 |
| 8 | CAT 6 OUTDOOR NETWORK CABLE | as per technical specificattions | 6,100 | mtrs | lpamnadg | 120 |
| 9 | 6 U OUTDOOR RACK WITH POWER MANAGER WATER PROOF IP 67 STANDARD | as per technical specificattions | 22 | nos | lpamnadg | 120 |
| 10 | 6 U RACK WITH POWER MANAGER TRAY AND FAN INDOOR RACK | as per technical specificattions | 3 | nos | lpamnadg | 120 |
| 11 | 9 U SERVER RACK WITH POWER MANAGER AND FAN INDOOR RACK SERVER ROOM | as per technical specificattions | 1 | nos | lpamnadg | 120 |
| 12 | 24 PORT POE GIGABIT SWITCH WITH 4 SFP PORTS | as per technical specificattions | 1 | nos | lpamnadg | 120 |
| 13 | 8 PORT POE GIGABIT SWITCH | as per technical specificattions | 27 | nos | lpamnadg | 120 |
| 14 | SC LC SM DUPLEX PATCH CORD 5 MTRS | as per technical specificattions | 90 | nos | lpamnadg | 120 |
| 15 | GIBIC 10 100 1000 SINGLE MODE DUPLEX | as per technical specificattions | 58 | nos | lpamnadg | 120 |
| 16 | 12 PORT RACK MOUNT LIU SINGLE MODE SIMPLEX | as per technical specificattions | 2 | nos | lpamnadg | 120 |
| 17 | OFC ENCLOSURES | as per technical specificattions | 32 | nos | lpamnadg | 120 |
| 18 | 25 MM PVC PIPE | as per technical specificattions | 400 | mtrs | lpamnadg | 120 |
| 19 | 40 MM HDPE PIPE | as per technical specificattions | 5,000 | mtrs | lpamnadg | 120 |
| 20 | GANG BOX | as per technical specificattions | 79 | nos | lpamnadg | 120 |
| 21 | CUSTOMIZED BRACKETS FOR CAMERAS | as per technical specificattions | 79 | nos | lpamnadg | 120 |
| 22 | GI PIPES 3 INCH GI POLE 6 MTRS WITH WELDING | as per technical specificattions | 30 | nos | lpamnadg | 120 |
| 23 | TRENCHING WORK FOR OFC LAYING WARRANTY NA | as per technical specificattions | 1,000 | mtrs | lpamnadg | 120 |
| 24 | ROAD TRENCHING AND REFILLING FOR LAYING OFC ROAD BRACKING 300 MTRS ROAD BRAKING RE CONSTRUCT ROAD | as per technical specificattions | 300 | mtrs | lpamnadg | 120 |
| 25 | 3 KVA UPS MAKE NUMERIC MODEL NO VALURA IBB WARRANTY 3 YEARS | as per technical specificattions | 3 | nos | lpamnadg | 120 |
| 26 | 3 CORE 1.5 SQ MM POWER CABLE | as per technical specificattions | 3,000 | mtrs | lpamnadg | 120 |
| 27 | ELECTRICAL ACCESSORIES 1 INCH CLUMP SCREW FISHER RACK SCREW CABLE TIA | as per technical specificattions | 1 | lot | lpamnadg | 120 |
| 28 | OLT | as per technical specificattions | 1 | nos | lpamnadg | 120 |
| 29 | SPLICING CHARGES | as per technical specificattions | 120 | nos | lpamnadg | 120 |
| 30 | WORKSTATION | as per technical specificattions | 4 | nos | lpamnadg | 120 |
| 31 | MONITER FOR WORKSTATION | as per technical specificattions | 4 | nos | lpamnadg | 120 |
| 32 | 55 INCH LED DISPLAY | as per technical specificattions | 5 | nos | lpamnadg | 120 |
| 33 | OFC ROUTE MARKER CAST | as per technical specificattions | 30 | nos | lpamnadg | 120 |
| 34 | 1.5 TON 3 STAR INVERTER SPLIT AC COPPER 4 IN 1 ADJUSTABLE MODE ANTIDUST FILTER | as per technical specificattions | 2 | nos | lpamnadg | 120 |
| 35 | VOLTAGE STABLIZER FOR 1.5 TON AC 130V 300V STABILIZER WALL MOUNTED | as per technical specificattions | 2 | nos | lpamnadg | 120 |
| 36 | 2X2 CROSS VIDEO WALL | as per technical specificattions | 2 | lot | lpamnadg | 120 |
| 37 | 10 MTRS HDMI CABLE | as per technical specificattions | 10 | nos | lpamnadg | 120 |
| 38 | WIRELESS MOUSE | as per technical specificattions | 2 | nos | lpamnadg | 120 |
| 39 | PVC CONDUIT LAYING CHARGES AND HDPE LAYING CHARGES | as per technical specificattions | 5,400 | mtrs | lpamnadg | 120 |
| 40 | CABLE LAYING CHARGES | as per technical specificattions | 14,100 | mtrs | lpamnadg | 120 |
| 41 | INSTALLATION TESTING AND COMMISSIONING CHARGES FOR VIDEO WALL DISPLAY | as per technical specificattions | 1 | lot | lpamnadg | 120 |
| 42 | INSTALLATION AND CONFIGURATION CHARGES INCLUDES RACK SWITCH FIXING | as per technical specificattions | 1 | lot | lpamnadg | 120 |
| 43 | COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR 03 YEARS | as per technical specificattions | 1 | lot | lpamnadg | 120 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about GOA tender market
The eligibility requirements include being a registered entity that complies with national regulations. Bidders must demonstrate prior experience with similar projects, possess the required technical specifications, and meet quality assurance standards.
Bidders are expected to provide valid certifications that align with industry standards for security systems. This includes technical compliance certificates, ISO certifications, and any other relevant documentation that authenticates the quality of the products proposed.
The registration process involves completing an online application via the designated portal provided in the tender documentation. Bidders must ensure that all required documents are accurately filled out and submitted in the accepted digital format to complete their registration.
Typically, payment terms will include a specified timeline of executing payments upon delivery and installation of equipment. Comprehensive details regarding the payment terms will be outlined in the financial section of the tender documents.
Yes, the tender includes benefits for Micro, Small, and Medium Enterprises (MSEs) as well as provisions specifically aimed at encouraging startups. These entities can access resources and support designed to enhance their participation in the tender process, promoting inclusivity and diversity in procurement.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS