Hindustan Petroleum Corporation Ltd invites bids for the procurement of mass flow meter, flow computers, and FRLS cables (3CX2.5 SQMM CU, 4PX1.5 SQMM CU) with supervision charges and a 5-year CAMC. Estimated value not disclosed; EMD ₹4,75,000. Location is Mumbai, Maharashtra. The scope includes multiple items (BOQ shows 6 items, with 4 cable/monitoring categories). An option clause allows ±25% quantity variance at contract, with delivery timing anchored to the original delivery period, minimum 30 days extension. Purchase preference favors MSEs and Make In India under PP-LC; integrity pact is mandatory.
Product categories include: mass flow meter, flow computers, FRLS copper cables (3CX2.5 SQMM), FRLS signal cables (4PX1.5 SQMM).
EMD amount: ₹4,75,000.
Option clause allows ±25% quantity variance; delivery period adjustments based on extended quantity ratio with minimum 30 days.
Make In India/PP-LC preferences apply; bidder must be manufacturer for goods; near L-1 price may be matched by MSEs.
Integrity Pact is mandatory; upload scanned copy with bid.
EMD of ₹4,75,000 required with bid submission
Quantity may vary up to 25% during contract
MSE Make In India preference and local content policy applicable
Not explicitly stated in data; HPCL terms apply post-award; ensure compliance with EMD and delivery schedules as per contract.
Delivery period anchored to the last date of original delivery order; additional time calculated as (Increase quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Not specified in data; penalties likely governed by HPCL standard terms and Integrity Pact.
Manufacturer status for offered goods to avail MSE preference
Compliance with Make In India and PP-LC policies
Submission of PAN, GSTIN, EFT Mandate, and Integrity Pact
Quantity
4009
Category
SUPPLY OF MASS FLOW METER
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
SUPPLY OF MASS FLOW METER , SUPPLY OF FLOW COMPUTERS , SUPPLY-3CX2.5SQMM CU FRLS POWER CABLE , SUPPLY-4PX1.5SQMM CU FRLS SIGNAL CABLE , SUPERVISION CHARGES , 5 YEAR CAMC
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
27
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
150
Delivery Locations
1
Delivery Cities
Mumbai
Delivery Pincodes
400022
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mukesh Kumar Bhil | 400022,7th Floor, B-wing, E&P RCF Priyadarshini Building Eastern Express Highway Sion Mumbai | Mumbai | Maharashtra | 400022 | 2 | 150 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
SUPPLY OF MASS FLOW METER
as per tender documents
SUPPLY OF FLOW COMPUTERS
as per tender documents
SUPPLY-3CX2.5SQMM CU FRLS POWER CABLE
as per tender documents
SUPPLY-4PX1.5SQMM CU FRLS SIGNAL CABLE
as per tender documents
SUPERVISION CHARGES
as per tender documents
5 YEAR CAMC
as per tender documents
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SUPPLY OF MASS FLOW METER | as per tender documents | 2 | eac | con357.hpcl.mh | 150 | |
| 2 | SUPPLY OF FLOW COMPUTERS | as per tender documents | 2 | eac | con357.hpcl.mh | 150 | |
| 3 | SUPPLY-3CX2.5SQMM CU FRLS POWER CABLE | as per tender documents | 2,000 | mr | con357.hpcl.mh | 150 | |
| 4 | SUPPLY-4PX1.5SQMM CU FRLS SIGNAL CABLE | as per tender documents | 2,000 | mr | con357.hpcl.mh | 150 | |
| 5 | SUPERVISION CHARGES | as per tender documents | 4 | md | con357.hpcl.mh | 150 | |
| 6 | 5 YEAR CAMC | as per tender documents | 1 | ls | con357.hpcl.mh | 1,825 |
Extended Deadline
07-Oct-2026, 9:30 am
Opening Date
08-Oct-2026, 9:30 am
Extended Deadline
03-Oct-2026, 9:30 am
Opening Date
04-Oct-2026, 9:30 am
PAN Card
GSTIN
Cancelled Cheque
EFT Mandate certified by Bank
Integrity Pact signed/uploaded
Vendor Code Creation documents
OEM authorizations (if applicable for mass flow meter and CAMC)
Any corporate financials and prior experience certificates (as per internal HPCL terms)
Key insights about MAHARASHTRA tender market
Bidders must meet eligibility criteria including manufacturer status for goods, provide PAN, GSTIN, cancelled cheque, EFT mandate, and signed Integrity Pact. Submit EMD of ₹4,75,000 and ensure compliance with Make In India and local content policy. The option clause allows ±25% quantity variance with appropriate delivery extensions.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, signed Integrity Pact, OEM authorizations if applicable, and vendor code creation details. Also include financial statements or experience certificates per HPCL vendor policy.
Key categories cover mass flow meters, flow computers, FRLS copper cables (3CX2.5 SQMM), FRLS signal cables (4PX1.5 SQMM), supervision charges, and a 5-year CAMC service. The data does not specify additional performance specs; bidders should verify compatibility with HPCL systems.
EMD is ₹4,75,000. It acts as a security deposit to ensure bid seriousness and compliance; it is typically refundable if the bidder is not awarded and may be forfeited for breach of terms or non-performance as per HPCL policy.
Quantity variation can be up to ±25% of the bid quantity at contract placement and during the currency of the contract, with delivery timing adjusted via the option clause and a minimum 30-day extension in the calculated period.
Bids favor MSEs and require proof of manufacture for the offered goods; documentation under PP-LC policy No. FP-20013/2/2017-FP-PNG is applicable; non-MSEs must meet price-band and eligibility criteria to avail Make In India preferences.