Bid Publish Date
15-Jul-2026, 11:57 am
Bid End Date
31-Aug-2026, 3:00 pm
Location
Progress
Bharat Heavy Electricals Limited (BHEL), a premier power equipment supplier, invites bids for Speed Sensor with all end connectors fitted in ready-to-use condition for the BHEL 3-Phase TM IM 3302AZ assembly. The scope covers 10 NOS of dual-channel hall-effect speed sensors with cables, connectors, and mating connectors as per PS4452683 Rev.02 and PQC/PS4452683 Rev.02. Delivery is to BHEL EMRP stores, MIDC, Andheri (E), Mumbai 400093 with free delivery to stores. The contract includes a firm price, a 12-month warranty from supply, and a delivery-flexible option clause to accommodate quantity variations up to 25% with extended delivery periods. The arrangement emphasizes strict packing standards and material-test documentation, aiming to ensure compatibility with BHEL’s TM IM 3302AZ configuration. The procurement emphasizes precise conformity to the referenced specifications and a robust acceptance mechanism to minimize post-delivery concerns.
Product/service names and categories: Dual-channel Hall-effect speed sensor with connectors
Quantities: 10 NOS
Estimated value: Not specified
Experience: Prior supply of similar sensors to OEMs desirable
Quality/standards: PS4452683 Rev.02; PQC PS4452683 Rev.02; SPEED SENSOR Rev.01
Delivery: Free delivery to BHEL EMRP MIDC Andheri (E) Mumbai 400093
Warranty: 12 months from date of supply
Payment: 90 days; 45 days for MSE, 60 days for Medium Vendors
Packing: Wooden boxes; risk of rejection for damage
LD: 0.5% per week up to 10% of basic price
Option clause enabling quantity variation up to 25%
Firm price with no variation during supply
90-day payment terms with special OEM/SME concessions
Wooden packing and damage-free transit requirement
Delivery to BHEL stores at Mumbai facility
12-month warranty and MTC compliance
Payment shall be released within 90 days after material receipt and acceptance; MSE vendors enjoy 45-day terms; no advance against Proforma invoices; HSn/SAC code required on invoice
Delivery to commence per order; option to extend up to 25% quantity with extended delivery period; LD at 0.5% per week with max 10% of basic price
LD of 0.5% per week (part thereof) up to a maximum of 10% of basic price for delayed deliveries; applies per item/supply lot
Experience in supplying dual-channel Hall-effect speed sensors for OEM-grade applications
Ability to meet PS4452683 Rev.02 and PQC PS4452683 Rev.02 compliance
Financial stability evidenced by last two years of financial statements
Quantity
10
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
1 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SPEED SENSOR WITH ALL END CONNECTORS FITTED IN READY TO USE CONDITION FOR BHEL 3-PHASE TM IM 3302AZ
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
84
Delivery Locations
1
Delivery Cities
Mumbai Suburban
Delivery Pincodes
400093
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Vishnu Tulshiram Ukarde | 400093,Electrical Machines Repair Plant, Bharat Heavy Electrical Limited, Plot No. D1, Cross road-C, MIDC, Andheri(East), Mumbai | Mumbai Suburban | Maharashtra | 400093 | 10 | 84 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
24-Aug-2026, 9:30 am
Opening Date
24-Aug-2026, 10:00 am
Extended Deadline
10-Aug-2026, 9:30 am
Opening Date
10-Aug-2026, 10:00 am
Extended Deadline
03-Aug-2026, 9:30 am
Opening Date
03-Aug-2026, 10:00 am
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar speed sensor supply
Financial statements for last 2 financial years
EMD submission document (if applicable by procurement policy)
Technical bid documents demonstrating PS4452683 Rev.02 compliance
OEM authorizations or approvals for the specific speed sensor model
Material Test Certificate (MTC) aligned to PS4452683 Rev.02
Invoice-related declarations with HSN/SAC code
Packing and shipping compliance documents (wooden box packing)
Key insights about MAHARASHTRA tender market
Bidders must submit GST, PAN, experience certificates, financials, and MTC aligned to PS4452683 Rev.02; OEM authorization is required for the specified dual-channel hall-effect sensor; ensure 90-day payment term and 0.5% weekly LD with 10% cap, plus wooden packing for shipping.
Required documents include GST registration, PAN, last two years financials, experience certificates on similar sensors, MTC per PS4452683 Rev.02, OEM Authorization, and HSn/SAC code on invoice; packing/shipping declarations are also asked for with delivery to Andheri store.
The tender requires conformance to Specification No. PS4452683 Rev.02 and PQC/PS4452683 Rev.02; acceptance norms reference SPEED SENSOR Rev.01; ensure dual-channel Hall-effect sensor with required connectors and mating parts per PS4452683.
Payment terms specify 90 days from delivery and acceptance, with 45 days for MSE vendors and 60 days for medium vendors; invoices must include HSN/SAC codes and compliant documentation after store receipt.
Delivery is to BHEL EMRP stores, MIDC, Andheri (E), Mumbai 400093; the supplier must ensure free delivery to this location and proper wooden packing to prevent transit damage.
Late delivery incurs 0.5% per week or part thereof as liquidated damages, up to a maximum of 10% of the basic price; applies to the item(s) delivered beyond contractual delivery period.
The bid covers 10 NOS of speed sensors; a 12-month warranty from the date of supply is specified, with material-test certification required for acceptance per PS4452683 Rev.02.
The purchaser may vary order quantity by up to 25%, with delivery time adjusted proportionally; the time extension follows the calculation (Extended quantity ÷ Original quantity) × Original delivery period, minimum 30 days.