TenderDekho Logo
GEM

East Central Railway True RMS Clamp Meter Tender Nalanda Bihar 2025 - 2 Year OEM Warranty & 25% Quantity Option

Bid Publish Date

29-Oct-2025, 4:40 pm

Bid End Date

10-Nov-2025, 5:00 pm

Progress

Issue29-Oct-2025, 4:40 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

6

Bid Type

Single Packet Bid

Categories 6

Tender Overview

East Central Railway invites bids for the supply of true rms clamp meter to be delivered at Nalanda, Bihar 801301. Scope covers performative delivery of goods with an emphasis on on-time supply to railway workshop/consignee. The contract allows a quantity variation of up to 25% of the bid quantity during placement and within the contract period at contracted rates. A two-year warranty is required from final acceptance or post-installation, with OEM certificates to be supplied at delivery. The bidder must ensure availability of service centers in the state of each consignee and establish a center within 30 days of award if not existing. Distinctive terms include post-receipt inspection at consignee site and pre-dispatch inspection only if ATC select. The tender emphasises a straightforward supply scope, with the delivery timeline anchored to the original delivery order, and option-based extension as per formula. This procurement targets buyers seeking compliant, warranty-backed clamp meters under Indian Railways procurement norms, with explicit after-sales support requirements and a clear quality/security posture.

Technical Specifications & Requirements

  • Product category: true rms clamp meter
  • Warranty: 2 years from final acceptance or project completion; OEM warranty certificates required at delivery
  • Inspection: Post Receipt Inspection at consignee; Pre-dispatch inspection if selected in ATC; Nominated Inspection Agency as per buyer's choice
  • Scope: Scope of supply is strictly the supply of goods; no maintenance included unless specified
  • Delivery option: Quantity may be increased up to 25% during contract; time extension formula applies with minimum 30 days; delivery commences from last date of original delivery order
  • Service network: Functional service centers in the state of each consignee location; establish within 30 days if not already present
  • Quality/standards: Not specified in the data; bidders must align with OEM guidelines and railway procurement norms for electrical test instruments

Terms, Conditions & Eligibility

  • EMD/Payment terms: Not specified in provided data; bidders should anticipate EMD as per standard GEM norms and payment terms aligned to delivery milestones
  • Delivery timeline: Delivery period commences from the last date of original delivery order; extended delivery time tied to quantity variation as per clause
  • Documentation: OEM authorizations, installation and maintenance capabilities, and service center details to be uploaded
  • Warranty/after-sales: 2-year warranty; service center presence mandatory; installation/training/maintenance support to be demonstrated
  • Inspection: Post-receipt inspection at consignee site; pre-dispatch inspection may be selected via ATC
  • Variation clause: Option to increase quantity by 25% at contracted rates; extension mechanics defined in terms
  • Eligibility: Suppliers must be able to demonstrate capability to supply within railway procurement framework and provide post-sales support in India

Key Specifications

    • Product category: true rms clamp meter
    • Warranty: 2 years from final acceptance or after installation/commissioning completion
    • Inspection: Post-receipt at consignee; pre-dispatch inspection if ATC requires
    • Delivery scope: Only supply of goods; maintenance/AMC not explicitly included unless stated
    • Variation: Up to 25% quantity increase during contract with proportional delivery time

Terms & Conditions

  • Key Term 1: 25% quantity variation allowed during order and contract period

  • Key Term 2: 2-year OEM warranty with certificates submitted at delivery

  • Key Term 3: Service centres required in each consignee state; establish within 30 days if absent

Important Clauses

Payment Terms

Not explicitly defined in data; bidders should expect standard GEM terms with milestone-based payments aligned to delivery/acceptance

Delivery Schedule

Delivery period starts from the last date of the original delivery order; option to extend for increased quantity with minimum 30 days

Penalties/Liquidated Damages

Not specified in provided information; include in bid as per standard contractual penalties and SLA compliance

Bidder Eligibility

  • Experience in supplying electrical testing instruments to government/railway sector

  • Demonstrated ability to establish/maintain service centers in the bidder's state

  • Compliance with OEM warranty and post-sales support requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

true rms clamp meter (Q3)

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-8455165.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates of supplying similar electrical test instruments

4

Financial statements / turnover proof as required by tender

5

EMD document as per GEM/2025 norms

6

Technical bid documents demonstrating compliance with product category

7

OEM authorization / authorized distributor certificate

8

Details of Service Centre in the State of each consignee location

9

OEM certificates for clamp meter and installation/commissioning capabilities

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for true rms clamp meter tender in Nalanda Bihar 2025?

To bid, prepare GST, PAN, and experience certificates, submit OEM authorization, demonstrate service center capability in each consignee state, and provide OEM warranty certificates. Ensure compliance with the 2-year warranty, post-receipt inspection terms, and 25% quantity variation provision.

What documents are required for East Central Railway clamp meter procurement in 2025?

Required documents include GST certificate, PAN, experience certificates for similar instruments, financial statements, EMD documentation, technical bid, OEM authorization, and service center details in the consignee state, with OEM warranty certificates at delivery.

What are the inspection requirements for the clamp meter tender in Bihar?

Post-receipt inspection at the consignee site is mandated; pre-dispatch inspection applies only if selected in ATC. The inspection may be carried out by the designated agency chosen by the buyer and documented in the ATC.

What is the warranty period for the clamp meters in this tender?

The warranty is 2 years from final acceptance or after installation/commissioning completion, with OEM warranty certificates required at the time of delivery and service support arranged by the seller.

What is the quantity variation clause for this East Central Railway bid?

The purchaser may increase or decrease the quantity up to 25% of the bid quantity at contract award and during the contract term, with delivery time adjusted by the specified formula and a minimum of 30 days.

What are the service center requirements for bidders in this clamp meter tender?

Bidders must have a functional service centre in the state of each consignee; if not present at bidding, establish one within 30 days of award, with documentary evidence provided prior to payment release.

What is the scope of supply for this tender for clamp meters in Railways?

Scope is strictly the supply of goods (clamp meters); maintenance/AMC is not explicitly included unless stated, with post-sale service centers and warranty coverage as per OEM terms.

What standards or certifications are required for this clamp meter procurement?

The data specifies OEM warranty and standard Indian Railways procurement practices; specific standard numbers are not listed, but bidders should align with typical QA/QC and safety standards for electrical test instruments.