TenderDekho Logo
Active GEM

Government Tender Published for Supply of High wall mounted split AC,Installation and Commissioning,Supply and fixing of interconne in HYDERABAD, TELANGANA

Bid Publish Date

22-Aug-2026, 6:20 pm

Bid End Date

02-Sep-2026, 7:00 pm

Progress

Issue22-Aug-2026, 6:20 pm
AwardPending

Bharat Dynamics Limited announces a tender for Supply of High wall mounted split AC, Installation and Commissioning, Supply and fixing of interconnecting copper pipe, Supply and fixing of MS angle Heavy stand, Supply and fixing of PVC drain pipe, Supply and fixing of 4 core 2 and half sqmm cable in HYDERABAD, TELANGANA. Quantity: 122. Submission Deadline: 02-09-2026 19: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

122

Category

Supply of High wall mounted split AC

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of High wall mounted split AC , Installation and Commissioning , Supply and fixing of interconnecting copper pipe , Supply and fixing of MS angle Heavy stand , Supply and fixing of PVC drain pipe , Supply and fixing of 4 core 2 and half sqmm cable

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Hyderabad

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-HyderabadHyderabad--415-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9795346.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Supply of High wall mounted split AC

As per Technical spec

4 each Delivery: 15 days
#2

Installation and Commissioning

As per Technical spec

4 each Delivery: 15 days
#3

Supply and fixing of interconnecting copper pipe

As per Technical spec

40 meters Delivery: 15 days
#4

Supply and fixing of MS angle Heavy stand

As per Technical spec

4 each Delivery: 15 days
#5

Supply and fixing of PVC drain pipe

As per Technical spec

30 meters Delivery: 15 days
#6

Supply and fixing of 4 core 2 and half sqmm cable

As per Technical spec

40 meters Delivery: 15 days

Categories 13

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data