REWINDING OF MOTOR - 0.5 HP,REWINDING OF MOTOR - 1 HP,REWINDING OF MOTOR - 3 HP,REWINDING OF MOTOR
Hindustan Petroleum Corporation Ltd
TIRUVALLUR, TAMIL NADU
Bid Publish Date
28-Nov-2024, 4:30 pm
Bid End Date
09-Dec-2024, 5:00 pm
Progress
Quantity
2955
Category
Sply and Instltn of Borewell Casing
Bid Type
Two Packet Bid
Hindustan Petroleum Corporation Ltd has released a public tender for Sply and Instltn of Borewell Casing, Repair of borewell, Sply and Instltn of Borewell Starter, Repair of Borewell Pump, Rewinding Borewell Motor 3HP, Rewinding Borewell Motor 5HP, Rewinding of 0. 25HP 3 Phase, Rewinding of 1 HP 3 phase, Rewinding of 3 HP 3 phase, Rewinding of 5 HP 3 phase, Rewinding of 7. 5 HP 3 phase, Rewinding of 25 HP 3 phase, Rewinding of 50 HP 3 phase, Rewinding of 75 HP 3 phase, Sply and Fabrictn Fire Engine Starter, Overhauling of Jockey Pump, Repair of Solar UPS, Supply of Battery 42AH, Supply of Battery 100AH, Supply of Battery 180AH, Supply of Battery 120AH, Supply Chain Pulley block, 6Sqmm Earthing Cable, Battery Terminal Brass clamp, Battery Terminal Cover, AC AMC Vist, AC installation, AC Out door Motor, AC Contactor Supply, AC Capacitor Supply. Quantity: 2955. Submission Deadline: 09-12-2024 17: 00: 00. Download documents and apply online.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
TIRUVALLUR, TAMIL NADU
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
Indian Army
JAMMU, JAMMU & KASHMIR
Bharat Sanchar Nigam Limited Portal(bsnl)
KRISHNA, ANDHRA PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Sply and Instltn of Borewell Casing | Supply and installation of borewell casing. Supply of casing. Hiring of Machineryu, carrying out work, all works required for completion of the job is under scope of work | 600 | ft | shubhamanand | 730 |
| 2 | Repair of borewell | Repair of Borewell. Removing Borewell Motor and Pump using machinery. Repalcing the Pumpand motor. | 12 | ea | shubhamanand | 730 |
| 3 | Sply and Instltn of Borewell Starter | Supply and Installation of Borewell Starter | 1 | ea | shubhamanand | 730 |
| 4 | Repair of Borewell Pump | Overhauling of Borewell pump to working condition. Including transportation of item to and from plant premises | 5 | ea | shubhamanand | 730 |
| 5 | Rewinding Borewell Motor 3HP | Rewinding of Borewell motor 3HP. Scope included to and fro transportation | 3 | ea | shubhamanand | 730 |
| 6 | Rewinding Borewell Motor 5HP | Rewinding of Borewell motor 5HP. Scope included to and fro transportation | 5 | ea | shubhamanand | 730 |
| 7 | Rewinding of 0.25HP 3 Phase | Rewinding of 0.25HP 3 Phasescope includes transportation to and fro | 10 | ea | shubhamanand | 730 |
| 8 | Rewinding of 1 HP 3 phase | Rewinding of 1 HP 3 phasescope includes transportation to and fro | 10 | ea | shubhamanand | 730 |
| 9 | Rewinding of 3 HP 3 phase | Rewinding of 3 HP 3 phasescope includes transportation to and fro | 25 | ea | shubhamanand | 730 |
| 10 | Rewinding of 5 HP 3 phase | Rewinding of 5 HP 3 phasescope includes transportation to and fro | 40 | ea | shubhamanand | 730 |
| 11 | Rewinding of 7.5 HP 3 phase | Rewinding of 7.5 HP 3 phasescope includes transportation to and fro | 25 | ea | shubhamanand | 730 |
| 12 | Rewinding of 25 HP 3 phase | Rewinding of 25 HP 3 phasescope includes transportation to and fro | 5 | ea | shubhamanand | 730 |
| 13 | Rewinding of 50 HP 3 phase | Rewinding of 50 HP 3 phasescope includes transportation to and fro | 3 | ea | shubhamanand | 730 |
| 14 | Rewinding of 75 HP 3 phase | Rewinding of 75 HP 3 phasescope includes transportation to and fro | 2 | ea | shubhamanand | 730 |
| 15 | Sply and Fabrictn Fire Engine Starter | Supply and Fixing of Fire engine starter Kirlosker | 5 | ea | shubhamanand | 730 |
| 16 | Overhauling of Jockey Pump | Supply of required materials and overhauling of Jockey pump, 20HP | 2 | ea | shubhamanand | 730 |
| 17 | Repair of Solar UPS | Repair of Solar Invertor . Replacement of Power card | 1 | ea | shubhamanand | 730 |
| 18 | Supply of Battery 42AH | Supply of Battery 42AH | 12 | ea | shubhamanand | 730 |
| 19 | Supply of Battery 100AH | Supply of Battery 100AH | 8 | ea | shubhamanand | 730 |
| 20 | Supply of Battery 180AH | Supply of Battery 180AH | 12 | ea | shubhamanand | 730 |
| 21 | Supply of Battery 120AH | Supply of Battery 120AH | 16 | ea | shubhamanand | 730 |
| 22 | Supply Chain Pulley block | Supply Chain Pulley block | 1 | ea | shubhamanand | 730 |
| 23 | 6Sqmm Earthing Cable | 6Sqmm Earthing Cable | 2,000 | m | shubhamanand | 730 |
| 24 | Battery Terminal Brass clamp | Battery Terminal Brass clamp | 50 | ea | shubhamanand | 730 |
| 25 | Battery Terminal Cover | Battery Terminal Cover | 50 | ea | shubhamanand | 730 |
| 26 | AC AMC Vist | AC AMC Visit . , as and when required by Plant. Includes cleaning of AC, Filter. Rectification of issue | 32 | ea | shubhamanand | 730 |
| 27 | AC installation | Ac installation and replacement work | 5 | ea | shubhamanand | 730 |
| 28 | AC Out door Motor | AC Out door Motor | 5 | ea | shubhamanand | 730 |
| 29 | AC Contactor Supply | AC Contactor Supply | 5 | ea | shubhamanand | 730 |
| 30 | AC Capacitor Supply | AC Capacitor Supply | 5 | ea | shubhamanand | 730 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
To participate, bidders must be registered entities with at least 1 year of relevant past experience. Additionally, they should demonstrate a minimum average annual turnover of 5 Lakh (s), ensuring they possess the financial capability to undertake the work.
Bidders are required to submit various certificates, including credentials for experience criteria, documents confirming past performance, turnover certificates, and any other additional documents as requested in the ATC.
Bidders must ensure their registration on the GeM portal and then submit their bids through the mentioned platform, complying with all procedural requirements laid out in the tender documentation.
All submitted documents must be in easily viewable formats such as PDF. Any documentation requested or auxiliary materials supporting the bid should adhere to this format for proper evaluation.
Bidders must comply with the Bill of Quantities (BoQ) specifications and any additional technical requirements specified in the tender documentation to ensure successful execution of the contract.
Yes, bidders are required to adhere to stringent quality standards as per the BoQ document guidelines and past benchmarks that have been specified in prior tender evaluations.
Bidders must comply with all eligibility and technical specifications outlined in the tender notice. It includes financial criteria, documentation requirements, and adherence to stipulated timelines for submissions.
Yes, submissions will undergo a thorough evaluation process to ascertain compliance with all technical, financial, and operational criteria as outlined in the tender documentation.
Specific amounts concerning the EMD will be detailed in the main tender documentation available via the provided links. Bidders are encouraged to review these details carefully to comply fully.
Bidders will be required to provide performance security as per the contractual obligations upon tender award. The specifics regarding the amount and tenor will be clarified during the contract discussion phase.
Payment terms will be outlined in the tender documentation and will typically reflect the agreed timeline upon successful completion of various project milestones as identified in the tender.
The price evaluation will occur based on the total value-wise assessment of the bids received. Bidders should ensure that their price remains competitive while adhering to quality standards as specified.
Bids must be submitted electronically through the GeM portal, ensuring adherence to all outlined processes for successful bid retrieval and evaluation.
While specific deadlines fluctuate, they can be found in the official tender documents. Bidders should ensure they familiarize themselves with all critical dates, especially regarding submission and evaluation.
Bidders will be notified via the GeM portal post-evaluation of the bids. Successful bidders will receive formal communication detailing the next steps.
The tender promotes the participation of MSEs, providing benefits including possible exemptions on certain criteria. The detailed provisions will be affirmed in the ATC documentation.
Bidders must furnish necessary declarations and compliance documents evidencing adherence to the 'Make in India' initiatives that favor locally sourced products as per the outlined terms of the tender.
Yes, bidders must evaluate their offerings in line with local content and procurement rules that support government initiatives aimed at promoting domestic manufacturing.
This comprehensive set of FAQs aims to guide potential bidders through the intricacies of participation in the specified tender, ensuring clarity and fostering informed decisions.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS