TenderDekho Logo
GEM

Open Tender for Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 26,Prosthesis Articulated Energy St in PANCHKULA, HARYANA

Bid Publish Date

18-Jun-2025, 1:40 pm

Bid End Date

09-Jul-2025, 2:00 pm

EMD

₹424

Progress

RA
Issue18-Jun-2025, 1:40 pm
Reverse Auction25-Sep-2025, 11:00 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3095

Category

Tube Clamp ,Long

Bid Type

Two Packet Bid

Categories 39

Public procurement opportunity for Indian Army Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 26, Prosthesis Articulated Energy St in PANCHKULA, HARYANA. Quantity: 3095 issued by. Submission Deadline: 09-07-2025 14: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7914560.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 94 Items Sign in for GEM prices

#1

Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 26

as per uploaded file

1 no Delivery: 28 days
#2

Prosthesis Articulated Energy Storing Foot Activity 2 Right Size 27

as per uploaded file

1 no Delivery: 28 days
#3

Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 27

as per uploaded file

1 no Delivery: 28 days
#4

PVA Bags Box of 10 Pcs 100x26x5

as per uploaded file

6 no Delivery: 28 days
#5

Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 24

as per uploaded file

1 no Delivery: 28 days
#6

Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 25

as per uploaded file

1 no Delivery: 28 days
#7

Prosthesis Articulated Energy Storing Foot Activity 2 right Size 24

as per uploaded file

1 no Delivery: 28 days
#8

Prosthesis Articulated Energy Storing Foot Activity 2 Right Size 25

as per uploaded file

1 no Delivery: 28 days
#9

Prosthesis Articulated Energy Storing Foot Activity 2 Right Size 26

as per uploaded file

1 no Delivery: 28 days
#10

PVA Bags Box of 10 Pcs 100cmx30cmx5cm

as per uploaded file

5 box Delivery: 28 days
#11

BK Belt PTB belt Rt

as per uploaded file

15 no Delivery: 28 days
#12

PVA Bags Box of 10 Pcs 130x22x5

as per uploaded file

5 no Delivery: 28 days
#13

BK Belt PTB belt Lt

as per uploaded file

15 no Delivery: 28 days
#14

Foot Impression Foam Pad

as per uploaded file

6 no Delivery: 28 days
#15

Hardening powder for resin

as per uploaded file

600 gm Delivery: 28 days
#16

Hydraulic Knee joint with lamination anchor and other accessories

as per uploaded file

1 no Delivery: 28 days
#17

JBR Rubber Sole 1 mtr x1mtr

as per uploaded file

3 sheet Delivery: 28 days
#18

Metal rectaangular D rings 1 to 1 oblique 4 ,1

as per uploaded file

30 pkt Delivery: 28 days
#19

Pedding Sheet

as per uploaded file

10 sheet Delivery: 28 days
#20

Pedilin , Caucasian 4mm

as per uploaded file

8 sheet Delivery: 28 days
#21

Pedilin , Caucasian 6 mm

as per uploaded file

10 sheet Delivery: 28 days
#22

Pedilin , Caucasian 2mm

as per uploaded file

10 sheet Delivery: 28 days
#23

Pigment Paste , Caucasian Skin Colour

as per uploaded file

600 gm Delivery: 28 days
#24

Plastozoate, Skin Colour 4MM

as per uploaded file

4 sheet Delivery: 28 days
#25

Plastozoate, Skin Colour 6MM

as per uploaded file

4 sheet Delivery: 28 days
#26

Prosthesis Articulated Energy Storing Foot Activity 3 Left Size 27

as per uploaded file

1 no Delivery: 28 days
#27

Prosthesis Articulated Energy Storing Foot Activity 3 Left Size 24

as per uploaded file

1 no Delivery: 28 days
#28

Prosthesis Articulated Energy Storing Foot Activity 3 Left Size 25

as per uploaded file

1 no Delivery: 28 days
#29

Prosthesis Articulated Energy Storing Foot Activity 3 Left Size 26

as per uploaded file

1 no Delivery: 28 days
#30

Prosthesis Articulated Energy Storing Foot Activity 3 Right Size 24

as per uploaded file

1 no Delivery: 28 days
#31

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core or Plastic Keel with Foot Shell size 26 Lt

as per uploaded file

1 no Delivery: 28 days
#32

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core or Plastic Keel with Foot Shell size 27 Lt

as per uploaded file

1 no Delivery: 28 days
#33

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core or Plastic Keel with Foot Shell size 27 Rt

as per uploaded file

1 no Delivery: 28 days
#34

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core or Plastic Keel with Foot Shell Size 25 Lt

as per uploaded file

1 no Delivery: 28 days
#35

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core or Plastic Keel with Foot Shell Size 25 Rt

as per uploaded file

1 no Delivery: 28 days
#36

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core or Plastic Keel with Foot Shell Size 26 Rt

as per uploaded file

1 no Delivery: 28 days
#37

Prosthesis Four Bar Polycentric Mechanical Knee Joint with lamination anchor and other accerssories

as per uploaded file

1 no Delivery: 28 days
#38

Rotatable Socket Adaptor For AK

as per uploaded file

6 no Delivery: 28 days
#39

sach foot adaptor

as per uploaded file

40 no Delivery: 28 days
#40

Silicone Liner With Pin AK 3mmx34cm

as per uploaded file

1 no Delivery: 28 days
#41

Silicone Liner With Pin AK 3mmx36cm

as per uploaded file

1 no Delivery: 28 days
#42

Silicone Liner With Pin AK 3mmx38cm

as per uploaded file

1 no Delivery: 28 days
#43

Silicone Liner With Pin AK 3mmx40cm

as per uploaded file

1 no Delivery: 28 days
#44

Silicone Liner With Pin AK 3mmx42cm

as per uploaded file

1 no Delivery: 28 days
#45

Silicone Liner With Pin AK 3mmx45cm

as per uploaded file

1 no Delivery: 28 days
#46

Socket Adaptor With Pyramid Adaptor

as per uploaded file

60 no Delivery: 28 days
#47

Stump Socks AK Size XL

as per uploaded file

15 no Delivery: 28 days
#48

Stump Socks AK Size L

as per uploaded file

15 no Delivery: 28 days
#49

Stump Socks AK Size M

as per uploaded file

15 no Delivery: 28 days
#50

Stump Socks BK Size L

as per uploaded file

13 no Delivery: 28 days
#51

Stump Socks BK Size M

as per uploaded file

12 no Delivery: 28 days
#52

Stump Socks BK Size XL

as per uploaded file

14 no Delivery: 28 days
#53

Suspension Sleeve BK

as per uploaded file

9 no Delivery: 28 days
#54

Tape Insulation Plastic

as per uploaded file

30 roll Delivery: 28 days
#55

Thermolyn Clear 12mm

as per uploaded file

4 sheet Delivery: 28 days
#56

AK Cosmetic Stockings

as per uploaded file

15 no Delivery: 28 days
#57

BK Cosmetic Stockings

as per uploaded file

30 no Delivery: 28 days
#58

Brass wire Mesh Soft

as per uploaded file

6 sq ft Delivery: 28 days
#59

Buckle Sliding 1

as per uploaded file

90 no Delivery: 28 days
#60

Diabetic Socks

as per uploaded file

15 pair Delivery: 28 days
#61

AK waist belt

as per uploaded file

6 no Delivery: 28 days
#62

BK Foam Covering

as per uploaded file

15 no Delivery: 28 days
#63

Foam Cover AK

as per uploaded file

6 no Delivery: 28 days
#64

Tube Clamp ,Long

as per uploaded file

60 no Delivery: 28 days
#65

Tube Clamp Adapter

as per uploaded file

60 no Delivery: 28 days
#66

Cotton Stockinette 90 mm

as per uploaded file

120 mtr Delivery: 28 days
#67

Synthetic Rubber Adhesive Fevicol

as per uploaded file

9 ltr Delivery: 28 days
#68

thinner

as per uploaded file

6 ltr Delivery: 28 days
#69

Woven Carbon Fibre Stockinette

as per uploaded file

6 mtr Delivery: 28 days
#70

Plastozoate, Sheet 10MM

as per uploaded file

6 sheet Delivery: 28 days
#71

4 Pronged pyramid Adaptor BK

as per uploaded file

60 no Delivery: 28 days
#72

Shuttle Lock Shuttle Lock consisting of Three Leg Lamination Anchor with pyramid, Height 25mm, Max Body Weight 125 Kg

as per uploaded file

6 no Delivery: 28 days
#73

Suction Valve Screw Valve Kit AK

as per uploaded file

3 no Delivery: 28 days
#74

Suspension Sleeve AK Rt Size Large

as per uploaded file

3 no Delivery: 28 days
#75

Suspension Sleeve AK Lt Size Med

as per uploaded file

3 no Delivery: 28 days
#76

Suspension Sleeve AK Lt Size Small

as per uploaded file

3 no Delivery: 28 days
#77

Suspension Sleeve AK Rt Size Small

as per uploaded file

3 no Delivery: 28 days
#78

Suspension Sleeves BK Large

as per uploaded file

6 no Delivery: 28 days
#79

Suspension Sleeves BK Medium

as per uploaded file

6 no Delivery: 28 days
#80

Suspension Sleeves BK Small

as per uploaded file

6 no Delivery: 28 days
#81

Tape cotton special 1 25mm

as per uploaded file

100 mtr Delivery: 28 days
#82

Tape Cotton Special 5 oblique 8

as per uploaded file

40 mtr Delivery: 28 days
#83

Tape Hook and Loop fastener velcro 1 Black Colour

as per uploaded file

60 mtr Delivery: 28 days
#84

Tape Hook and Loop fastener velcro 5 oblique 8

as per uploaded file

60 mtr Delivery: 28 days
#85

Thermolyn PP Sheet 5mm

as per uploaded file

3 sheet Delivery: 28 days
#86

Tube clamp adapter Stainless Steel 30 mm Dia upto 100 Kg Body Weight, Height 33mm and Weight 110 gm to 130gm

as per uploaded file

60 no Delivery: 28 days
#87

Prosthesis Articulated Energy Storing Foot Activity 3 Right Size 25

as per uploaded file

1 no Delivery: 28 days
#88

Prosthesis Articulated Energy Storing Foot Activity 3 Right Size 27

as per uploaded file

1 no Delivery: 28 days
#89

Microballon, White

as per uploaded file

600 gm Delivery: 28 days
#90

Long Tube Adapter Stainless Steel, Length Height 18 or 460mm, Weight 310 gm to 330 gm, Body Weight up to 100 Kg

as per uploaded file

9 no Delivery: 28 days
#91

Nylon Gel Socks Large

as per uploaded file

5 no Delivery: 28 days
#92

Nylon Gel Socks Med

as per uploaded file

5 no Delivery: 28 days
#93

Nylon Gel Socks Small

as per uploaded file

5 no Delivery: 28 days
#94

Wooven Carbon fiber Stockinette 100 mm x 5m 4

as per uploaded file

6 mtr Delivery: 28 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

25-Sep-2025, 11:00 am

End

08-Oct-2025, 10:00 am

Duration: 311 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-08-07-2025 18:00:07
2
**********   Under PMA
-09-07-2025 12:01:22
3
**********   Under PMA
-07-07-2025 19:48:16
4
**********   Under PMA
-03-07-2025 16:36:37
5
**********   Under PMA
-09-07-2025 11:33:03
6
**********   Under PMA
-08-07-2025 13:42:48
7
**********   Under PMA
-08-07-2025 18:17:09
8
**********   Under PMA
-08-07-2025 15:25:17

Frequently Asked Questions

Key insights about HARYANA tender market

What are the eligibility requirements for GEM/2025/B/6297819?

The eligibility requirements include being a registered entity that meets all necessary safety and quality standards. Bidders must also demonstrate prior experience in delivering medical equipment and hold relevant certifications. All bidders wishing to participate should ensure compliance with specific industry regulations.

What technical specifications must the prosthetics meet?

Technical specifications for the Prosthesis Articulated Energy Storing Foot require compliance with international safety standards, such as ISO. The products must demonstrate durability, functionality, and be designed to cater to the needs of users, particularly in military applications.

What are the Earnest Money Deposit (EMD) details for this tender?

The Earnest Money Deposit (EMD) is a pre-requisite for all bidders as a guarantee of their commitment to the terms of the tender. The amount will be specified in the tender documents, and failure to submit the EMD may lead to disqualification of the bid.

How should documents be submitted for the procurement process?

Documents must be submitted electronically via the government’s e-marketplace (GEM) platform. Accepted formats for submission include PDF and DOCX. All proposals must be complete and comply with the outlined submission criteria.

What benefits are provided for Micro, Small, and Medium Enterprises (MSEs)?

MSEs can enjoy preferential treatment under this tender, which may include lowered financial thresholds and additional evaluation points in the bidding process. This supports local enterprises and promotes diversity within governmental procurement initiatives.