Bid Publish Date
19-Jan-2026, 11:59 am
Bid End Date
29-Jan-2026, 12:00 pm
Location
Progress
Quantity
8
Category
De-humidifier for sandmodel room
Bid Type
Two Packet Bid
Organization: Indian Army (Department Of Military Affairs). Procurement: de-humidifier for sandmodel room, heavy duty stabilizer, water temperature control unit, inverter, and 200 Ah battery. Location: India (Military sector). Quantity/Value: not disclosed; total items listed as 5 with no BOQ quantities. Context: equipment intended for unit area climate control and power management; emphasizes product demonstration and adherence to delivery flexibility. Unique aspects: option to increase/decrease quantity up to 25% during and after contract; delivery period adjustments based on quantity variance.
Product/service names identified in tender: de-humidifier for sandmodel room, heavy duty stabilizer, water temperature control unit, inverter, 200 Ah battery
BOQ indicates 5 items but no disclosed quantities or units
Estimated value not provided; EMD amount not disclosed
Experience/qualification not specified; demonstration requirement explicitly stated
Delivery terms include quantity variation up to 25% and extended delivery periods based on formula
Quantity may be increased or decreased by 25% at contract placement and during currency
Mandatory product demonstration before technical evaluation
Delivery period adjustments based on extended quantity; minimum 30 days
Not explicitly stated in available data; bidders should anticipate standard government terms once tender is issued
Delivery period can be extended proportionally to quantity changes; minimum extension is 30 days
Not specified in provided data; examine final terms for LD policy during contract award
Eligibility to participate under Department Of Military Affairs tender rules
Ability to demonstrate product specifications at Unit Area
Compliance with potential OEM authorizations and standard government submission norms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
De-humidifier for sandmodel room , heavy duty stablizer , water temperature control unit , Inverter , 200 Ah battery
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
De-humidifier for sandmodel room
De-humidifier for sandmodel room
heavy duty stablizer
heavy duty stablizer
water temperature control unit
water temperature control unit
Inverter
Inverter with 200Ah battery
200 Ah battery
200 Ah battery
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | De-humidifier for sandmodel room | De-humidifier for sandmodel room | 2 | pieces | consignee39 | 10 | |
| 2 | heavy duty stablizer | heavy duty stablizer | 2 | pieces | consignee39 | 10 | |
| 3 | water temperature control unit | water temperature control unit | 2 | pieces | consignee39 | 10 | |
| 4 | Inverter | Inverter with 200Ah battery | 1 | pieces | consignee39 | 10 | |
| 5 | 200 Ah battery | 200 Ah battery | 1 | pieces | consignee39 | 10 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing prior similar implementations
Financial statements (annual reports or audited statements)
EMD submission proof (as per purchaser policy)
Technical bid documents demonstrating compliance
OEM authorization letters (where applicable)
Product demonstration data and specifications alignment
Any other bidder registration documents as required by terms
Key insights about UTTAR PRADESH tender market
Bidders should prepare GST, PAN, experience certificates, financial statements, and EMD proof, then submit a technical bid with OEM authorizations. Demonstration data must be ready for unit-area verification, and compliance with the 25% quantity variation clause should be demonstrated in the bid plan.
Required documents include GST certificate, PAN card, experience certificates of similar deployments, audited financial statements, EMD submission proof, technical bid demonstrating product compliance, OEM authorizations, and unit-area demonstration schedules as per terms.
Exact technical specs are not disclosed in the data; the bid requires demonstration at Unit Area to verify alignment with sandmodel room humidity control, plus compliance with the listed equipment: de-humidifier, heavy duty stabilizer, water temperature control unit, inverter, and 200 Ah battery.
Delivery period is adjustable based on quantity variation with a minimum extension of 30 days. The start date is not specified; bidders should plan for staged delivery aligned to last date of the original delivery order.
The EMD amount is not disclosed in the provided data; bidders should monitor the official tender notice for the exact EMD percentage or fixed amount and mode (DD/online).
Contractual quantity may be increased or decreased by up to 25% at placement and during currency. Delivery time adjusts using (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, with extension possible up to the original delivery period.
Bidders must demonstrate the quoted product at the Unit Area to verify specifications; failure to demonstrate can lead to rejection during technical evaluation. Prepare a live demonstration plan and ensure all claimed features are verifiable.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS