Progress
Hindustan Aeronautics Limited (HAL), under the Department of Defence Production, invites bids for a CNC VERTICAL TURNING LATHE. The tender scope is defined at the category level with no BOQ items currently listed, and the exact location or project site remains unspecified. An ATC document has been uploaded, indicating buyer-specific terms beyond standard procurement rules. The tender references a 2026 procurement cycle, with no explicit estimated value or EMD disclosed. Bidders should prepare for a highly specialized machine procurement aligned with defence manufacturing standards. The lack of itemized quantities or schedule details calls for careful clarification requests during bid preparation. A unique ATC nuance may govern compliance and delivery expectations, requiring bidders to review the uploaded file prior to submission.
Product: CNC VERTICAL TURNING LATHE
Quantity: Not disclosed in BOQ
Estimated value: Not disclosed
Experience: Defence manufacturing vendor experience advantageous
Standards: To be confirmed in ATC (possible IS/ISO alignment)
EMD amount and payment terms to be verified in ATC
Delivery timeline and installation obligations require ATC confirmation
Submission must include GST, PAN, risk/finance documents and OEM authorization
Payment terms to be defined in ATC; bidders should confirm milestone payments and any advance against delivery.
Delivery schedule and installation responsibilities to be confirmed via ATC; ensure alignment with HAL DoDP requirements.
LD provisions, warranty obligations, and performance bonds to be clarified in ATC.
Experience in supplying CNC turning lathes, preferably with defence-related projects
Demonstrated financial stability (supporting financial statements in bid)
Authorized OEM or credible reseller with necessary certifications
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CNC VERTICAL TURNING LATHE
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
610
Delivery Locations
1
Delivery Cities
Tumkur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tumkur | Tumkur | - | - | 1 | 610 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar CNC turning lathe supply
Financial statements (last 2-3 years)
EMD/SECURITY deposit proof as per ATC
Technical bid documents demonstrating CNC lathe capabilities
OEM authorization letter (if not a HAL supplier)
Key insights about KARNATAKA tender market
Bidders should review the uploaded ATC, prepare GST and PAN documents, obtain OEM authorization if not a HAL supplier, and submit technical bids with CNC lathe capabilities. Ensure compliance with any IS/ISO standards specified in ATC and provide EMD details as directed.
Required documents include GST certificate, PAN card, company profile, experience certificates for similar lathe supply, recent financial statements, EMD proof, technical compliance documents, and OEM authorization if applicable, all as per the ATC.
Delivery terms are not disclosed in the data; bidders must verify the ATC for delivery schedule, installation responsibilities, and site readiness prior to submission.
Standards may include IS/ISO compliance as indicated in the ATC; bidders should confirm specific standard numbers and certification bodies in the ATC before bidding.
EMD amount is not disclosed here; verify exact EMD details, payment mode, and submission deadline in the ATC and the procurement portal instructions.
The BOQ contains no items currently; the ATC will define scope, potential single-unit or multi-unit procurement, and related installation or commissioning work.