TenderDekho Logo
Active GEM

Metnet SITC Modular Laboratory Furniture System Tender Lucknow Uttar Pradesh 2026

Bid Publish Date

14-Aug-2026, 5:43 pm

Bid End Date

04-Sep-2026, 6:00 pm

Progress

Issue14-Aug-2026, 5:43 pm
AwardPending

Key Highlights

  • Option clause permitting ±25% quantity variation during contract execution
  • Mandatory functional Service Centre in each consignee state or establish within 30 days of award
  • Dedicated toll-free service line and dedicated escalation matrix for service support
  • Supply, Installation, Testing & Commissioning (SITC) of Modular Laboratory Furniture System

Tender Overview

The tender is issued by Metnet : An E-governance Intra-imd Portal, New Delhi on behalf of the India Meteorological Department for the Supply, Installation, Testing & commissioning (SITC) of Modular Laboratory Furniture System in Lucknow, Uttar Pradesh 226001. The scope covers end-to-end delivery including installation and commissioning of the furniture system. The supplier must include all costs in the bid and adhere to the option clause allowing up to 25% quantity variation during and after the contract period. The procurement emphasizes on delivery efficiency and complete turnkey execution from supply to commissioning.

Technical Specifications & Requirements

  • Scope of supply: Supply, Installation, Testing and Commissioning of Modular Laboratory Furniture System as a single turnkey package.
  • Delivery flexibility: Option to increase/decrease quantity by up to 25% at contract rates; extended delivery time calculation based on (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days.
  • Service capability: Must have a functional Service Centre in the state of each consignee location for carry-in warranty; if not present, establish one within 30 days of award; payment released only after submitting evidence of the Service Centre.
  • Support amenities: Dedicated toll-free service number and an escalation matrix for service support.
  • BOQ status: No BOQ items listed; bidders should prepare to cover all components of SITC within the offered package and demonstrate feasibility of full installation and commissioning.

Terms, Conditions & Eligibility

  • EMD/validation: Not specified in the data; bidders should verify at bid submission stage.
  • Delivery timeline: Delivery period aligned to original delivery order; extensions possible per option clause with defined calculation method.
  • Payment terms: Payment linked to documentary evidence of functional Service Centre; exact schedule not provided.
  • Warranty/Support: On-site or carry-in warranty as applicable; service center availability is mandatory for carry-in warranty scenarios.
  • ATC compliance: Adherence to buyer-specified ATC terms; provider must view the ATC document for any additional clauses.
  • Documentation: Assemble standard bid documents, including GST, PAN, experience certificates, and OEM authorizations if required, as per terms.

Key Specifications

  • Modular Laboratory Furniture System

  • Turnkey SITC scope including supply, installation, testing, commissioning

  • Service Centre presence in consignee state or 30-day establishment plan

  • Dedicated toll-free service line and escalation matrix

  • No explicit quantitative BOQ data provided; bidders to provide full installation and commissioning details

Terms & Conditions

  • Option clause allows ±25% quantity variation with proportional delivery extension

  • Service centre existence mandatory; evidence required for payment release

  • ATC and bidder terms to be verified from ATC document; adhere to service escalation requirements

Important Clauses

Payment Terms

Payment will be released after submission of documentary evidence of having a Functional Service Centre; exact schedule not specified.

Delivery Schedule

Delivery period starts from the last date of original delivery order; extended period for increased quantity calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Not detailed in the provided data; bidders should check ATC and contract terms for LD provisions.

Bidder Eligibility

  • Functional service capability in the state of the consignee or plan to establish within 30 days of award

  • Experience in SITC of modular laboratory furniture or similar turnkey installations

  • Compliance with service support requirements including toll-free lines and escalation matrix

Tender Data

Bid Details

Quantity

1

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

4

OEM Avg. Turnover

32

Past Performance

80 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply, Installation, Testing & Commissioning (SITC) of Modular Laboratory Furniture System with Gra

Advisory Bank

State Bank of India

ePBG Percentage

1%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Lucknow

Delivery Pincodes

226009

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Hari Mangal Pandey226009,Meteorological Centre, CCS Airport, AmausiLucknowUttar Pradesh226009145-

Authority Records

MINISTRY OF EARTH SCIENCESINDIA METEOROLOGICAL DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9759914.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Categories 8

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates of similar SITC projects

4

Financial statements demonstrating financial health

5

EMD/Security deposit documentation (as per bid terms)

6

Technical bid documents showing SITC capability

7

OEM authorizations or manufacturer declarations (if required)

8

Evidence of functional Service Centre or plan to establish within 30 days

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for modular laboratory furniture SITC tender in Lucknow?

Submit all required bid documents (GST, PAN, experience certificates, financials) and demonstrate SITC capability; ensure presence or plan to establish a Service Centre in Uttar Pradesh within 30 days of award; consult ATC terms for any additional clauses.

What documents are required for the Lucknow SITC furniture bid 2026?

Provide GST certificate, PAN card, experience certificates for similar SITC projects, financial statements, EMD documentation, OEM authorizations if needed, and proof of a functional service centre or plan to establish one within 30 days of award.

What are the delivery terms for quantity variation in this tender?

The buyer reserves the right to vary quantity up to 25% at contract rates; delivery time adjusts based on (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

What service support is required for the modular furniture SITC bid?

Bidders must provide a dedicated toll-free service line and an escalation matrix; functional Service Centre in the consignee state is mandatory or to be established within 30 days of award; payment is contingent on evidence of service capability.

What is the procurement organization for the Lucknow furniture SITC tender?

The tender is issued by Metnet: An E-governance Intra-imd Portal on behalf of the India Meteorological Department for the SITC of Modular Laboratory Furniture System in Lucknow, Uttar Pradesh.

Are BOQ items specified for this SITC laboratory furniture tender?

No BOQ items are listed in the provided data; bidders should document a comprehensive turnkey SITC plan covering all furniture, installation, testing, and commissioning as part of the bid.

What is required to prove service capability for payment release?

Submit documentary evidence of having a Functional Service Centre in the relevant state; if not present, demonstrate readiness to establish one within 30 days of award, enabling payment processing.

What should bidders review in the ATC terms for this tender?

Bidders must view the Buyer Uploaded ATC document to understand any additional conditions; ATC may include special clauses on warranties, penalties, or performance criteria beyond the main terms.