Bid Publish Date
29-Oct-2025, 12:45 pm
Bid End Date
10-Nov-2025, 3:00 pm
Location
Progress
Quantity
17
Category
1300076152
Bid Type
Two Packet Bid
Mangalore Refinery & Petrochemicals Limited (MRPL) seeks bids via GeM for a broad Materials Department procurement, with 10 BoQ items yet to be detailed. The tender specifies an option clause allowing up to 25% quantity variation at contracted rates, and a flexible delivery timeline tied to the original delivery period. Bidders must assess GST implications independently, as MRPL will reimburse GST only to the extent of actuals or the lower of quoted rates, subject to GST cap. For vendor code creation, bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate. Invoice must be raised in the consignee’s name with its GSTIN. The contract permits termination for non-compliance, delivery failure, insolvency, or misrepresentation. The nominated Inspection Agency will be selected by MRPL on behalf of the buyer.
10 BoQ items with unspecified quantities
Option to increase/decrease quantity up to 25% of bid/contract quantity
Delivery period calculated using: (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
GST applicability to be determined by bidder; reimbursement as actuals or lower quoted rate
Invoice to be raised in consignee name with consignee GSTIN
Nominated Inspection Agency to be appointed by MRPL
Option Clause allowing ±25% quantity variation at contracted rates
GST and invoicing rules tied to consignee details and GSTIN
Vendor code prerequisites: PAN, GSTIN, cancelled cheque, EFT mandate
GST reimbursement limited to actuals or lower of quoted GST rate; payment terms not specified beyond GeM submission
Delivery period starts from last date of original delivery order; extended time for increased quantity follows (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Contract termination rights exist for non-delivery, delay, insolvency, misrepresentation, and other material breaches
Submit PAN and GSTIN for vendor code creation
Provide EFT mandate and cancelled cheque
Comply with GeM portal invoicing requirements and GST proof
Ability to deliver within extended delivery period per option clause
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
1300076152 , 1300076153 , 1300076154 , 1300076155 , 1300076156 , 1300076207 , 1300076208 , 1300076234 , 1057868
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
1300076152
RESCUE LIFTING DESCENDING DEVICE 60 M
1300076153
RESCUE CROSS ARM STRAP BOTH SIDE
1300076154
RESCUE EVACUATION TRIANGLE ROPE LIFTING
1300076155
FULL BODY HARNESS FOR RESUE ROPE ACCESS
1300076156
RESCUE STRETCHER WITH ROPE LIFTING
1300076207
POLYAMIDE ROPE14MM50M LONG
1300076208
FALL ARRESTORGUIDED TYPE
1300076234
PARAPET ANCHOR
1057868
1 st year testing for rescue equipments
1057868
2 nd year testing for rescue equipments
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 1300076152 | RESCUE LIFTING DESCENDING DEVICE 60 M | 1 | pieces | sunil_materials | 45 | |
| 2 | 1300076153 | RESCUE CROSS ARM STRAP BOTH SIDE | 2 | pieces | sunil_materials | 45 | |
| 3 | 1300076154 | RESCUE EVACUATION TRIANGLE ROPE LIFTING | 2 | pieces | sunil_materials | 45 | |
| 4 | 1300076155 | FULL BODY HARNESS FOR RESUE ROPE ACCESS | 2 | pieces | sunil_materials | 45 | |
| 5 | 1300076156 | RESCUE STRETCHER WITH ROPE LIFTING | 2 | pieces | sunil_materials | 45 | |
| 6 | 1300076207 | POLYAMIDE ROPE14MM50M LONG | 1 | pieces | sunil_materials | 45 | |
| 7 | 1300076208 | FALL ARRESTORGUIDED TYPE | 1 | pieces | sunil_materials | 45 | |
| 8 | 1300076234 | PARAPET ANCHOR | 2 | pieces | sunil_materials | 45 | |
| 9 | 1057868 | 1 st year testing for rescue equipments | 2 | pieces | sunil_materials | 410 | |
| 10 | 1057868 | 2 nd year testing for rescue equipments | 2 | pieces | sunil_materials | 775 |
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by bank
GST invoice copy (for GeM upload) and GST payment screenshot
Vendor code creation documents
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | INDUSCARE EQUIPMENTS Under PMA | - | 10-11-2025 09:12:41 | |
| 2 | SARVAM SAFETY EQUIPMENT PRIVATE LIMITED Under PMA | - | 08-11-2025 14:26:31 | |
| 3 | USHA FIRE AND SAFETY EQUIPMENTS Under PMA | - | 04-11-2025 17:38:35 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | USHA FIRE AND SAFETY EQUIPMENTS Under PMA | Item Categories : 1300076152,1300076153,1300076154,1300076155,1300076156,1300076207,1300076208,1300076234,1057868,105 | |
| L2 | SARVAM SAFETY EQUIPMENT PRIVATE LIMITED Under PMA | Item Categories : 1300076152,1300076153,1300076154,1300076155,1300076156,1300076207,1300076208,1300076234,1057868,105 |
Please sign in or create an account to view contract details and download result documents.
Key insights about KARNATAKA tender market
Bidders must register on GeM, prepare PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation. Ensure GST compliance and upload GST invoice proof. The tender allows up to 25% quantity variation and requires adherence to MRPL delivery terms starting from the original order date.
Submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide GST invoice and GST payment screenshot on GeM. Ensure vendor code creation documents are complete and aligned with MRPL terms. Maintain records for GST reimbursements and delivery compliance.
Delivery periods adjust with quantity changes via: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days. The option can extend the delivery window during the contract currency while keeping contracted rates.
MRPL reimburses GST at actuals or the lower of the quoted GST rate, subject to the maximum quoted GST percentage. Vendors must provide GST invoices and payment confirmations on GeM.
MRPL will appoint a Nominated Inspection Agency; bidders should be ready to cooperate with the selected agency and provide requested material samples, documentation, and delivery readiness as per contract terms.
Key terms include vendor code creation documents, GST compliance, and contract termination rights for non-performance or delivery failure. Ensure timely delivery and accurate invoicing to avoid termination risk.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS