TenderDekho Logo
Closed GEM

Tender Notice for ITW Dynatec PCB ASSY DynaControl V6 BASE,ITW Dynatec PCB ASSY DynaControl V6 TEMP,ITW Dynatec PCB A in NASHIK, MAHARASHTRA

Bid Publish Date

02-Apr-2026, 2:41 pm

Bid End Date

23-Apr-2026, 3:00 pm

EMD

₹1,01,000

Value

₹50,48,049

Generate Docs

Progress

Issue02-Apr-2026, 2:41 pm
Corrigendum16-Apr-2026
AwardPending

A tender has been published for Security Printing And Minting Corporation Of India Limited (spmcil) ITW Dynatec PCB ASSY DynaControl V6 BASE, ITW Dynatec PCB ASSY DynaControl V6 TEMP, ITW Dynatec PCB ASY DynaControl V6 XIO, ITW Dynatec ASSY V6 ETHERNET SP PT, ITW Dynatec PCB ASY V6 SSR ADAPT, ITW Dynatec PCB ASSY V6 POWER, ITW Dynatec PCB ASSY V6 LCD HMI, ITW Dynatec ADPTR SNSR GRID, ITW Dynatec ASY FULL PCB MAIN V6, ITW Dynatec SNSR RTD HPR NOR, ITW Dynatec SNSR RTD HPR DCL, ITW Dynatec PROBE ASY HPR LVL SNSR, ITW Dynatec ASSY LVL SNSR CONTROL, ITW Dynatec ASSY SW AS OT DM, ITW Dynatec SWITCH DPDT RCKER, ITW Dynatec Fuse 10A Time Delay 5X20, ITW Dynatec FUSE 2A 230V 20MM GDC, ITW Dynatec PCB ASSY V6 AUX in NASHIK, MAHARASHTRA. Quantity: 41 by. Submission Deadline: 23-04-2026 15: 00: 00. Check eligibility and apply.

Advertisement

Authority & Contact

Organization

Security Printing And Minting Corporation Of India Limited (spmcil)

Tender Data

Bid Details

Quantity

41

Category

ITW Dynatec PCB ASSY DynaControl V6 BASE

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

7 Days

Requirements

Past Performance

40 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

ITW Dynatec PCB ASSY DynaControl V6 BASE , ITW Dynatec PCB ASSY DynaControl V6 TEMP , ITW Dynatec PCB ASY DynaControl V6 XIO , ITW Dynatec ASSY V6 ETHERNET SP PT , ITW Dynatec PCB ASY V6 SSR ADAPT , ITW Dynatec PCB ASSY V6 POWER , ITW Dynatec PCB ASSY V6 LCD HMI , ITW Dynatec ADPTR SNSR GRID , ITW Dynatec ASY FULL PCB MAIN V6 , ITW Dynatec SNSR RTD HPR NOR , ITW Dynatec SNSR RTD HPR DCL , ITW Dynatec PROBE ASY HPR LVL SNSR , ITW Dynatec ASSY LVL SNSR CONTROL , ITW Dynatec ASSY SW AS OT DM , ITW Dynatec SWITCH DPDT RCKER , ITW Dynatec Fuse 10A Time Delay 5X20 , ITW Dynatec FUSE 2A 230V 20MM GDC , ITW Dynatec PCB ASSY V6 AUX

Authority Records

MINISTRY OF FINANCEECONOMIC AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9039107.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 19 Items Sign in for GEM prices

#1

ITW Dynatec PCB ASSY DynaControl V6 BASE

ITW Dynatec PCB ASSY DynaControl V6 BASE

2 ea Delivery: 98 days
#2

ITW Dynatec PCB ASSY DynaControl V6 TEMP

ITW Dynatec PCB ASSY DynaControl V6 TEMP

2 ea Delivery: 98 days
#3

ITW Dynatec PCB ASY DynaControl V6 XIO

ITW Dynatec PCB ASY DynaControl V6 XIO

2 ea Delivery: 98 days
#4

ITW Dynatec ASSY V6 ETHERNET SP PT

ITW Dynatec ASSY V6 ETHERNET SP PT

2 ea Delivery: 98 days
#5

ITW Dynatec PCB ASY V6 SSR ADAPT

ITW Dynatec PCB ASY V6 SSR ADAPT

2 ea Delivery: 98 days
#6

ITW Dynatec PCB ASSY V6 POWER

ITW Dynatec PCB ASSY V6 POWER

2 ea Delivery: 98 days
#7

ITW Dynatec PCB ASSY V6 LCD HMI

ITW Dynatec PCB ASSY V6 LCD HMI

3 ea Delivery: 98 days
#8

ITW Dynatec ADPTR SNSR GRID

ITW Dynatec ADPTR SNSR GRID

1 ea Delivery: 98 days
#9

ITW Dynatec ASY FULL PCB MAIN V6

ITW Dynatec ASY FULL PCB MAIN V6

3 ea Delivery: 98 days
#10

ITW Dynatec SNSR RTD HPR NOR

ITW Dynatec SNSR RTD HPR NOR

3 ea Delivery: 98 days
#11

ITW Dynatec ASY FULL PCB MAIN V6

ITW Dynatec ASY FULL PCB MAIN V6

2 ea Delivery: 98 days
#12

ITW Dynatec SNSR RTD HPR DCL

ITW Dynatec SNSR RTD HPR DCL

3 ea Delivery: 98 days
#13

ITW Dynatec PROBE ASY HPR LVL SNSR

ITW Dynatec PROBE ASY HPR LVL SNSR

1 ea Delivery: 98 days
#14

ITW Dynatec ASSY LVL SNSR CONTROL

ITW Dynatec ASSY LVL SNSR CONTROL

2 ea Delivery: 98 days
#15

ITW Dynatec ASSY SW AS OT DM

ITW Dynatec ASSY SW AS OT DM

1 ea Delivery: 98 days
#16

ITW Dynatec SWITCH DPDT RCKER

ITW Dynatec SWITCH DPDT RCKER

1 ea Delivery: 98 days
#17

ITW Dynatec Fuse 10A Time Delay 5X20

ITW Dynatec Fuse 10A Time Delay 5X20

5 ea Delivery: 98 days
#18

ITW Dynatec FUSE 2A 230V 20MM GDC

ITW Dynatec FUSE 2A 230V 20MM GDC

2 ea Delivery: 98 days
#19

ITW Dynatec PCB ASSY V6 AUX

ITW Dynatec PCB ASSY V6 AUX

2 ea Delivery: 98 days

Corrigendum Updates

1 Update
#1

Update

16-Apr-2026

Extended Deadline

23-Apr-2026, 9:30 am

Opening Date

23-Apr-2026, 10:00 am

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer