TenderDekho Logo
Active GEM

Indian Army Avadi Energy Metering & LT Metering Box Supply Tender 2026 - IS/ standards, EMD ₹29,830, 4G DCU

Bid Publish Date

07-Oct-2026, 10:17 am

Bid End Date

17-Oct-2026, 11:00 am

EMD

₹29,830

Progress

Issue07-Oct-2026, 10:17 am
AwardPending

Tender Overview

The Indian Army, Department of Military Affairs, invites bids for a comprehensive energy metering and LT metering infrastructure package. Scope includes bi-directional solar meters, AMR/4G DCU with SIM, cloud charges, LT metering boxes, CT/PT provisioning, transmission and installation services, and associated calibration. Estimated quantity scale is defined by contract awards with a flexible quantity option up to 25% as per acceptance, and delivery cadence linked to final delivery orders. The procurement targets AVADI, Tamil Nadu, with post-delivery inspection at the consignee site. The bid emphasizes turnkey installation, configuration, and related charges under a single supply and service contract, with emphasis on adherence to required standards and supplier capability. A key differentiator is the integrated cloud and network-based data provisioning over a five-year horizon, including SIM charges and DCU connectivity. The opportunity covers multiple system components to support LT metering and solar net metering installations in the specified location.

Technical Specifications & Requirements

  • Item scope includes: Bi-Directional energy meters, LT metering boxes, single compartment powder-coated gasket-sealed LT meters housing, AMR/GPRS/4G DCU with SIM slot, cloud charges for 5 years, and CT/PT provisioning for full system operation.
  • Standards/Compliance: No explicit standards listed in tender data; bidders should infer compatibility with LT metering and solar net metering ecosystem; ensure CT/PT compatibility and proper insulation and enclosure integrity for outdoor environments.
  • Deliverables: Installation, configuration, and commissioning of the complete metering system at GARRISON ENGINEER AVADI, MILITARY ENGINEERS SERVICES, with post-installation testing.
  • Inspection: Post-receipt inspection at the consignee location; pre-dispatch inspection not indicated; on-site acceptance governed by ATC and BIS/IS conformity as applicable.
  • Commercials: EMD of ₹29,830; optional quantity adjustments up to 25%; payment and performance safeguards per terms; DD payable to COMMANDER WORKS ENGINEERS, Chennai.

Terms, Conditions & Eligibility

  • EMD: ₹29,830 via Demand Draft; submit proof with bid, hard copy to Buyer within 5 days of bid end/opening.
  • Turnover: Minimum average annual turnover in last three years, evidenced by audited accounts or CA certificate; details aligned with bid document criteria.
  • Delivery: Delivery period linked to original delivery order; option-driven quantity increases trigger proportional delivery timelines with minimum 30 days extension; extension rules apply.
  • Inspection: Post-receipt inspection at consignee site; purchaser reserves right to select inspection agency.
  • Payment: Terms to be as per contract; ensure submission of GST, PAN, and relevant financial documents; bidders must not be under liquidation or similar proceedings.
  • Documentation: Upload required bid documents including EMD proof, turnover evidence, financial statements, and certification attestations; ensure OEM/authorizations where applicable.

Key Specifications

  • Bi-Directional energy meters with LT compatibility

  • LT metering box with powder-coated gasket-sealed single compartment enclosure

  • AMR/GPRS/4G DCU with SIM slot and monthly SIM charges

  • Cloud data charges for 5 years

  • CT/PT provisioning for complete system

Terms & Conditions

  • EMD ₹29,830; payable via account DD to COMMANDER WORKS ENGINEERS, Chennai

  • Delivery terms: 25% quantity variation allowed; delivery period adjusts with options

  • Inspection at consignee location; post-receipt inspection regime enforced

Important Clauses

Payment Terms

Payment terms to be as per contract; EMD submitted via DD; ensure submission of DD proof with bid.

Delivery Schedule

Option to increase quantity up to 25%; delivery period extends proportionally with quantity; minimum extension 30 days.

Penalties/Liquidated Damages

Penalties/LDs to be specified in contract; ensure compliance with installation and commissioning timelines.

Bidder Eligibility

  • Minimum average annual turnover as specified in bid document for last 3 financial years

  • Not under liquidation or similar financial proceedings

  • Must possess capability for turnkey metering installation, calibration, and commissioning at AVADI, Tamil Nadu

Advertisement

Tender Data

Bid Details

Quantity

48

Category

Supply and fixing testing and calibration including necessary transport of direct connected Bi-Directional energy meter Solar meter work to be excecuted as mentioned in the scope of work

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

Past Performance

10 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply and fixing testing and calibration including necessary transport of direct connected Bi-Directional energy meter Solar meter work to be excecuted as mentioned in the scope of work , Sands AMR GPRS Modem with Sim Card slot complete , Aggregate DCU with 4G Commuinication , Sim Charges and Band with charges per month per location per annum , Modem and DCU installation and configuration charges Complete , M and L for Box for aggregator at TNEB RMG panel complete , Cloud Charges for 5 years DCU , LT Whole Current meter complete , Supply and fixing of single compartment powder coated gasket sealed LT metering box with stand for housing solar net metering with provision of work to be excecuted as mentioned in the scope of work , Calibration of LT Bi Directional meter fixed by TNEB work to be excecuted as mentioned in the scope of work including provision of and CT and PTs for complete system all as specified and as directed.

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

6

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Tiruvallur

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-TiruvallurTiruvallur--190-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9781991.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

Supply and fixing testing and calibration including necessary transport of direct connected Bi-Directional energy meter Solar meter work to be excecuted as mentioned in the scope of work

Supply and fixing testing and calibration including necessary transport of direct connected Bi-Directional energy meter Solar meter work to be excecuted as mentioned in the scope of work

1 job Delivery: 60 days
#2

Sands AMR GPRS Modem with Sim Card slot complete

Sands AMR GPRS Modem with Sim Card slot complete

8 pieces Delivery: 60 days
#3

Aggregate DCU with 4G Commuinication

Aggregate DCU with 4G Commuinication

1 pieces Delivery: 60 days
#4

Sim Charges and Band with charges per month per location per annum

Sim Charges and Band with charges per month per location per annum

9 pieces Delivery: 60 days
#5

Modem and DCU installation and configuration charges Complete

Modem and DCU installation and configuration charges Complete

8 pieces Delivery: 60 days
#6

M and L for Box for aggregator at TNEB RMG panel complete

M and L for Box for aggregator at TNEB RMG panel complete

2 pieces Delivery: 60 days
#7

Cloud Charges for 5 years DCU

Cloud Charges for 5 years DCU

1 job Delivery: 60 days
#8

LT Whole Current meter complete

LT Whole Current meter complete

8 pieces Delivery: 60 days
#9

Supply and fixing of single compartment powder coated gasket sealed LT metering box with stand for housing solar net metering with provision of work to be excecuted as mentioned in the scope of work

Supply and fixing of single compartment powder coated gasket sealed LT metering box with stand for housing solar net metering with provision of work to be excecuted as mentioned in the scope of work

2 job Delivery: 60 days
#10

Calibration of LT Bi Directional meter fixed by TNEB work to be excecuted as mentioned in the scope of work including provision of and CT and PTs for complete system all as specified and as directed.

Calibration of LT Bi Directional meter fixed by TNEB including provision of and CT and PTs for complete system all as specified and as directed.

8 pieces Delivery: 60 days
Advertisement

Categories 41

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements for last 3 years or CA certificate showing turnover

4

EMD submission proof (DD in favour of COMMANDER WORKS ENGINEERS, Chennai) and scanned copy

5

Technical bid documents and compliance statements

6

OEM authorization or authorized distributor certificate if applicable

7

Bidder undertaking on non-liquidation status

8

Delivery/completion plan and installation capability statement

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for the Indian Army AVADI energy metering tender in 2026?

Bidders must submit EMD ₹29,830 via DD to COMMANDER WORKS ENGINEERS, Chennai, along with GST, PAN, turnover proofs, and OEM authorizations. Ensure post-delivery inspection readiness at Garrison Engineer Avadi and compliance with option clause for 25% quantity changes.

What documents are required for AVADI LT metering box procurement?

Submit EMD proof (DD), GST and PAN, last 3 years turnover audited statements or CA certificate, technical bid and OEM authorization, installation capability statement, and proof of non-liquidity; upload with bid and send hard copy within 5 days of bid end date.

What is the delivery impact of the option clause in this tender?

Option clause allows up to 25% increase in quantity; delivery period will scale as (Additional quantity / Original quantity) × Original delivery period, with minimum extension of 30 days; otherwise adhere to original delivery schedule.

What are the critical eligibility criteria for this AVADI procurement?

Eligibility includes non-liquidation status, adequate turnover as per bid, capability for turnkey metering installation, installation and calibration capacity, and compliance with post-receipt inspection at the consignee site in Avadi.

Which location and organization name does this tender target for metering work?

The procurement targets AVADI, Tamil Nadu, under the Indian Army’s Military Engineers Services, with post-delivery inspection at the consignee location in Avadi.

What are the EMD and payment terms for this supply contract?

EMD is ₹29,830 via DD to COMMANDER WORKS ENGINEERS, Chennai; payment terms will be per contract, with submission of EMD proof alongside bid; adapt to delivery and commissioning milestones as stated.

Are there any specific inspection requirements for the AVADI metering project?

Yes, post-receipt inspection occurs at the consignee location; pre-dispatch inspection is not indicated unless ATC specifies; inspection agency selection is by the purchaser.

What are the core technical items included in the BOQ for this tender?

Core items include LT metering boxes, bi-directional meters (LT), AMR/GPRS DCU with SIM, cloud services for 5 years, and CT/PT provisioning for complete metering system installation and calibration.

Advertisement