Bid Publish Date
23-Jul-2026, 7:25 pm
Bid End Date
03-Aug-2026, 8:00 pm
Location
Progress
RAPublic procurement opportunity for Indian Army Modular Multiplexer, LIU 24 Port Rack Mountable, Optical to Ethernet bracket open OTE bracket close, SFP Module 1 Gig support 80 Kms on Single Fiber, Crimping Tool, CAT 6 UTP Cable bracket open 305 Mtrs Roll bracket close, UTP CAT 6 Patch Cord 5 Mtrs, USB Active Extension Cable 25 Mtrs 3 point 0 with Power, USB Active Extension Cable 10 Mtrs 3 point 0 with Power in WEST KAMENG, ARUNACHAL PRADESH. Quantity: 40 issued by. Submission Deadline: 03-08-2026 20: 00: 00. View full details and respond.
Start
25-Sep-2026, 9:00 pm
End
26-Sep-2026, 9:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
40
Category
Modular Multiplexer
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
16
Past Performance
50 %
Warranty Period
3 days
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Modular Multiplexer , LIU 24 Port Rack Mountable , Optical to Ethernet bracket open OTE bracket close , SFP Module 1 Gig support 80 Kms on Single Fiber , Crimping Tool , CAT 6 UTP Cable bracket open 305 Mtrs Roll bracket close , UTP CAT 6 Patch Cord 5 Mtrs , USB Active Extension Cable 25 Mtrs 3 point 0 with Power , USB Active Extension Cable 10 Mtrs 3 point 0 with Power
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
38
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
West Kameng
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | West Kameng | West Kameng | - | - | 4 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Modular Multiplexer
Modular Multiplexer
LIU 24 Port Rack Mountable
LIU 24 Port Rack Mountable
Optical to Ethernet bracket open OTE bracket close
Optical to Ethernet bracket open OTE bracket close
SFP Module 1 Gig support 80 Kms on Single Fiber
SFP Module 1 Gig support 80 Kms on Single Fiber
Crimping Tool
Crimping Tool
CAT 6 UTP Cable bracket open 305 Mtrs Roll bracket close
CAT 6 UTP Cable bracket open 305 Mtrs Roll bracket close
UTP CAT 6 Patch Cord 5 Mtrs
UTP CAT 6 Patch Cord 5 Mtrs
USB Active Extension Cable 25 Mtrs 3 point 0 with Power
USB Active Extension Cable 25 Mtrs 3 point 0 with Power
USB Active Extension Cable 10 Mtrs 3 point 0 with Power
USB Active Extension Cable 10 Mtrs 3 point 0 with Power
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Modular Multiplexer | Modular Multiplexer | 4 | nos | deepak5 | 60 | |
| 2 | LIU 24 Port Rack Mountable | LIU 24 Port Rack Mountable | 3 | nos | deepak5 | 60 | |
| 3 | Optical to Ethernet bracket open OTE bracket close | Optical to Ethernet bracket open OTE bracket close | 8 | nos | deepak5 | 60 | |
| 4 | SFP Module 1 Gig support 80 Kms on Single Fiber | SFP Module 1 Gig support 80 Kms on Single Fiber | 5 | nos | deepak5 | 60 | |
| 5 | Crimping Tool | Crimping Tool | 5 | nos | deepak5 | 60 | |
| 6 | CAT 6 UTP Cable bracket open 305 Mtrs Roll bracket close | CAT 6 UTP Cable bracket open 305 Mtrs Roll bracket close | 5 | roll | deepak5 | 60 | |
| 7 | UTP CAT 6 Patch Cord 5 Mtrs | UTP CAT 6 Patch Cord 5 Mtrs | 6 | nos | deepak5 | 60 | |
| 8 | USB Active Extension Cable 25 Mtrs 3 point 0 with Power | USB Active Extension Cable 25 Mtrs 3 point 0 with Power | 2 | nos | deepak5 | 60 | |
| 9 | USB Active Extension Cable 10 Mtrs 3 point 0 with Power | USB Active Extension Cable 10 Mtrs 3 point 0 with Power | 2 | nos | deepak5 | 60 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer