TenderDekho Logo
Closed GEM

Procurement Opportunity: Heat shrink Straight through joint for 66 KV 1C X 800sq mm Aluminum Conductor XLPE Cable in SOUTH WEST DELHI, DELHI

Bid Publish Date

08-Jan-2025, 12:19 pm

Bid End Date

29-Jan-2025, 1:00 pm

Progress

Issue08-Jan-2025, 12:19 pm
Technical17-01-2025 16:57:20
Financial
Award12-Aug-2025, 1:58 am
Explore all 4 tabs to view complete tender details

Quantity

25

Categories 6

Public procurement opportunity for Delhi Metro Rail Corporation Limited Heat shrink Straight through joint for 66 KV 1C X 800sq mm Aluminum Conductor XLPE Cable in SOUTH WEST DELHI, DELHI. Quantity: 25 issued by. Submission Deadline: 29-01-2025 13: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Heat shrink Straight through joint for 66 KV 1C X 800sq mm Aluminum Conductor XLPE Cable

Authority Records

MINISTRY OF HOUSING AND URBAN AFFAIRS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7346873.pdf

Main Document

Download

Referenced Document

Buyer uploaded ATC document Click here to view the file .

Referenced Document

attached categories, trials are allowed as per approved procurement policy of the buyer nodal Ministries)

Referenced Document

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
DISHA ENGINEERS   Under PMA
Make : COMPAQ Model : Heat Shrinkable Kit 66 KV 1 C X 800 Sq Title : Heat shrink Straight through joint for 66 KV 1C X 800sq mm Aluminum Conductor XLPE Cable17-01-2025 16:57:20
2
NNK INTERNATIONAL   Under PMA
Make : RAYCHEM Model : EHVS-72H-I Title : Heat shrink Straight through joint for 66 KV 1C X 800sq mm Aluminum Conductor XLPE Cable29-01-2025 12:45:27
3
SMT BALATECH SOLUTIONS (OPC) PRIVATE LIMITED   Under PMA
Make : raychem rpg Model : EHVS-72.5kV Title : Heat shrink Straight through joint for 66 KV 1C X 800sq mm Aluminum Conductor XLPE Cable29-01-2025 11:24:00

Financial Results

Rank Seller Price Item
L1
NNK INTERNATIONAL(MII)   Under PMA
Item Categories : Heat shrink Straight through joint for 66 KV 1C X 800sq mm Aluminum Conductor XLPE Cable

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about DELHI tender market

What are the eligibility requirements for this tender?

The eligibility requirements include being a registered entity, specifically adhering to the guidelines set forth by the Ministry of Housing and Urban Affairs. Bidder entities must also submit supporting documents if seeking exemptions from certain experience or turnover criteria.

What certificates are required for submission?

Bidders need to submit various documents including OEM authorization certificates, compliance statements of BoQ specifications, and any requested certificates specified in the Additional Terms and Conditions (ATC). Supporting documentation for exemption from experience may also be required.

How do I register for this tender?

To register for this tender, interested bidders must create an account on the GEM portal and comply with the registration guidelines specified by the Ministry of Housing and Urban Affairs.

What document formats are accepted for submissions?

Preferred document formats include PDF and other commonly used digital formats that ensure ease of access and security. Bidders should ensure their submissions meet the format requirements as dictated in the tender documents.

What are the technical specifications I must comply with?

The technical specifications are outlined in the main tender document. Bidders should ensure compliance with all requirements concerning the heat shrink straight through joints to ensure optimal performance and safety standards.

What quality standards must be adhered to?

Bidders must comply with specific industry quality standards relevant to the procurement of electrical components. Adherence to these standards ensures reliability and durability in the materials supplied.

What compliance requirements are there for bidders?

Bidders must meet compliance requirements as specified in the tender documents, including but not limited to product specifications, quality assurance protocols, and adherence to regulatory standards.

What are the criteria for testing the supplied materials?

Materials will undergo rigorous testing criteria outlined in the tender specifications. Bidders must ensure their products are capable of passing these tests to qualify for procurement.

What is the Earnest Money Deposit (EMD) for this tender?

The Earnest Money Deposit (EMD) amount can be found in the detailed tender document. This deposit guarantees the bidder’s commitment to the tender process and is crucial for bid submission.

What performance security requirements are outlined?

Successful bidders may be required to furnish a performance security, as specified in the tender documentation guidelines. This ensures compliance with contract terms over the project lifespan.

What are the payment terms for this tender?

Payment terms will be clarified in the final tender documentation. Bidders should review terms related to invoicing, payment schedules, and any conditions regarding payment held against performance benchmarks.

How will the pricing evaluation be conducted?

The pricing evaluation will assess bids based on a total value-wise approach. This means the overall cost to the authority will be a key factor in determining the most favorable offer.

How do I submit my bid?

Bids must be submitted electronically via the GEM portal, as outlined in the tender guidelines. Bidders should ensure all required documents are included in their submission to avoid disqualification.

What are the key timelines for this tender?

Key timelines, including bid opening and closing dates, are specified in the main tender document. Bidders must adhere to these timelines to ensure their proposals are considered.

How will I be notified of the evaluation results?

Bidders will be notified of results through official communications via the GEM portal. Results will be provided following the completion of the evaluation process as per standard protocols.

What benefits are available for Micro, Small, and Medium Enterprises (MSEs)?

MSEs can avail of various benefits aimed at enhancing their participation in government procurement processes. These benefits can include simplified bidding processes and special consideration in evaluation.

Are there provisions for startups in this tender?

The tender has special provisions that encourage participation from startups, promoting fair opportunities in the bidding process and contributing to the growth of emerging businesses.