TenderDekho Logo
Closed GEM

Tender Notice for Supply of HDPE Pipe,Supply of Stone Pad,Supply of Nut and Bolts,Supply of LT Clamp,Supply of LT Sha in ETAH, UTTAR PRADESH

Bid Publish Date

18-May-2026, 3:14 pm

Bid End Date

18-Jun-2026, 4:00 pm

EMD

₹6,000

Value

₹6,00,000

Generate Docs

Progress

Issue18-May-2026, 3:14 pm
Corrigendum13-Jun-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

12470

Category

Erection of PCC Pole 8.5 M

Bid Type

Two Packet Bid

Categories 52

Uttar Pradesh Power Corporation Limited (uppcl) invites bids for Supply of HDPE Pipe, Supply of Stone Pad, Supply of Nut and Bolts, Supply of LT Clamp, Supply of LT Shackle isolator, Supply of I Hook, Supply of Dead and Clamp, Supply of Suspension Clamp, Supply of PG Clamp, Supply of Number Plate, Supply of GI Pipe, Supply of PRC Connector, Safe Carriage of PCC 8. 5 M Pole, Safe Carriage of PCC 9 M Pole, Safe Carriage of ST Pole 11 M Pole, Safe Carriage of ST Pole 13 M Pole, Safe Carriage of 33 KV Jointing Kit O D, Safe Carriage of 33 KV XLPE Cable, Safe Carriage of LT AB Cable, Safe Carriage of 3 Ph. Distribution Box, Safe Carriage of 33 KV Cross Arm V Type, Safe Carriage of 33 KV F Clamp, Safe Carriage of 33 KV Pin Insulator, Safe Carriage of 33 KV Pin with Nut, Safe Carriage of Earthing Complete, Erection of PCC Pole 8. 5 M, Erection of PCC Pole 9 M, Erection of PCC Pole 11 M, Erection of PCC Pole 13 M, Dismentalling of LT AB Cable, Erection of LT AB Cable, Erection of 33 KV XLPE Cable, Erection of Cable Jointing Kit O D, Erection of Stone Pad, Erection of Number Plate, Erection of Earthing Complete, Erection of Distribution Box with Clamp, Erection of GI Pipe, Erection of HDPE Pipe, Carriage of Old Material in ETAH, UTTAR PRADESH. Quantity: 12470. Submission Deadline: 18-06-2026 16: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of HDPE Pipe , Supply of Stone Pad , Supply of Nut and Bolts , Supply of LT Clamp , Supply of LT Shackle isolator , Supply of I Hook , Supply of Dead and Clamp , Supply of Suspension Clamp , Supply of PG Clamp , Supply of Number Plate , Supply of GI Pipe , Supply of PRC Connector , Safe Carriage of PCC 8.5 M Pole , Safe Carriage of PCC 9 M Pole , Safe Carriage of ST Pole 11 M Pole , Safe Carriage of ST Pole 13 M Pole , Safe Carriage of 33 KV Jointing Kit O D , Safe Carriage of 33 KV XLPE Cable , Safe Carriage of LT AB Cable , Safe Carriage of 3 Ph. Distribution Box , Safe Carriage of 33 KV Cross Arm V Type , Safe Carriage of 33 KV F Clamp , Safe Carriage of 33 KV Pin Insulator , Safe Carriage of 33 KV Pin with Nut , Safe Carriage of Earthing Complete , Erection of PCC Pole 8.5 M , Erection of PCC Pole 9 M , Erection of PCC Pole 11 M , Erection of PCC Pole 13 M , Dismentalling of LT AB Cable , Erection of LT AB Cable , Erection of 33 KV XLPE Cable , Erection of Cable Jointing Kit O D , Erection of Stone Pad , Erection of Number Plate , Erection of Earthing Complete , Erection of Distribution Box with Clamp , Erection of GI Pipe , Erection of HDPE Pipe , Carriage of Old Material

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9344658.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 45 Items Sign in for GEM prices

#1

Supply of HDPE Pipe

140 mm OD PN-4PE-80 Grade UV Stabilized HDPE Pipe in 6 Mtr

75 m Delivery: 60 days
#2

Supply of Stone Pad

Stone Pad 300x300x75 mm

38 no Delivery: 60 days
#3

Supply of Nut and Bolts

Nut Bolts off size

23 kg Delivery: 60 days
#4

Supply of LT Clamp

LT Clamp for PCC Pole

138 no Delivery: 60 days
#5

Supply of LT Shackle isolator

LT Shackle isolator

90 no Delivery: 60 days
#6

Supply of Nut and Bolts

Nut and Bolts for LT Shackle isolator

110 kg Delivery: 60 days
#7

Supply of I Hook

I Hook

42 no Delivery: 60 days
#8

Supply of Dead and Clamp

Dead and Clamp

16 no Delivery: 60 days
#9

Supply of Suspension Clamp

Suspension Clamp

47 no Delivery: 60 days
#10

Supply of PG Clamp

PG Clamp

6 no Delivery: 60 days
#11

Supply of Number Plate

Number Plate

23 no Delivery: 60 days
#12

Supply of GI Pipe

GI Pipe 6 inch Dia

6 m Delivery: 60 days
#13

Supply of PRC Connector

PRC Connector

28 no Delivery: 60 days
#14

Safe Carriage of PCC 8.5 M Pole

Safe carriage of PCC 8.5 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

47 no Delivery: 60 days
#15

Safe Carriage of PCC 9 M Pole

Safe carriage of PCC 9 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

7 no Delivery: 60 days
#16

Safe Carriage of ST Pole 11 M Pole

Safe carriage of ST Pole 11 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

8 no Delivery: 60 days
#17

Safe Carriage of ST Pole 13 M Pole

Safe carriage of ST Pole 13 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

8 no Delivery: 60 days
#18

Safe Carriage of 33 KV Jointing Kit O D

Safe carriage of 33 KV 3x300 sq. mm Jointing Kit O/D from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

4 no Delivery: 60 days
#19

Safe Carriage of 33 KV XLPE Cable

Safe carriage of 33 KV XLPE Cable 3x300 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

270 m Delivery: 60 days
#20

Safe Carriage of LT AB Cable

Safe carriage of LT AB Cable 3x120+1x95+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

956 m Delivery: 60 days
#21

Safe Carriage of LT AB Cable

Safe carriage of LT AB Cable 3x50+1x35+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

2,400 m Delivery: 60 days
#22

Safe Carriage of LT AB Cable

Safe carriage of LT AB Cable 3x95+1x70+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

300 m Delivery: 60 days
#23

Safe Carriage of 3 Ph. Distribution Box

Safe carriage of 3 Ph. Distribution Box from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

7 no Delivery: 60 days
#24

Safe Carriage of 33 KV Cross Arm V Type

Safe carriage of 33 KV Cross Arm V Type from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

23 no Delivery: 60 days
#25

Safe Carriage of 33 KV F Clamp

Safe carriage of 33 KV F Clamp from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

23 no Delivery: 60 days
#26

Safe Carriage of 33 KV Pin Insulator

Safe carriage of 33 KV Pin Insulator from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

69 no Delivery: 60 days
#27

Safe Carriage of 33 KV Pin with Nut

Safe carriage of 33 KV Pin with Nut from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

69 no Delivery: 60 days
#28

Safe Carriage of Earthing Complete

Safe carriage of Earthing Complete from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.

61 no Delivery: 60 days
#29

Erection of PCC Pole 8.5 M

Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

47 no Delivery: 60 days
#30

Erection of PCC Pole 9 M

Erection of 9 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

7 no Delivery: 60 days
#31

Erection of PCC Pole 11 M

Erection of 11 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

8 no Delivery: 60 days
#32

Erection of PCC Pole 13 M

Erection of 13 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms.

8 no Delivery: 60 days
#33

Dismentalling of LT AB Cable

Dismentalling of LT AB cable (3x50/3x120) sq. mm stacking of proper place.

3,356 m Delivery: 60 days
#34

Erection of LT AB Cable

Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of LT AB Cable 3x50+1x35+1x16 sq. mm

2,400 m Delivery: 60 days
#35

Erection of LT AB Cable

Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of LT AB Cable 3x120+1x95+1x16 sq. mm

956 m Delivery: 60 days
#36

Erection of 33 KV XLPE Cable

Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of 33 KV XLPE Cable 3x300 sq. mm

270 m Delivery: 60 days
#37

Erection of LT AB Cable

Laying sagging stringing, binding, jumpering & fixing of all accessories etc. of LT AB Cable 3x95+1x70+1x16 sq mm

300 m Delivery: 60 days
#38

Erection of Cable Jointing Kit O D

Laying and Fixing of Cable Jointing Kit O/D 3x300

4 no Delivery: 60 days
#39

Erection of Stone Pad

Laying and Fixing of Stone Pad

38 no Delivery: 60 days
#40

Erection of Number Plate

Laying and Fixing Number Plate

23 no Delivery: 60 days
#41

Erection of Earthing Complete

Laying and Fixing Earthing Complete

61 no Delivery: 60 days
#42

Erection of Distribution Box with Clamp

Fixing of Distribution Box with Clamp

7 no Delivery: 60 days
#43

Erection of GI Pipe

Laying and Fixing of GI Pipe

6 m Delivery: 60 days
#44

Erection of HDPE Pipe

FIXING OF HDPE PIPE 140 MM DIA PIPE FOR LAYING OF 33 KV, 3X300 SQMM XLPE CABLE WITH HDD (TRANCHLESS) MATHOD INCUDING CABLE LAYING

75 m Delivery: 60 days
#45

Carriage of Old Material

Carriage of cable & conductor old material from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking.

10 qtl Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

3 Updates
#1

Update

13-Jun-2026

Extended Deadline

18-Jun-2026, 4:00 pm

Opening Date

18-Jun-2026, 4:30 pm

#2

Update

08-Jun-2026

Extended Deadline

13-Jun-2026, 4:00 pm

Opening Date

13-Jun-2026, 4:30 pm

#3

Update

02-Jun-2026

Extended Deadline

08-Jun-2026, 4:00 pm

Opening Date

08-Jun-2026, 4:30 pm