TenderDekho Logo
Active GEM

Rail Wheel Plant Bela Solid Cushion Tyres Tender SARAN Bihar - V3 Q3 Procurement 2026

Bid Publish Date

06-Oct-2026, 4:12 pm

Bid End Date

22-Oct-2026, 9:00 am

Location

Generate Docs

Progress

Issue06-Oct-2026, 4:12 pm
Corrigendum06-Oct-2026
AwardPending

Key Highlights

  • • Solid Cushion Tyres (V3) - Q3 category for Rail Wheel Plant Bela, Bihar
  • • Mandatory e-invoice declaration and last 3 years turnover disclosure with bill
  • • IPAS upload required prior to bill processing
  • • Post-receipt inspection by consignee at Bela stores depot (CDMS/RB-11)

Tender Overview

The opportunity is issued by the Rail Wheel Plant Bela, under the Indian Railways framework for the procurement of Solid Cushion Tyres (V3) (Q3). The scope specifies supply of Goods, with inspections conducted by the consignee at Bela Stores Depot. The location is SARAN, BIHAR 841101, and the procurement is categorized under V3 Q3 solid cushion tyres. There are mandatory inbound and post-delivery checks, with a focus on accurate invoicing and turnover declarations for IPAS processing. A notable ATC clause requires mandatory e-invoice declarations and turnover disclosure for the last three years to accompany material delivery. This tender emphasizes a goods-only supply model and specifies consignee-based inspection at Rail Wheel Plant Bela.

Technical Specifications & Requirements

  • Product/Service: Solid Cushion Tyres (V3)
  • Category: Q3, Rail wheel components
  • Inspection: Post-receipt inspection at consignee site (CDMS/RB-11/St ores Depot/Bela) by Rail Wheel Plant Bela
  • ATC Clauses: Upload e-invoice declaration and provide last 3 years turnover with bill; upload via IPAS before bill processing
  • Delivery/Shipment: Goods delivered to Rail Wheel Plant Bela; delivery confirmation via BOM/invoice alignment
  • Billing/Documentation: Invoice declarations and turnover documentation mandatory for payment processing
  • BOQ: No quantity details provided; indicates a goods-only supply contract with inspection at destination
  • Additional References: GEM tender reference linked in ATC, with bill passing at DY.CMM-II/RWP/Bela

Terms, Conditions & Eligibility

  • Scope: Supply of Goods only; no installation services
  • Inspection: Post-receipt inspection by consignee at Bela stores depot
  • ATC Requirements: Mandatory e-invoice declaration; provide last 3 years turnover with material delivery; upload on IPAS
  • Delivery Point: Rail Wheel Plant Bela, Bela, Bihar
  • Billing Authority: Bill passing by DY.CMM-II/RWP/Bela
  • Pre-dispatch: Not specified as required; pre-dispatch inspection clause not invoked in ATC
  • Documentation: Ensure submission of required turnover data and e-invoice format as per ATC
  • Note: No BOQ quantities listed; bidders must rely on standard supply capabilities and documentation for acceptance

Key Specifications

  • Product/service names: Solid Cushion Tyres (V3) - Q3 category

  • Estimated value: Not specified

  • EMD: Not specified

  • Inspection: Post-receipt at Bela consignee site

  • Delivery: To Rail Wheel Plant Bela, Bela, Bihar

  • Standards/Certifications: Not specified in data; bidders to demonstrate compliance via standard railway tyre specs

Terms & Conditions

  • Goods-only supply with post-receipt inspection at Bela

  • Mandatory e-invoice declaration and three-year turnover data via IPAS

  • Delivery to Rail Wheel Plant Bela; payment processed by DY.CMM-II/RWP/Bela

Important Clauses

Payment Terms

Payment processing aligned with IPAS e-invoice declaration and turnover verification; bill passing by DY.CMM-II/RWP/Bela

Delivery Schedule

Delivery to Rail Wheel Plant Bela; no explicit quantity or delivery window provided in data

Penalties/Liquidated Damages

Not specified in available data; bidders should seek clarification during bid clarifications

Bidder Eligibility

  • Experience in supplying railway-grade tyres or equivalent industrial tyres

  • Demonstrated financial capacity with auditable turnover data

  • Ability to comply with IPAS e-invoice and document submission requirements

Advertisement

Tender Data

Bid Details

Quantity

40

Category

Solid Cushion Tyres (V3)

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Solid Cushion Tyres (V3) (Q3)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Saran

Delivery Pincodes

841221

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Amit Kumar841221,Stores Depot, Rail Wheel Plant, BelaSaranBihar8412212030-

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9991859.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Indian Railways

Office Name

Pcmm Office, Rail Wheel Plant Bela

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

06-Oct-2026

Extended Deadline

22-Oct-2026, 3:30 am

Opening Date

23-Oct-2026, 3:30 am

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply of railway tyres or equivalent

4

Financial statements showing turnover; latest audited statements

5

EMD or equivalent security deposit as per tender terms

6

Technical bid documents demonstrating capability to supply Solid Cushion Tyres (V3)

7

OEM authorization or brand approvals if required by buyer ATC

8

Invoice declarations and three-year turnover details for IPAS submission

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for Solid Cushion Tyres V3 in Bela Bihar

Bidders must submit GST, PAN, and experience certificates, plus financial statements and EMD as per ATC. Provide e-invoice declarations and last 3 years turnover with the material delivery; upload on IPAS during bill processing. Ensure delivery to Rail Wheel Plant Bela and post-receipt inspection.

What documents are required for Railway tyre tender Bela

Required documents include GST certificate, PAN, experience certificates in rail-grade supply, financial statements, EMD, technical bid, OEM authorizations if applicable, and IPAS-uploaded turnover data with the e-invoice declaration for final bill processing.

What are the inspection terms for Bela tender tyre supply

Inspection is conducted post-receipt at the consignee site (CDMS/RB-11/St ores Depot/Bela). Pre-dispatch inspection is not mandated in ATC; ensure material is ready for post-delivery verification and acceptance.

What is the delivery point for Solid Cushion Tyres Bela

Delivery is to Rail Wheel Plant Bela, Bela, Bihar 841101. Material must align with invoice and turnover declarations uploaded on IPAS for bill processing by DY.CMM-II/RWP/Bela.

How to comply with IPAS invoice and turnover requirements

Upload the e-invoice declaration and last 3 years turnover details along with the bill on IPAS before processing payments. Ensure declarations match delivery quantities and GST-compliant invoicing format.

What standards or certifications are required for this tender

No explicit standards listed in data; bidders should demonstrate capability with railway tyre specifications and provide OEM authorizations if required by ATC, along with audit-ready financials and experience proofs.

When is the payment processing expected after delivery Bela

Payments follow IPAS processing post-submission of e-invoice declaration and turnover documents; the payment timeline is tied to bill approval by the designated Bill Passing Officer, DY.CMM-II/RWP/Bela.

What is the scope of supply for this Railways tender

Scope is strictly goods supply of Solid Cushion Tyres (V3) with post-delivery inspection at Bela and no installation services. Ensure all cost components are included in bid price and documentation aligns with ATC requirements.