Kiocl Limited invites bids for the supply of HPPE IDLER components in Karnataka (Dakshina Kannada, 574109) across sizes 114 X 750, 114 X 950, and 159 X 315. The scope is strictly the supply of goods, with no BOQ items listed. The procurement emphasizes matching a detailed product data sheet with specifications, and adherence to Buyer-approved Detailed Design Drawings. A key differentiator is the mandatory pre-fabrication drawing clearance and post-approval supply alignment, potentially impacting delivery timelines. Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate, alongside the Data Sheet. ATC requirements apply. Tender indicates the need for vendor code creation upon bid submission.
HPPE IDLER variants: 114 X 750, 114 X 950, 159 X 315
Data Sheet alignment with product specifications is mandatory
7 days for Detailed Design Drawings submission; 5 days for buyer approval or modification list
Delivery timeline refixed if drawing approval is delayed, with no LD for delay
Vendor code creation requires PAN, GSTIN, cancelled cheque, EFT mandate
ATC and Corrigendum certificates to be uploaded
Data Sheet alignment with HPPE IDLER specifications is mandatory
7-day submission of Detailed Design Drawings, 5-day modification/approval cycle
Vendor code requires PAN, GSTIN, cancelled cheque, and EFT mandate
Payment terms to be clarified in ATC; no definitive terms specified in available data.
Delivery timeline tied to approval of Detailed Design Drawings; LD not applicable for buyer delays in drawing approval.
LD clauses to be defined in ATC; current data notes delivery schedule adjustments for drawing delays.
Submit all required certificates and data sheets as per ATC
Provide PAN, GSTIN, Cancelled Cheque, and EFT Mandate for vendor code
Demonstrate ability to supply goods as per HPPE IDLER specifications and alignment with Data Sheet
Quantity
160
Category
HPPE IDLER 114 X 750
Bid Type
Single Packet Bid
Bid Validity
75 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
HPPE IDLER 114 X 750 , HPPE IDLER 114 X 950 , HPPE IDLER 159 X 315
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Dakshina Kannada
Delivery Pincodes
575010
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| M Karthikeyan | 575010,KIOCL LIMITED, PELLET PLANT UNIT, PANAMBUR, MANGALORE, PIN - 575 010 | Dakshina Kannada | Karnataka | 575010 | 50 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Product Data Sheet aligned with HPPE IDLER variants
Certificates/Documents as sought in Bid Document/ATC/Corrigendum
Detailed Design Drawings (within 7 days of award) and Buyer modification list (within 5 days)
Key insights about KARNATAKA tender market
Bidders should submit PAN, GSTIN, cancelled cheque, EFT mandate, and a product Data Sheet aligned to HPPE IDLER variants. Also upload all required certificates per ATC and provide Detailed Design Drawings within 7 days of award. Ensure Data Sheet matches offered goods to avoid rejection; procurement requires goods supply only.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and a Data Sheet for HPPE IDLER variants. Upload Certificates per ATC/Corrigendum and provide Detailed Design Drawings within 7 days of award. Ensure data sheet consistency to prevent rejection.
No explicit BOQ specs are provided; bidders must rely on the Data Sheet alignment with HPPE IDLER sizes: 114 X 750, 114 X 950, 159 X 315. Ensure offered products match the Data Sheet and are compliant with buyer-specified drawings and ATC requirements.
Within 7 days of award of contract, bidders must submit Detailed Design Drawings for buyer approval. If revisions are required, the buyer will provide a modification list within 5 days; delivery schedule may be adjusted for drawing approval delays without LD.
Scope is strictly the supply of goods for HPPE IDLER variants (114 X 750, 114 X 950, 159 X 315). No BOQ items are listed; emphasis on data sheet alignment and adherence to approved drawings for delivery.
To create a vendor code, submit PAN, GSTIN, Cancelled Cheque, and an EFT Mandate certified by the bank. These are mandatory along with the Data Sheet and certificate uploads per ATC.
If buyer delays approval of drawings, the delivery period is refixed for the period of delay, and no liquidated damages (LD) are applied for that delay. Bidders should plan contingencies around the approval timeline.