Closed GEM

HSCC India Limited Data Centre SITC & Networking Equipment Tender Delhi - GHz GSM Dialler, Fire Door, RFID Access 2026

Bid Publish Date

27-Feb-2026, 1:54 pm

Bid End Date

09-Mar-2026, 2:00 pm

EMD

₹11,31,492

Value

₹5,65,74,564

Progress

Issue27-Feb-2026, 1:54 pm
Technical03-Jul-2026, 5:26 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

7253

Category

SITC of network access controller nac as per the technical specification mentioned

Bid Type

Two Packet Bid

Key Highlights

  • Commercial flexibility with 25% quantity variation allowed during and after award
  • Mandatory Integrity Pact submission and OEM authorization for non-Manufacturer bids
  • Data Sheet alignment requirement to avoid technical mismatches
  • EMD amount exactly ₹1,131,492 with DD/online proof options
  • Delivery terms depend on option clause with minimum 30 days added time
  • Multiple IT networking components including CAT6A, OS2 OFC, 19” racks, NAC, CCTV NVR, and fire door systems

Categories 51

Tender Overview

HSCC India Limited invites bids for comprehensive Data Centre infrastructure SITC and IT network installations in Central Delhi, Delhi 110002. The scope includes fire door systems with GSM dialler integration, GSM-based environmental monitoring, fiber optic cabling (OS2/LC interfaces), CAT 6A copper cabling, 19” rack deployments (wall and floor), network access controller integration, CCTV NVR deployment, water leak detection, biometric access systems, and related MEP and trenchless OFC works. Estimated contract value is ₹56,574,565 with an EMD of ₹1,131,492. The order may extend to 25% higher quantities under a flexible option clause, and data sheets plus OEM authorizations are mandatory. This tender requires complete data sheet alignment and integrity pact compliance.

The procurement focuses on end-to-end Data Centre modernization, including high-density networking, security, and environmental monitoring, to ensure data integrity and physical safety. Unique aspects include integrated fire-door release with access control, GSM diallers for environmental alarms, and SNMP/SSH-enabled network readiness configuration. The contract emphasizes compliance with vendor-provided data sheets and robust post-award performance guarantees.

Technical Specifications & Requirements

  • Key product families: Fire door systems with auto-release integration, GSM diallers for data centre alarms, GSM-based environmental monitoring, OS2 fiber optic installations, CAT 6A copper cabling for block one/two areas, 19” racks (wall/floor mount) with standard accessories, network access controller (NAC), CCTV IP-based NVR systems, water leak detection with GSM dialler, rodent repellent systems, pigtail assemblies, patch cords, faceplates, jack panels, and related conduits, trenchless OFC laying, and precision AC systems for DC
  • Cabling and containment: OFC (OS2) lengths in multiple sequences, CAT 6A cable rolls for various blocks, HDPE conduits for OFC laying in two phases, PVC flexible batten
  • Vertical integration: Access control integration with fire systems, SNMP/SSH configuration for network devices, IPv6-ready and security-compliant network readiness
  • Documentation: Data Sheet submission with bid; OEM authorization required for distributors; Integrity Pact compliance; EMD/PBG submission options listed in terms
  • Standards/Compliance: Explicit standards not specified in the provided data; bidders must reference data sheets and OEM specifications to demonstrate conformity
  • Delivery and testing: Testing of OLTS and patching, testing of pentascanning, commissioning of network equipment, and complete site installation across admin/library teaching zones and large zones
  • Warranty/Support: Not explicitly stated; bidders should infer standard manufacturer warranty and HSCC terms from data sheets and bid submission

Terms, Conditions & Eligibility

  • EMD: ₹1,131,492; submission via Demand Draft or equivalent—online proof accepted with hard copy within 5 days of bid end/opening date
  • Delivery flexibility: Option to increase quantity up to 25% at contracted rates; delivery period adjusted per clause, with minimum 30 days added when options exercised
  • Integrity Pact: Mandatory signed integrity pact uploaded with bid; additional clauses per buyer organization policy
  • Data Sheets & OEM Authorization: Upload data sheet of offered product; OEM authorization form/certificate required for distributors or service providers
  • Payment terms & security: EMD submission details; performance security via fixed deposit receipt or PBG allowed; hard copies to be delivered within the specified window
  • Documentation: GST, PAN, experience certificates, financial statements, and relevant technical bid documents expected; ensure alignment with DS and product specs
  • Contractual compliance: Data sheet match verification; mismatch could lead to bid rejection; data sheets must reflect offered parameters accurately

Key Specifications

  • Data Sheet alignment with offered products and performance parameters

  • OS2 fiber lengths and CAT6A cable rolls specified per block areas

  • 19 inch racks: wall mount and floor mount with standard accessories

  • NAC and network configuration: SSH and SNMP enabled

  • CCTV IP-based NVR system and associated HDD capacity

Terms & Conditions

  • Delivery quantity may increase by up to 25% at contracted rates

  • EMD amount is ₹1,131,492; DD or online payment acceptable

  • Integrity Pact must be signed and uploaded with bid

Important Clauses

Payment Terms

EMD submitted as DD or online proof; payment terms not fully specified in provided data; rely on standard HSCC terms with PBG optional and performance security via FDR

Delivery Schedule

Delivery period can extend with option clause; additional time formula applied with minimum 30 days; delivery starts from last date of original delivery order

Penalties/Liquidated Damages

Not explicitly detailed; bidders should review integrity pact and standard HSCC LD penalties in data sheets

Bidder Eligibility

  • Experience in similar Data Centre SITC projects

  • Financial capacity evidenced by audited statements

  • Compliance with OEM authorization and data sheet submissions

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SITC of Civil and Interior Works Fire Door Fire Paint for Data Centre as per the requirement , SITC of Fire Detection System with GSM Dialler for Data Centre , SITC of GSM Based Temperature and Humidity Online System for Data Centre , SITC of dac cable as per requirement . , SITC of smpatchchord 2 nos as per requirement , SITC of 12 sm liu fibre panel for both sides as per requirement , SITC of cat 6a cable roll for block one as per the requirement , Trenchless for ofc laying length 1st as per requirement and complete in all respect , SITC of os2 ofc in 2 lengths as per requirement and complete in all respect , SITC of network rack with smart intelligence system Smart Rack for dc , hdpe for ofc laying length 1st as per requirement and complete in all respect , Testing of olts for all connections and as per the requirement , Testing of pentascanning for all connections as per the technical specification mentioned , Trenchless for ofc laying length two as per requirement , pvc conduit flexible batten lot of 100 mtrs as per requirement , sitc of upgradation expansion of internet points for admin library teaching area and associated area small zones with all connectors IOs Faceplates patch chords jack panels , SITC of Access Standalone Biometric cum card reader with Lock and Push Button shall integrate with fire for auto door release for Data Centre , SITC of 19 inch rack 21 inches Wall Mount Rack with all standard accessories that include Cable Manager Power Bar with socket etc as per the requirement , hdpe for ofc laying length 2nd as per requirement , SITC of os2 ofc in single length as per requirement , Supply Laying Testing Commissioning of cat 6a cable roll for block two area as per the requirement , SITC of 19 inch rack 47 inches Floor Wall Mount Rack with all standard accessories that include Cable Manager Power Bar with socket sets block distribution unit , SITC of Water Leak Detection System for server room floor area with GSM Dialler for Data Centre as per the requirement , SITC of upgradation expansion of internet points for admin library teaching area and associated area medium zones with all connectors IOs Faceplates patch chords jack panels , SITC of network access controller nac as per the technical specification mentioned , Configuration of network equipment for aunthentication for the network as per requirement , SITC of Rodent Repellent System for server room for Data Centre , SITC of sm pigtail six set as per requirement , SITC of Fire Extinguisher clean agent for Data Centre , SITC of 24 sm liu fibre panel as per requirement , SITC of upgradation expansion of internet points for admin library teaching area and associated area large zones with all connectors IOs Faceplates patch chords jack panels , SITC of CCTV System IP Based NVR 4 Channel 4 MP Camera 4 Nos Cable HDD 1 TB etc , SITC of 19 inch rack 73 inches Wall Mount Rack with all standard accessories that include Cable Manager dc equipment Power Bar with sockets etc , Reconfiguration of network as per the requirement for upgradation of the Network , Supply Laying Testing Commissioning of cat 6a cable roll for block old area as per the requirement , SITC of precision ac system for dc as per the technical specification mentioned , configuration of all switches for ssh enable for network access controller readiness for the network as per requirement , configuration of all switches for snmp enable for network readiness for the network as per requirement

Authority Records

MINISTRY OF HOUSING AND URBAN AFFAIRS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8871188.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 38 Items Sign in for GEM prices

#1

SITC of Civil and Interior Works Fire Door Fire Paint for Data Centre as per the requirement

SITC of Civil and Interior Works Fire Door Fire Paint for Data Centre as per the requirement

1 nos Delivery: 150 days
#2

SITC of Fire Detection System with GSM Dialler for Data Centre

SITC of Fire Detection System with GSM Dialler for Data Centre

1 nos Delivery: 150 days
#3

SITC of GSM Based Temperature and Humidity Online System for Data Centre

SITC of GSM Based Temperature and Humidity Online System for Data Centre

1 nos Delivery: 150 days
#4

SITC of dac cable as per requirement .

SITC of dac cable as per requirement .

4 nos Delivery: 150 days
#5

SITC of smpatchchord 2 nos as per requirement

SITC of smpatchchord 2 nos as per requirement

39 nos Delivery: 150 days
#6

SITC of 12 sm liu fibre panel for both sides as per requirement

SITC of 12 sm liu fibre panel for both sides as per requirement

16 lumpsum Delivery: 150 days
#7

SITC of cat 6a cable roll for block one as per the requirement

SITC of cat 6a cable roll for block one as per the requirement

28 roll Delivery: 150 days
#8

Trenchless for ofc laying length 1st as per requirement and complete in all respect

Trenchless for ofc laying length 1st as per requirement and complete in all respect

385 mtrs Delivery: 150 days
#9

SITC of os2 ofc in 2 lengths as per requirement and complete in all respect

SITC of os2 ofc in 2 lengths as per requirement and complete in all respect

1,450 nos Delivery: 150 days
#10

SITC of network rack with smart intelligence system Smart Rack for dc

SITC of network rack with smart intelligence system Smart Rack for dc

1 nos Delivery: 150 days
#11

hdpe for ofc laying length 1st as per requirement and complete in all respect

hdpe for ofc laying length 1st as per requirement and complete in all respect

520 mtrs Delivery: 150 days
#12

Testing of olts for all connections and as per the requirement

Testing of olts for all connections and as per the requirement

1 lot Delivery: 150 days
#13

Testing of pentascanning for all connections as per the technical specification mentioned

Testing of pentascanning for all connections as per the technical specification mentioned

1 lumpsum Delivery: 150 days
#14

Trenchless for ofc laying length two as per requirement

Trenchless for ofc laying length two as per requirement

415 mtrs Delivery: 150 days
#15

pvc conduit flexible batten lot of 100 mtrs as per requirement

pvc conduit flexible batten lot of 100 mtrs as per requirement

200 bundles Delivery: 150 days
#16

sitc of upgradation expansion of internet points for admin library teaching area and associated area small zones with all connectors IOs Faceplates patch chords jack panels

sitc of upgradation expansion of internet points for admin library teaching area and associated area small zones with all connectors IOs Faceplates patch chords jack panels

9 nos Delivery: 150 days
#17

SITC of Access Standalone Biometric cum card reader with Lock and Push Button shall integrate with fire for auto door release for Data Centre

SITC of Access Standalone Biometric cum card reader with Lock and Push Button shall integrate with fire for auto door release for Data Centre

1 nos Delivery: 150 days
#18

SITC of 19 inch rack 21 inches Wall Mount Rack with all standard accessories that include Cable Manager Power Bar with socket etc as per the requirement

SITC of 19 inch rack 21 inches Wall Mount Rack with all standard accessories that include Cable Manager Power Bar with socket etc as per the requirement

32 nos Delivery: 150 days
#19

hdpe for ofc laying length 2nd as per requirement

hdpe for ofc laying length 2nd as per requirement

680 mtrs Delivery: 150 days
#20

SITC of os2 ofc in single length as per requirement

SITC of os2 ofc in single length as per requirement

3,300 nos Delivery: 150 days
#21

Supply Laying Testing Commissioning of cat 6a cable roll for block two area as per the requirement

Supply Laying Testing Commissioning of cat 6a cable roll for block two area as per the requirement

10 roll Delivery: 150 days
#22

SITC of 19 inch rack 47 inches Floor Wall Mount Rack with all standard accessories that include Cable Manager Power Bar with socket sets block distribution unit

SITC of 19 inch rack 47 inches Floor Wall Mount Rack with all standard accessories that include Cable Manager Power Bar with socket sets block distribution unit

2 nos Delivery: 150 days
#23

SITC of Water Leak Detection System for server room floor area with GSM Dialler for Data Centre as per the requirement

SITC of Water Leak Detection System for server room floor area with GSM Dialler for Data Centre as per the requirement

1 nos Delivery: 150 days
#24

SITC of upgradation expansion of internet points for admin library teaching area and associated area medium zones with all connectors IOs Faceplates patch chords jack panels

SITC of upgradation expansion of internet points for admin library teaching area and associated area medium zones with all connectors IOs Faceplates patch chords jack panels

10 nos Delivery: 150 days
#25

SITC of network access controller nac as per the technical specification mentioned

SITC of network access controller nac as per the technical specification mentioned

1 no Delivery: 150 days
#26

Configuration of network equipment for aunthentication for the network as per requirement

Configuration of network equipment for aunthentication for the network as per requirement

1 no Delivery: 150 days
#27

SITC of Rodent Repellent System for server room for Data Centre

SITC of Rodent Repellent System for server room for Data Centre

1 nos Delivery: 150 days
#28

SITC of sm pigtail six set as per requirement

SITC of sm pigtail six set as per requirement

84 nos Delivery: 150 days
#29

SITC of Fire Extinguisher clean agent for Data Centre

SITC of Fire Extinguisher clean agent for Data Centre

1 nos Delivery: 150 days
#30

SITC of 24 sm liu fibre panel as per requirement

SITC of 24 sm liu fibre panel as per requirement

12 nos Delivery: 150 days
#31

SITC of upgradation expansion of internet points for admin library teaching area and associated area large zones with all connectors IOs Faceplates patch chords jack panels

SITC of upgradation expansion of internet points for admin library teaching area and associated area large zones with all connectors IOs Faceplates patch chords jack panels

5 nos Delivery: 150 days
#32

SITC of CCTV System IP Based NVR 4 Channel 4 MP Camera 4 Nos Cable HDD 1 TB etc

SITC of CCTV System IP Based NVR 4 Channel 4 MP Camera 4 Nos Cable HDD 1 TB etc

1 nos Delivery: 150 days
#33

SITC of 19 inch rack 73 inches Wall Mount Rack with all standard accessories that include Cable Manager dc equipment Power Bar with sockets etc

SITC of 19 inch rack 73 inches Wall Mount Rack with all standard accessories that include Cable Manager dc equipment Power Bar with sockets etc

2 nos Delivery: 150 days
#34

Reconfiguration of network as per the requirement for upgradation of the Network

Reconfiguration of network as per the requirement for upgradation of the Network

1 lot Delivery: 150 days
#35

Supply Laying Testing Commissioning of cat 6a cable roll for block old area as per the requirement

Supply Laying Testing Commissioning of cat 6a cable roll for block old area as per the requirement

32 roll Delivery: 150 days
#36

SITC of precision ac system for dc as per the technical specification mentioned

SITC of precision ac system for dc as per the technical specification mentioned

2 nos Delivery: 150 days
#37

configuration of all switches for ssh enable for network access controller readiness for the network as per requirement

configuration of all switches for ssh enable for network access controller readiness for the network as per requirement

1 lot Delivery: 150 days
#38

configuration of all switches for snmp enable for network readiness for the network as per requirement

configuration of all switches for snmp enable for network readiness for the network as per requirement

1 no Delivery: 150 days

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar Data Centre SITC projects

4

Audited financial statements for last 2 fiscal years

5

EMD submission document (DD or online payment receipt)

6

Technical bid documents and Data Sheets for offered products

7

OEM authorization or authorized distributor certificate

8

Integrity Pact signed copy

Technical Results

S.No Seller Item Date Status
1
ALPHA1 IT SOLUTIONS AND CONSULTING PRIVATE LIMITED   Under PMA
-07-03-2026 17:26:17
2
HAK TURNKEY SOLUTIONS PRIVATE LIMITED   Under PMA
-07-03-2026 19:37:42
3
ITNEXA TECHNOLOGIES PRIVATE LIMITED   Under PMA
-07-03-2026 21:55:10
4
JSRIT KINFRA LLP   Under PMA
-08-03-2026 01:51:51
5
PREVALENT TECHNOLOGY PRIVATE LIMITED   Under PMA
-08-03-2026 16:10:07
6
SVAS INTERNATIONAL   Under PMA
-08-03-2026 00:12:24

Financial Results

Rank Seller Price Item
L1
JSRIT KINFRA LLP   Under PMA
Item Categories : SITC of Civil and Interior Works Fire Door Fire Paint for Data Centre as per the requirement,SITC o
L2
ALPHA1 IT SOLUTIONS AND CONSULTING PRIVATE LIMITED   Under PMA
Item Categories : SITC of Civil and Interior Works Fire Door Fire Paint for Data Centre as per the requirement,SITC o
L3
ITNEXA TECHNOLOGIES PRIVATE LIMITED   Under PMA
Item Categories : SITC of Civil and Interior Works Fire Door Fire Paint for Data Centre as per the requirement,SITC o
L4
PREVALENT TECHNOLOGY PRIVATE LIMITED   Under PMA
Item Categories : SITC of Civil and Interior Works Fire Door Fire Paint for Data Centre as per the requirement,SITC o

Frequently Asked Questions

Key insights about DELHI tender market

How to bid for this HSCC data centre tender in Delhi 2026?

Bidders should prepare EMD ₹1,131,492 with DD/online proof, submit Data Sheets for offered products, provide OEM authorizations, sign and upload Integrity Pact, and attach GST/PAN along with audited financials. Ensure alignment between data sheets and technical parameters; delivery terms may adjust with the 25% quantity option.

What documents are required for tender submission in Central Delhi?

Required documents include GST certificate, PAN, last 2 years financial statements, experience certificates for similar SITC works, EMD submission proof, OEM authorization, data sheets for offered equipment, Integrity Pact, and all technical bid documents reflecting exact specifications offered.

What are the key technical specifications for network racks and cabling?

Key specs include 19” racks (wall and floor mount) with standard accessories, CAT6A copper cabling, OS2 fiber, patch cords, faceplates, and jack panels; SNMP/SSH enabled configuration for NAC readiness; data sheets must confirm quantities and dimensions per installation zones.

What is the maximum quantity variation allowed in this tender?

The purchaser reserves the right to increase or decrease quantity up to 25% of bid quantity at contract award and during the currency of the contract at contracted rates; delivery time scales accordingly with a minimum 30 days added when exercising the option.

What are the EMD submission methods and timing?

EMD of ₹1,131,492 can be submitted via Demand Draft payable at Noida/Delhi or as fixed deposit receipt; scanned proof must be uploaded with bid and hard copies delivered within 5 days after bid end/opening date.

What OEM authorization is required for this HSCC procurement?

Authorized distributors must furnish an OEM authorization form detailing name, designation, address, email, and phone; this is mandatory for non-manufacturer bidders; ensure data sheets align to OEM specifications.

When will data sheets and integrity pact submission matter most?

Data sheets must precisely reflect offered parameters to avoid rejection; Integrity Pact must be signed and uploaded with bid; mismatches or missing pact can disqualify bids per buyer policy.

What is the role of the 25% option clause in delivery planning?

The option clause allows quantity adjustments up to 25% at contracted rates; additional delivery time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.