TenderDekho Logo
Closed GEM

Open Tender for Aluminium Thimble,LED Surface,Aluminium Thimble 150,Aluminium Thimble 400,Switch board,Aluminium Th in PANCHKULA, HARYANA

Bid Publish Date

21-Aug-2025, 3:55 pm

Bid End Date

01-Sep-2025, 4:00 pm

EMD

₹1,25,000

Progress

RA
Issue21-Aug-2025, 3:55 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

15158

Category

LED Surface

Bid Type

Two Packet Bid

Categories 137

AGITATORS BITUMINOUS MATERIAL DISTRIBUTOR PARTICLE BOARD PRINTING SERVICES CIRCULAR SAW SLUICE VALVE PASTRIES ANIMAL WATERING MACHINES BATHROOM SET HOT AIR BLOWERS WATER STORAGE TANK MISCELLANEOUS VALVE PAINTING COPPER COIL INTERIOR ANGLE GLOBE VALVES SECURITY HARDWARE MANUFACTURING MACHINERY POWER CABLE COMPRESSOR SEAMLESS PIPE AIR CYLINDERS AIR COOLED ENGINE DESERT COOLER ELECTRICAL PRODUCTS WIRING ASSEMBLY HEAVY EQUIPMENT COMPONENT MOBIL OIL LABORATORY WATER PURIFICATION EQUIPMENT OFFSET PRINTING ARC VALVE COMPRESSED BOARD GEYSER LOADER BLADE WOODEN BOARD DISTEMPER BED MILLING MACHINE WOODEN PRODUCT DISCRETE COMPONENTS XLPE CABLE PETROLEUM PRODUCT ELBOW AIRCRAFT CABLE HYDRAULIC SHOVEL WOOD SUPPLY DOOR AND DOOR ACCESSORIES MILITARY VEHICLE COOLER CAPACITOR NOZZLE SOCKET WATER PURIFIER AND RO PLANT WATER TANK WINDOW ELECTRIC ROPE SHOVEL ALUMINIUM SHEET BRACKET BLASTING MACHINE HIGH TENSION PANEL ROOT BLOWER FLOW REGULATOR WATER STORAGE AND SUPPLY COPPER PIPE WOODEN PLANK GINNING OIL SWITCH GEAR FLUID MECHANICS EQUIPMENT GALVANISED PIPE AIR CONDITIONER CEMENT DOORS RADIAL DRILLING MACHINE BUCKET WOODEN FURNITURE FALL PROTECTION LANYARD AIR BLOWER ROAD MARKING PLY WOOD SWITCH BOX BLAST NIPPLES FORESTRY PRODUCTS STEEL DOOR BLOCKPRINTING PRINTMAKING PAPER PUMP VALVES STEEL PIPE BLOWERS OR DRYERS VALVES ELECTRICAL CONDENSER GATE VALVES VERTICAL COOLER DRINKING WATER SYSTEM BOX VALVE WIRE FILTER RETAINERS NON FERROUS PIPE FUEL PUMP WORM GEAR PLYWOOD TURBINE PUMPS MISCELLANEOUS FINISHES ADHESIVE FLUORESCENT LAMP OVER HEAD TANK SLIDER VALVES HEATING EQUIPMENT SPARES MAGNETIC ANGLE COCK TRANSITION METALS BOILER MOUNTING VALVE AC MOTOR AND DC MOTOR SOLAR WATER HEATER LUBE OIL PVC TANK STARTER WATER TRANSMISSION BEARING OIL STEEL WATER TANK PLASTIC VALVE PARTS AND ACCESSORIES SOLID ROCKET MOTORS WATER COOLED ENGINE BAG BOILER VALVE HYDRAULIC PEB TEA KETTLE PAINTS ALUMINUM BUFFER DOOR FAN SEWING KIT TEE LIME POLYMERASE CHAIN REACTION PCR BEARINGS GREASE

Indian Army invites bids for Aluminium Thimble, LED Surface, Aluminium Thimble 150, Aluminium Thimble 400, Switch board, Aluminium Th in PANCHKULA, HARYANA. Quantity: 15158. Submission Deadline: 01-09-2025 16: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-8235272.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 194 Items Sign in for GEM prices

#1

Aluminium Thimble

Aluminium Thimble 300 Sqmm Pkt of 50

1 pkt Delivery: 30 days
#2

LED Surface

LED Surface ceiling light circular 12 watt

4 nos Delivery: 30 days
#3

Aluminium Thimble 150

Aluminium Thimble 150 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#4

Aluminium Thimble 400

Aluminium Thimble 400 Sqmm Pkt of 50

1 pkt Delivery: 30 days
#5

Switch board

Switch board boxes 6 Modular

15 nos Delivery: 30 days
#6

Aluminium Thimble 185

Aluminium Thimble 185 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#7

Switch board boxes

Switch board boxes 3 Modular Plastic Body

31 nos Delivery: 30 days
#8

Aluminium Thimble 120 Sqmm

Aluminium Thimble 120 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#9

Casing caping PVC 25 x 16mm

Casing caping PVC 25 x 16mm length of 2mtr

30 length Delivery: 30 days
#10

Aluminuum Thimble 95 Sqmm

Aluminuum Thimble 95 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#11

Aluminium inline connector 150 Sqmm

Aluminium inline connector 150 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#12

Aluminium Thimble 50 Sqmm

Aluminium Thimble 50 Sqmm Pkt of 50

3 pkt Delivery: 30 days
#13

Aluminuum Thimble 70 Sqmm

Aluminuum Thimble 70 Sqmm Pkt of 50

1 pkt Delivery: 30 days
#14

Casing caping

Casing caping PVC 20 x 12 mm length of 2mtr

15 length Delivery: 30 days
#15

Aluminium Thimble 35 Sqmm

Aluminium Thimble 35 Sqmm Pkt of 50

3 pkt Delivery: 30 days
#16

Aluminium Thimble 25 Sqmm

Aluminium Thimble 25 Sqmm Pkt of 50

4 pkt Delivery: 30 days
#17

Aluminium Thimble 10 Sqmm

Aluminium Thimble 10 Sqmm Pkt of 50

3 pkt Delivery: 30 days
#18

Insulation Tape

Insulation Tape 20mm X 65 Mtr Long

14 nos Delivery: 30 days
#19

Aluminium inline connector 35 Sqmm

Aluminium inline connector 35 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#20

Capacitor 4 MFD

Capacitor 4 MFD

13 nos Delivery: 30 days
#21

Aluminium inline connector 10 Sqmm

Aluminium inline connector 10 Sqmm Pkt of 50

1 pkt Delivery: 30 days
#22

Led Spot Light 12 Watt

Led Spot Light 12 Watt Warm White

25 nos Delivery: 30 days
#23

LED Fountain light

LED Fountain light coloured 20 watt for underwater

2 nos Delivery: 30 days
#24

Modular Socket 16 Amp

Modular Socket 16 Amp

50 nos Delivery: 30 days
#25

Aluminium inline

Aluminium inline connector 240 Sqmm Pkt of 50

1 pkt Delivery: 30 days
#26

MCB Disturbuisation

MCB Disturbuisation box TP 12 Way

2 nos Delivery: 30 days
#27

MCB Distribucation box 8 Way

MCB Distribucation box 8 Way

1 nos Delivery: 30 days
#28

Heat shrinkable

Heat shrinkable 70 to 95 Sqmm 3 Core

1 nos Delivery: 30 days
#29

Modular plate 3 Module

Modular plate 3 Module

10 nos Delivery: 30 days
#30

Modular plate 4 Module

Modular plate 4 Module

10 nos Delivery: 30 days
#31

Modular plate 6 Module

Modular plate 6 Module

10 nos Delivery: 30 days
#32

LED Concealed down

LED Concealed down light cool white round 5 watt

20 nos Delivery: 30 days
#33

MCB DB box 1 pole

MCB DB box 1 pole

6 nos Delivery: 30 days
#34

MCB DB box 2 pole

MCB DB box 2 pole

6 nos Delivery: 30 days
#35

MCB DB box 3 pole

MCB DB box 3 pole

5 nos Delivery: 30 days
#36

MCB DB box 4 pole

MCB DB box 4 pole

5 nos Delivery: 30 days
#37

Capacitor

Capacitor 50 6 Mfd

5 nos Delivery: 30 days
#38

Capacitor 45

Capacitor 45 4 Mfd

5 nos Delivery: 30 days
#39

Capacitor 6

Capacitor 6 Mfd

5 nos Delivery: 30 days
#40

Copper

Copper pipe 1 2 inch

12 rm Delivery: 30 days
#41

Copper pipe

Copper pipe 1 4 inch

12 rm Delivery: 30 days
#42

Copper pipe 3 8 inch

Copper pipe 3 8 inch

12 rm Delivery: 30 days
#43

Copper pipe 5 8 inch

Copper pipe 5 8 inch

12 rm Delivery: 30 days
#44

Thermostat coil window Split

Thermostat coil window Split

5 nos Delivery: 30 days
#45

PCB for window AC

PCB for window AC 1 point 5 Ton

4 nos Delivery: 30 days
#46

PCB for window AC 2 Ton

PCB for window AC 2 Ton

4 nos Delivery: 30 days
#47

PCB for split

PCB for split AC 1 point 5 Ton

4 nos Delivery: 30 days
#48

PCB for split AC 2 Ton

PCB for split AC 20 Ton

4 nos Delivery: 30 days
#49

Invertor split AC 1 point 5 Ton

PCB for Invertor split AC 1 point 5 Ton

2 nos Delivery: 30 days
#50

split AC 2 Ton

PCB for Invertor split AC 2 Ton

2 nos Delivery: 30 days
#51

Compressor

Compressor 1 point 5 ton window 240 V 50 Hz

2 nos Delivery: 30 days
#52

Compressor 2

Compressor 2 ton window 240 V 50 Hz

2 nos Delivery: 30 days
#53

Compressor 1 point 5 Ton

Compressor 1 point 5 Ton invertor type split AC 240 V 50 Hz ton window

2 nos Delivery: 30 days
#54

Compressor 2 Ton

Compressor 2 Ton invertor type split AC 240 V 50 Hz ton window

2 nos Delivery: 30 days
#55

Blower Motor

Blower Motor Synchronise for window AC 1 point 5 Ton 220 v 50 to 60 Hz

2 nos Delivery: 30 days
#56

Swing Motor

Swing Motor Synchronise for split AC 1 point 5 ton 220 V 50 to 60 Hz

2 nos Delivery: 30 days
#57

Fan Motor

Fan Motor for split AC 1 point 5 Ton

2 nos Delivery: 30 days
#58

Fan Motor for split AC 2 Ton

Fan Motor for split AC 2 Ton

3 nos Delivery: 30 days
#59

Copper thimble 10 sqmm

Copper thimble 10 sqmm

20 nos Delivery: 30 days
#60

Copper thimble 16 sqmm

Copper thimble 16 sqmm

20 nos Delivery: 30 days
#61

Copper thimble 25 sqmm

Copper thimble 25 sqmm

20 nos Delivery: 30 days
#62

Copper thimble 35 sqmm

Copper thimble 35 sqmm

20 nos Delivery: 30 days
#63

Copper thimble 50 sqmm

Copper thimble 50 sqmm

20 nos Delivery: 30 days
#64

Copper thimble 70 sqmm

Copper thimble 70 sqmm

20 nos Delivery: 30 days
#65

Copper thimble 95 sqmm

Copper thimble 95 sqmm

20 nos Delivery: 30 days
#66

Copper thimble 120 sqmm

Copper thimble 120 sqmm

20 nos Delivery: 30 days
#67

Aluminum Body Hydraulic Door Closer Universal Type

Aluminum Body Hydraulic Door Closer Universal Type

56 nos Delivery: 30 days
#68

Salt for industrial purpose

Salt for industrial purpose

10,000 kgs Delivery: 30 days
#69

Glass Sheet

Glass Sheet Frosted 1200 mm x 1200 mm x 4 mm

26 sheet Delivery: 30 days
#70

Glass Sheet Clear

Glass Sheet Clear 1200 mm x1200 mm x 4 mm

23 sheet Delivery: 30 days
#71

Aluminium Thimble

Aluminium Thimble 240 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#72

Mortice lock

Mortice lock ISI Marked for aluminium door

30 nos Delivery: 30 days
#73

Cement

Cement 43 Grade 50 Kg bag each

15 bags Delivery: 30 days
#74

Frame plate 6 Module

Frame plate 6 Module

22 nos Delivery: 30 days
#75

Plywood

Plywood Commercial BWR 8 feet x 4 feet x 6 mm

314 sq ft Delivery: 30 days
#76

GI Elbow 20 mm

GI Elbow 20 mm

45 nos Delivery: 30 days
#77

GI Union 20 mm

GI Union 20 mm

44 nos Delivery: 30 days
#78

DOL starter

DOL starter 415 volts 3 phase 15 HP

1 nos Delivery: 30 days
#79

Frame plate 8 Module

Frame plate 8 Module

16 nos Delivery: 30 days
#80

Frame plate

Frame plate with matching box 12 Modular

7 nos Delivery: 30 days
#81

GI Tee 20 mm

GI Tee 20 mm

45 nos Delivery: 30 days
#82

Aluminium inline

Aluminium inline connector 300 Sqmm Pkt of 50

1 pkt Delivery: 30 days
#83

GI Nipple

GI Nipple 20 mm x 225 mm long

15 nos Delivery: 30 days
#84

PPR Gate Valve 20 mm

PPR Gate Valve 20 mm

15 nos Delivery: 30 days
#85

GI Socket 20 mm

GI Socket 20 mm

70 nos Delivery: 30 days
#86

GI Elbow 15mm

GI Elbow 15mm

15 nos Delivery: 30 days
#87

Patchmat bitumen

Patchmat bitumen polycarbonate mixer in 25 Kgs Pack

20 kgs Delivery: 30 days
#88

GI Nipple

GI Nipple 15 mm x 150 mm long

50 nos Delivery: 30 days
#89

GI Nipple 15 mm x 225 mm

GI Nipple 15 mm x 225 mm

15 nos Delivery: 30 days
#90

CP Brass Extension

CP Brass Extension Nipple 15mm x 75 mm Long

13 nos Delivery: 30 days
#91

GI Tee 15 mm ISI mark

GI Tee 15 mm ISI mark

70 nos Delivery: 30 days
#92

GI Nipple 15 mm dia 100mm long

GI Nipple 15 mm dia 100mm long

50 nos Delivery: 30 days
#93

Hack saw Blade double edge

Hack saw Blade double edge

86 nos Delivery: 30 days
#94

GI Socket 15mm

GI Socket 15mm

80 nos Delivery: 30 days
#95

GI Socket 25mm

GI Socket 25mm

25 nos Delivery: 30 days
#96

GI Nipple

GI Nipple 20 mm x 150 mm long

50 nos Delivery: 30 days
#97

Frame plate 3 Module

Frame plate 3 Module

17 nos Delivery: 30 days
#98

PPR Gate Valve 25mm

PPR Gate Valve 25mm

10 nos Delivery: 30 days
#99

Enamel Synthetic

Enamel Synthetic Exterior paint apex color Smoke Grey

9 ltrs Delivery: 30 days
#100

GI Elbow 25mm

GI Elbow 25mm

20 nos Delivery: 30 days
#101

Hex Nipple 20 mm x 50 mm

Hex Nipple 20 mm x 50 mm

50 nos Delivery: 30 days
#102

Frame plate 4 Module

Frame plate 4 Module

17 nos Delivery: 30 days
#103

paint color White

Enamel Synthetic Exterior undercoating high glows paint color White

40 ltrs Delivery: 30 days
#104

GI Nipple 25mm x 150mm

GI Nipple 25mm x 150mm

15 nos Delivery: 30 days
#105

Plywood Commercial

Plywood Commercial BWR 8 feet x 4 feet x 8 mm

388 sqft Delivery: 30 days
#106

Aluminium inline

Aluminium inline connector 95 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#107

HT Tape

HT Tape black roll of 20 mtr

20 pkt Delivery: 30 days
#108

Brass Spindle

Brass Spindle 15mm for CP Bib Tap

16 nos Delivery: 30 days
#109

Aluminium inline

Aluminium inline connector 120 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#110

Pre laminated particle

Pre laminated particle board 8 feet x 4 feet x 18 mm

320 sqft Delivery: 30 days
#111

GI Tank Nipple 20 mm

GI Tank Nipple 20 mm

18 nos Delivery: 30 days
#112

Brass Nozzle

Brass Nozzle 20 mm for fountain

20 nos Delivery: 30 days
#113

Road Marking Paint White

Road Marking Paint White

5 ltrs Delivery: 30 days
#114

OBD 20 lts bucket

OBD 20 lts bucket

80 ltrs Delivery: 30 days
#115

MS But Hinge 100 mm

MS But Hinge 100 mm

30 nos Delivery: 30 days
#116

Ball valve brass of Size 25 mm

Ball valve brass of Size 25 mm

1 nos Delivery: 30 days
#117

GI Nipple

GI Nipple 20 mm dia100mm long

32 nos Delivery: 30 days
#118

GI Elbow

GI Elbow reducer 20 x 15 mm

15 nos Delivery: 30 days
#119

Ball valve

Ball valve brass of size 20mm

23 nos Delivery: 30 days
#120

PVC Gang

PVC Gang box 16 Amp 2 Way

8 nos Delivery: 30 days
#121

GI Union 25 mm

GI Union 25 mm

15 nos Delivery: 30 days
#122

Ball valve

Ball valve brass of size 15mm

18 nos Delivery: 30 days
#123

GI Tee reducer

GI Tee reducer 20 x 15 x 15 mm dia

9 nos Delivery: 30 days
#124

White cement

White cement in 1 Kg Pack

100 nos Delivery: 30 days
#125

Hasp

Hasp and staple 150 mm

6 nos Delivery: 30 days
#126

Hex Nipple

Hex Nipple 15 mm x 50 mm

58 nos Delivery: 30 days
#127

Bearing grease

Bearing grease in 1 kg pack

2 kg Delivery: 30 days
#128

GI Tank Nipple 15 mm

GI Tank Nipple 15 mm

19 nos Delivery: 30 days
#129

GI Elbow 40mm

GI Elbow 40mm

5 nos Delivery: 30 days
#130

GI Union 40mm

GI Union 40mm

5 nos Delivery: 30 days
#131

Magnetic door catcher

Magnetic door catcher

12 nos Delivery: 30 days
#132

GI Socket 40mm

GI Socket 40mm

5 nos Delivery: 30 days
#133

GI Plug 20mm

GI Plug 20mm

13 nos Delivery: 30 days
#134

Door Handle Aluminium 200mm

Door Handle Aluminium 200mm

8 nos Delivery: 30 days
#135

Helical Door

Helical Door Spring ISI Marked

5 nos Delivery: 30 days
#136

GI Socket 50mm

GI Socket 50mm

5 nos Delivery: 30 days
#137

GI Tee 25mm

GI Tee 25mm

5 nos Delivery: 30 days
#138

PPR Tee 32mm

PPR Tee 32mm

5 nos Delivery: 30 days
#139

Aluminium inline

Aluminium inline connector 25 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#140

connector 50 Sqmm

Aluminium inline connector 50 Sqmm Pkt of 50

2 pkt Delivery: 30 days
#141

PPR Union 20mm

PPR Union 20mm

6 nos Delivery: 30 days
#142

GI Socket

GI Socket reducing 20x15mm

18 nos Delivery: 30 days
#143

Gypson Screw

Gypson Screw 2 inch Pkt of 100 nos

5 pkt Delivery: 30 days
#144

CP Brass

CP Brass Urinal Spreader 15mm

10 nos Delivery: 30 days
#145

PVC Wall gitti

PVC Wall gitti plastic Pkt of 100 Nos

4 pkt Delivery: 30 days
#146

GI Nipple 25mm x 75mm

GI Nipple 25mm x 75mm

5 nos Delivery: 30 days
#147

GI Tee reducer

GI Tee reducer 25 mm x 25 mm x 20 mm

5 nos Delivery: 30 days
#148

GI Tee reducer

GI Tee reducer 25 mm x 25 mm x 15 mm

5 nos Delivery: 30 days
#149

GI Nipple

GI Nipple 50 x100mm

2 nos Delivery: 30 days
#150

GI Socket 32mm

GI Socket 32mm

3 nos Delivery: 30 days
#151

CP Wall Bracket

CP Wall Bracket L Shape for curtain rod 25mm

50 nos Delivery: 30 days
#152

Insulated tape

Insulated tape pvc self adhesive 20 mm x 8 Mtr long

20 roll Delivery: 30 days
#153

GI Tee 40mm

GI Tee 40mm

2 nos Delivery: 30 days
#154

CP Bottle

CP Bottle trap 32 mm Brass for Wash Basin

2 nos Delivery: 30 days
#155

GI Plug 15mm

GI Plug 15mm

28 nos Delivery: 30 days
#156

Gypson Screw

Gypson Screw 40 mm Pkt of 100 Nos

10 pkt Delivery: 30 days
#157

CP End Bracket

CP End Bracket for Steel Pipe 25mm

50 nos Delivery: 30 days
#158

GI Elbow Reducer

GI Elbow Reducer 25 mm x 20mm

5 nos Delivery: 30 days
#159

PPR Socket 25mm

PPR Socket 25mm

10 nos Delivery: 30 days
#160

Blanking plate

Blanking plate

12 nos Delivery: 30 days
#161

GI Bend 20mm

GI Bend 20mm

2 nos Delivery: 30 days
#162

M Seal

M Seal in 90 Gms Pkt

30 pkt Delivery: 30 days
#163

Dr fixit

Dr fixit for water proofing 1 Kg each

10 each Delivery: 30 days
#164

Lime

Lime

8 kg Delivery: 30 days
#165

PPR Reducer Socket

PPR Reducer Socket 32mm x 25mm

5 nos Delivery: 30 days
#166

PPR Elbow 25mm

PPR Elbow 25mm

10 nos Delivery: 30 days
#167

Gypson Screw 25 mm

Gypson Screw 25 mm pkt of 100 nos

2 pkt Delivery: 30 days
#168

Floor door closer

Floor door closer

8 nos Delivery: 30 days
#169

Plywood

Plywood one side teak face 8 feet x 4 feet x 4 mm

194 sqft Delivery: 30 days
#170

Aluminim Hasp and Staple

Aluminim Hasp and Staple of Size100mm

30 nos Delivery: 30 days
#171

GI Reducing elbow

GI Reducing elbow 25 x 20mm

5 nos Delivery: 30 days
#172

GI Elbow Reducing

GI Elbow Reducing 25x15mm

10 nos Delivery: 30 days
#173

GI Reducing Tee

GI Reducing Tee 20mm x 20mm x 15mm

12 nos Delivery: 30 days
#174

PPR Socket 20mm

PPR Socket 20mm

10 nos Delivery: 30 days
#175

PPR Tee 20mm

PPR Tee 20mm

6 nos Delivery: 30 days
#176

PPR Elbow 20mm

PPR Elbow 20mm

9 nos Delivery: 30 days
#177

Plastic gitti

Plastic gitti

500 nos Delivery: 30 days
#178

Wire clamp 10 mm

Wire clamp 10 mm

200 nos Delivery: 30 days
#179

Batten nail

Batten nail

200 nos Delivery: 30 days
#180

PVC Condute pipe 20 mm

PVC Condute pipe 20 mm

20 rm Delivery: 30 days
#181

PVC Condute clamp

PVC Condute clamp for pipe 20 mm

50 nos Delivery: 30 days
#182

Fin strips heating

Fin strips heating element 3 KW

5 nos Delivery: 30 days
#183

Fan Belt

Fan Belt V shape 44A

8 nos Delivery: 30 days
#184

Fan Belt V

Fan Belt V shape 39B

8 nos Delivery: 30 days
#185

Fan Belt V

Fan Belt V shape 60A

8 nos Delivery: 30 days
#186

Fan Belt V

Fan Belt V shape 54A

8 nos Delivery: 30 days
#187

Dulex

Dulex promise exterior acrylic eumlsion 4 ltr for exterior wall paint

8 nos Delivery: 30 days
#188

SS Curtain rod

SS Curtain rod supporter 25 mm rod holder set for doors

50 nos Delivery: 30 days
#189

Manhole

Manhole cover 450 mm x 450 mm

20 nos Delivery: 30 days
#190

paints

paints interior painting silk roller with twin lock Roller length 9 inch thickness of fur 2 mm

10 pieces Delivery: 30 days
#191

Paints rucare wall putty

Paints rucare wall putty water proof Interior 40 Kg

5 bag Delivery: 30 days
#192

Paints rucare wall

Paints rucare wall putty water proof Exterior 40 Kg

2 bag Delivery: 30 days
#193

Tank PVC

Water storage Tank PVC 1000 Ltr double layer

5 nos Delivery: 30 days
#194

Aluminium sheet

Aluminium sheet 1 mm thick size 8 feet x 4 feet

100 kg Delivery: 30 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

02-Sep-2025, 5:00 pm

End

03-Sep-2025, 5:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
J M J TRADING   Under PMA
-31-08-2025 21:24:48
2
MIDSCOPE SUPPLIERS   Under PMA
-31-08-2025 15:44:07
3
OCEAN MARKETING   Under PMA
-01-09-2025 14:50:29

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1OCEAN MARKETING(MII)   Under PMA Winner ₹25,03,984Item Categories : Aluminium Thimble,LED Surface,Aluminium Thimble 150,Aluminium Thimble 400,Switch board,Aluminium Th
L2MIDSCOPE SUPPLIERS (MII)   Under PMA₹25,59,717Item Categories : Aluminium Thimble,LED Surface,Aluminium Thimble 150,Aluminium Thimble 400,Switch board,Aluminium Th
L3J M J TRADING (MII)   Under PMA₹25,98,513Item Categories : Aluminium Thimble,LED Surface,Aluminium Thimble 150,Aluminium Thimble 400,Switch board,Aluminium Th

🎉 L1 Winner

OCEAN MARKETING(MII)   Under PMA

Final Price: ₹25,03,984