TenderDekho Logo
Closed GEM

HPCL Tank Wagon Unloading Hoses Tender Bangalore Karnataka 2026 EMD ₹35695 2% SD 5% Retention 15 Days

Bid Publish Date

29-Jan-2026, 10:34 pm

Bid End Date

19-Feb-2026, 2:00 pm

EMD

₹35,695

Progress

Issue29-Jan-2026, 10:34 pm
Technical19-02-2026 10:46:56
Financial
Award14-Apr-2026, 5:09 am
Explore all 4 tabs to view complete tender details

Quantity

100

Bid Type

Two Packet Bid

Key Highlights

  • Vendor bears freight and door delivery responsibility
  • Delivery window fixed at 15 days from indent date
  • Quantity can be increased by up to 25% during contract at contracted rates
  • Security deposit set at 2% of contract value; retention 5%; CPBG 5% accepted
  • EMD ₹35,695 via RTGS/online transfer with payment proof
  • Penalties: 0.5% per week delay, up to 5% of total basic value

Categories 6

Tender Overview

Hindustan Petroleum Corporation Ltd invites bids for the supply of Tank Wagon Unloading Hoses for Petroleum products in BANGALORE, KARNATAKA. The contract contemplates door-delivery within 15 days of indent, with vendor-bearing freight. The engagement lasts 1 year from PO/LOI, with a 2% security deposit and 5% retention; CPBG of 5% may be accepted. The bid includes an option to increase quantity by up to 25% during and after execution, at contracted rates, with delivery timing adjustments based on the formula provided. EMD is ₹35,695. This procurement emphasizes timely delivery and compliance with HPCL terms.

Technical Specifications & Requirements

  • Product category: Tank Wagon Unloading Hoses (Petroleum Products)
  • Delivery: Door delivery within 15 days from indent date; freight borne by vendor
  • Contract validity: 1 year from PO/LOI date
  • Payment terms: vendor responsibilities not explicitly detailed; delivery is time-critical
  • EMD: ₹35,695 via online RTGS/IMPS to HPCL; payment proof to be uploaded
  • Security and performance: 2% Security Deposit; 5% retention; CPBG 5% accepted as alternative
  • Quantity option: up to 25% increase during/after contract at contracted rates; delivery window extension rules defined
  • Penalties: late-delivery penalties at 0.5% of basic value per week with cap at 5% of total basic value
  • Additional terms: time for completion starts from LOI/PO date; HPCL may require adjustments for delays

Terms, Conditions & Eligibility

  • EMD submission: ₹35,695 via RTGS/online transfer to the specified HPCL account; include bid number in transaction details
  • Security deposit: 2% of total contract value; retention: 5%; CPBG option: 5% as alternative
  • Delivery: 15 days from indent; door delivery; freight by vendor
  • Contract term: 1 year; payment terms aligned to delivery and acceptance
  • Penalties: delayed delivery penalties apply; maximum deduction 5% of total basic value
  • Documentation: bid submission must include payment proof, vendor details, and compliance with ATC clauses

Key Specifications

  • Product/service: Tank Wagon Unloading Hoses for petroleum products

  • Estimated value: not disclosed; EMD ₹35,695

  • Delivery: door delivery within 15 days; freight borne by vendor

  • Contract term: 1 year from PO/LOI

  • Quality/standards: not specified; HPCL ATC governs submission and penalties

Terms & Conditions

  • EMD ₹35,695 via RTGS/online; proof to be uploaded

  • Delivery within 15 days; freight by vendor

  • 2% security deposit; 5% retention; CPBG 5% alternative

  • Quantity can increase up to 25% at contracted rates

  • Penalty for delays: 0.5% per week, max 5%

Important Clauses

Payment Terms

Vendor to follow HPCL terms; EMD via RTGS/online; retention 5%; CPBG 5% option

Delivery Schedule

Door delivery within 15 days from indent; delays trigger LD as per clause

Penalties/Liquidated Damages

LD at 0.5% of basic value per week, max 5% of total basic value

Bidder Eligibility

  • Eligible bidders with experience in supplying petroleum unloading equipment

  • Valid GST registration and PAN; financial stability evidence

  • Ability to arrange door delivery and freight mechanics

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of Tank Wagon Unloading Hoses (Petroleum Products)

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8900609.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar hose supply

4

Financial statements / turnover proof

5

EMD payment proof (RTGS/online transfer) with bid reference

6

Technical bid documents and OEM authorizations (if required)

7

Any applicable quality/certification documents

Technical Results

S.No Seller Item Date Status
1
GAYTRI INDUSTRIAL CORPORATION PRIVATE LIMITED   Under PMA
Make : GAYTRI Model : Gaytri Industrial Ciorporation private limited Title : Supply of Tank Wagon Unloading Hoses (Petroleum Products)19-02-2026 10:46:56
2
LOGAN FLEX INDUSTRIAL CORPORATION   Under PMA
Make : COMPOHOSE Model : LOGANFLEX Title : Supply of Tank Wagon Unloading Hoses (Petroleum Products)17-02-2026 17:59:48
3
SHARDA INDUSTRIAL CORPORATION   Under PMA
Make : COMPOHOSE Model : EN 13765 : 2018 Title : Supply of Tank Wagon Unloading Hoses (Petroleum Products)16-02-2026 15:24:44
4
TECHFLOW SYSTEMS   Under PMA
Make : techflo Model : TECHFLOW/CH/03 Title : Supply of Tank Wagon Unloading Hoses (Petroleum Products)19-02-2026 13:18:45
5
TRANSFLEX INDUSTRIES   Under PMA
Make : TF TRANSFLEX Model : 3 INCH X 6 MTRS Title : Supply of Tank Wagon Unloading Hoses (Petroleum Products)18-02-2026 11:09:50

Financial Results

Rank Seller Price Item
L1
LOGAN FLEX INDUSTRIAL CORPORATION(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply of Tank Wagon Unloading Hoses (Petroleum Products)
L2
SHARDA INDUSTRIAL CORPORATION (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply of Tank Wagon Unloading Hoses (Petroleum Products)
L3
TRANSFLEX INDUSTRIES (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply of Tank Wagon Unloading Hoses (Petroleum Products)
L4
TECHFLOW SYSTEMS (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply of Tank Wagon Unloading Hoses (Petroleum Products)
L5
GAYTRI INDUSTRIAL CORPORATION PRIVATE LIMITED (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply of Tank Wagon Unloading Hoses (Petroleum Products)

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about KARNATAKA tender market

How to bid for HPCL tank wagon hoses tender in Bangalore 2026

Bidders must submit EMD ₹35,695 via RTGS/online, proof of payment, GST, PAN, experience certificates, and financial statements. Upload technical bid and OEM authorizations if required, with delivery capability for 15 days door delivery and freight borne by vendor.

What documents are required for HPCL hoses tender in Karnataka

Required documents include GST certificate, PAN card, experience certificates for similar supply, financial statements, EMD payment proof, technical bid documents, and OEM authorizations if specified. Ensure bid references are clearly listed in RTGS transfer details.

What are the delivery terms for HPCL hose procurement in Bangalore

Delivery is door-to-door within 15 days from indent date; freight charges borne by the vendor; timing counts from LOI/PO date; delays incur LD penalties up to 5% of basic value.

What is the EMD amount and payment method for this HPCL tender

EMD is ₹35,695 payable via RTGS/online to the HPCL account provided; include bid number and entity name in the transfer; upload scanned proof along with bid submission.

What are the penalty terms for delayed HPCL delivery in Karnataka

Late delivery incurs a penalty of 0.5% of the basic value per week of delay, pro-rated for fractional days, with a maximum deduction of 5% of total basic value.

What is the contract duration for HPCL hose supply in Bangalore

The contract validity is 1 year from the date of Purchase Order or Letter of Intent; performance bonds (CPBG) of 5% may be accepted as an alternative to security deposit.

Can HPCL increase order quantity and how is delivery adjusted

Yes, quantity may increase by up to 25% during placement and in-currency at contracted rates; additional time is calculated as (Increase/Original) × Original delivery period, with a minimum of 30 days.

Are there specific standards or certifications required for HPCL hoses

No explicit standards are listed in the tender; HPCL ATC terms apply; bidders should ensure compliance with any implicit safety and quality expectations and provide OEM authorizations if required.