TenderDekho Logo
Open EPROCURE-BIHAR

Bids are Invited For Design, manufacture, testing, supply and delivery of 01 (one) set of Emergency Restoration System (ERS) (10 Tension type + 06 Suspension type) suitable for 220KV transmission lines as well as 132kV transmission line in BIHAR

Bid Publish Date

03-Feb-2022, 4:35 pm

Bid End Date

04-May-2022, 4:00 pm

EMD

₹37,02,067

Value

₹18,51,03,330

Location

Progress

Issue03-Feb-2022, 4:35 pm
AwardPending
Explore all 3 tabs to view complete tender details

Tender Type

Open

Tender Fee

₹11,800

Tender Fee Exemption

No

EMD Exemption

Yes

Category

ELECTRICAL

Categories 7

The issuing authority invites bids for Design, manufacture, testing, supply and delivery of 01 (one) set of Emergency Restoration System (ERS) (10 Tension type + 06 Suspension type) suitable for 220KV transmission lines as well as 132kV transmission lines in BIHAR. Submission Deadline: 04-05-2022 16: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Processing Fee

₹5,900

Tender Currency

INR

Bid Currency

INR

Ranking Sequence

L1 Ranking

Estimated Value Visibility

Y

Bid To RA

No

Authority & Contact

Organization Hierarchy

Government of Bihar->Bihar State Power Transmission Company Limited->BSPTCL->Headquarter->Operation Maintenance

Approving Authority

AMAR KUMAR MISHRA (ESE)

Tender Creator

Ms Madhu Priya (EXECUTIVE ENGINEER)

Pre-Bid & Qualification

Pre-Bid Meeting Start

09-02-2022 11:00:00

Pre-Bid Meeting End

09-02-2022 14:00:00

Pre-Bid Discussion Type

ONLINE

Pre-Bid Venue

4TH Floor, Vidyut Bhawan, Bailey Road, Patna

Payment Breakdown

TypeAmountCurrencyModeExemption
EMD₹37,02,067INRInternet Payment Gateway(IPG),Challan|Bank GuaranteeYes
Tender Fee₹11,800INRInternet Payment Gateway(IPG),Challan|No
Tender Processing Fee₹5,900INRInternet Payment Gateway(IPG),Challan|No

Document Requirements

GST CERTIFICATE

BidPart1FinancialMandatoryNo Exemption

Annual Turn Over Certificate for last 5 years (2020-21,2019-20,2018-19,2017-18,2016-17)

BidPart1FinancialMandatoryNo Exemption

ITR for last 5 years

BidPart1FinancialMandatoryNo Exemption

Purchase order, Work order and related Performance Certificate as per Tender clause no-1.06

BidPart1ExperiencesMandatoryNo Exemption

Type Test reports as per Tender clause1.06

BidPart1ExperiencesMandatoryNo Exemption

Audited balance sheet for last 5 years

BidPart1FinancialMandatoryNo Exemption

PAN Card/Aadhar card of Company owner

BidPart1OthersMandatoryNo Exemption

Certificate from statutory Auditor/CA giving the % of Local Content as per clause 1.08.1

BidPart1OthersMandatoryNo Exemption

Any other documents not mentioned herewith but required for qualification may be submitted

BidPart1OthersMandatoryNo Exemption

Affidavit regarding local content as per Tender clause 1.08.1

BidPart1OthersMandatoryNo Exemption

Exemption certificate for EMD if applicable (small scale industries/DGS &D etc)

BidPart1FinancialMandatoryExemption Allowed

Affidavit by the Manufacturer regarding compliances as per Tender clause

BidPart1ExperiencesMandatoryNo Exemption

General Particulars

1

Name & address of supplier of ERS

2

Name & address of manufacturers of ERS structures & components

3

Name & address of manufacturers of Composite insulators

4

Name & address of manufacturer of hardware assembly

5

Table of compliance as per clause no 2 of section -1 of technical specification furnished

6

Detailed drawings and documents as per relevant clause of section -ll of Technical specification furnished

7

Detailed engineering data of all equipment/tool furnished

8

Standard to which ERS generally conforms to

9

Materials of ERS structure

10

Maximum length of structure column section (in mtrs)

11

Maximum weight of structure column section (in kgs)

12

Maximum weight of any individual ERS component

13

Description of training program module proposed by Bidder furnished

14

Limits loads in kg/kg-m which can be withstood by a) Column sections/structures in

15

Compression

16

Bending

17

Torsion

18

Combined bending and compression

19

Buckling

20

Ultimate strength bending Bolts

21

Ultimate strength bending welds

22

Box Section

23

Guy Plates

24

Bolts & Nut

25

Gimbal

26

Suitable provision for installation of earthwire provided on ERS structures

27

Material of Polymer Insulators offered

28

Minimum Corona Extinction voltage of horizontal V and double tension insulator string (kV rms)

29

Maximum RIV of above insulators string at 1 MHz when subjected to 305 kV rms line to ground voltage under this condition (?V)

Tender Terms

Section 1

Details

Security deposit as per clause 1.12 of this specification has to be deposited and this deposit has to be kept with the Company for the entire guarantee period.

Security deposit as per clause 1.12 of this specification has to be deposited and this deposit has to be kept with the Company for the entire guarantee period.

Section 2

Details

Whether delivery schedule indicated in the specification is acceptable

Whether delivery schedule indicated in the specification is acceptable

Section 3

Details

Whether penalty for delay in delivery as indicated in the specification is acceptable

Whether penalty for delay in delivery as indicated in the specification is acceptable

Section 4

Details

Whether terms of payment indicated in the specification is acceptable

Whether terms of payment indicated in the specification is acceptable

Section 5

Details

Whether guarantee clause indicated in the specification in acceptable

Whether guarantee clause indicated in the specification in acceptable

Section 6

Details

Whether 5% bank guarantee as stipulated under performance guarantee clause will be submitted

Whether 5% bank guarantee as stipulated under performance guarantee clause will be submitted

Section 7

Details

Whether Board's terms of insurance as per specification is acceptable

Whether Board's terms of insurance as per specification is acceptable

Section 8

Details

Whether agreeable to enter into a contract in event of order

Whether agreeable to enter into a contract in event of order

Section 9

Details

Are prices quoted in the price bid FIRM. Only FIRM price shall be quoted.

Are prices quoted in the price bid FIRM. Only FIRM price shall be quoted.

Section 10

Details

Whether unit F.O.R. destination prices have been quoted in the price bid

Whether unit F.O.R. destination prices have been quoted in the price bid

Section 11

Details

Whether prices quoted are also applicable on reduced quantity or not? Rebate on account of quantity increase, if any, applicable may be mentioned.

Whether prices quoted are also applicable on reduced quantity or not? Rebate on account of quantity increase, if any, applicable may be mentioned.

Section 12

Details

Whether all general terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same

Whether all general terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same

Section 13

Details

Whether all technical terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same

Whether all technical terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same

Section 14

Details

Whether the bidder is agreeable to manufacture & supply the equipment in case deviations stipulated by him is not acceptable to Company.

Whether the bidder is agreeable to manufacture & supply the equipment in case deviations stipulated by him is not acceptable to Company.

Section 15

Details

Whether certificates of past performance and copies of related Purchase orders/Work orders along with Type Test Reports as per Eligibility criteria submitted...

Whether certificates of past performance and copies of related Purchase orders/Work orders along with Type Test Reports as per Eligibility criteria submitted or not.

Section 16

Details

Offer must be made complete in all respects as per Technical specification.

Offer must be made complete in all respects as per Technical specification.

Section 17

Details

Though in the Specification for some equipments, particular make and type have not been mentioned, Equipments of make and types which are being used satisfac...

Though in the Specification for some equipments, particular make and type have not been mentioned, Equipments of make and types which are being used satisfactorily in BSPTCL, will be preferred. However, in case of equipments of makes, not supplied earlier to BSPTCL the credentials and updated performance reports regarding supplies made to other central and state Power utilities should be furnished. BSPTCL reserves the right to opt for the make and type.

Section 18

Details

Only type tested equipments and materials shall be supplied by the contractor

Only type tested equipments and materials shall be supplied by the contractor

Section 19

Details

Tenderer shall note and confirm that their scope of work shall fully comply with the requirement as detailed in BSPTCL's Specn.

Tenderer shall note and confirm that their scope of work shall fully comply with the requirement as detailed in BSPTCL's Specn.

Section 20

Details

The Insurance covering Transit Risk, Transportation Risk, handling (during loading and unloading), risk during storage, erection, commissioning, theft and fi...

The Insurance covering Transit Risk, Transportation Risk, handling (during loading and unloading), risk during storage, erection, commissioning, theft and fire shall be done and borne by the Tenderer for all the equipment/items devices pertaining to the transmission line under turnkey package till the installation is handed over to BSPTCL authorities.

Section 21

Details

Tenderer to note and confirm that the freight charges including handling charges during loading and unloading shall be borne by the bidder. All the materials...

Tenderer to note and confirm that the freight charges including handling charges during loading and unloading shall be borne by the bidder. All the materials sent by the Tenderer to site by road transportation shall be suitably packed. No separate freight charges shall be paid by BSPTCL.

Section 22

Details

Tenderer to note and confirm that storing of all materials under this contract shall be within the Tenderer's scope of work and adequate security arrangement...

Tenderer to note and confirm that storing of all materials under this contract shall be within the Tenderer's scope of work and adequate security arrangement for the stores as well as in the areas of erection till the date of handling over, shall be tenderer's responsibility, Tenderer to arrange their own suitable storage at their cost for materials. Bidder also to construct temporary store as well as Site office at Bidders cost.

Section 23

Details

Tenderer to note and confirm that the BSPTCL and his duly authorised representative shall have an access to the contractor's premises, manufacturer's work fo...

Tenderer to note and confirm that the BSPTCL and his duly authorised representative shall have an access to the contractor's premises, manufacturer's work for all tests of the equipment, cable etc. as listed in the schedule of tender. Inspection and testing shall be carried out as per tender specification.

Section 24

Details

All plants/equipment and materials to be supplied for the project shall be guaranteed as per BSPTCL's specifications.

All plants/equipment and materials to be supplied for the project shall be guaranteed as per BSPTCL's specifications.

Section 25

Details

Tenderer to note and confirm that all the supplies shall conform to relevant ISS, IEC, I.E. RULES and BSPTCL's specifications. No material will be accepted u...

Tenderer to note and confirm that all the supplies shall conform to relevant ISS, IEC, I.E. RULES and BSPTCL's specifications. No material will be accepted unless covered by relevant ISS, IEC on any other relevant approved specification as required.

Section 26

Details

Tenderer to note and confirm that the installation shall be complete in all respects for efficient and trouble free service For this purpose any part or part...

Tenderer to note and confirm that the installation shall be complete in all respects for efficient and trouble free service For this purpose any part or parts required whether specifically mentioned or not shall be deemed to be within tenderer's Scope, Any additional quantity which may be required over and above the quantiy as per approved bill of materials based on BSPTCL's approved drawing to meet the site layout requirements and to achieve the best performance level as specified to BSPTCL shall be supplied and installed at no extra cost of BSPTCL. During installation of equipments at site any minor modification of civil work like chipping, grouting, make chase or holes on the walls, floors etc. including materials such as sand, steel, cement as may be required at no extra cost to BSPTCL.

Section 27

Details

Tenderer to note that erection tools and tackles as may be required to complete installation work shall be arranged by you at no extra cost to BSPTCL. All pr...

Tenderer to note that erection tools and tackles as may be required to complete installation work shall be arranged by you at no extra cost to BSPTCL. All precommissioning checks and commissioning tools and instruments shall have to be arranged by the bidder at no extra cost to BSPTCL.

Section 28

Details

Tenderer to note and confirm that without the written consent of BSPTCL they will not assign or sublet the total contract or any part thereof other than for ...

Tenderer to note and confirm that without the written consent of BSPTCL they will not assign or sublet the total contract or any part thereof other than for any part of the work for which the maker are named in the contract. Such contract if given shall not relieve him from any obligation, duty or responsibility as per the terms and conditions of the specification and the contract.

Section 29

Details

Tenderer to note and confirm that relevant data those may be required for the above work and the survey work will be undertaken immediately on receipt of let...

Tenderer to note and confirm that relevant data those may be required for the above work and the survey work will be undertaken immediately on receipt of letter of intent. Tenderer also to note that all supply of consumable materials including cement and steel shall be arranged by the contractor. No separate charges for design and preparation of detailed drawing will be entertained by BSPTCL.

Section 30

Details

Tenderer also to note that supply of all consumable materials including cement and steel shall be arranged by the contractor. No separate charges for design ...

Tenderer also to note that supply of all consumable materials including cement and steel shall be arranged by the contractor. No separate charges for design and preparation of detailed drawing will be entertained by BSPTCL

Section 31

Details

Tenderer to confirm that they will furnish Bank Guarantee towards security deposit/contract performance, guarantee before execution of the contract Agreement.

Tenderer to confirm that they will furnish Bank Guarantee towards security deposit/contract performance, guarantee before execution of the contract Agreement.

Section 32

Details

Tenderer to confirm that they will furnish Bank Guarantee for advance payment

Tenderer to confirm that they will furnish Bank Guarantee for advance payment

Section 33

Details

Tenderer to confirm that they will furnish Pert CPM/Barchart/Execution schedule for completion of the project before execution of the agreement

Tenderer to confirm that they will furnish Pert CPM/Barchart/Execution schedule for completion of the project before execution of the agreement

Section 34

Details

Tenderer to confirm that they will furnish Indemnity Bond for the equipments delivered and handed over to the contractor.

Tenderer to confirm that they will furnish Indemnity Bond for the equipments delivered and handed over to the contractor.

Section 35

Details

Tenderer to confirm that they will furnish Bank Guarantee against performance guarantee.

Tenderer to confirm that they will furnish Bank Guarantee against performance guarantee.

Section 36

Details

Tenderer to confirm that they will furnish Power of Attorney by all the partners in case of Joint Venture for authorising the lead partner

Tenderer to confirm that they will furnish Power of Attorney by all the partners in case of Joint Venture for authorising the lead partner

Section 37

Details

Tenderer to confirm that they will furnish Copy of Agreement executed by the members of Joint Ventures.

Tenderer to confirm that they will furnish Copy of Agreement executed by the members of Joint Ventures.

Section 38

Details

Sales tax on Works contract, Turnover Tax on any other similar taxes under the Sales Tax, Act, as applicable, are included in the Bid/tendered price and BSPT...

Sales tax on Works contract, Turnover Tax on any other similar taxes under the Sales Tax, Act, as applicable, are included in the Bid/tendered price and BSPTCL/Purchaser shall not bear any expenditure/liability on this account. Entry tax, if any shall be extra.

Section 39

Details

The tenderer prices quoted in price schedule included all import duties and levies including licence fees lawfully payable by the contractor on imported good...

The tenderer prices quoted in price schedule included all import duties and levies including licence fees lawfully payable by the contractor on imported goods/items and other taxes and duties on bought-out components, materials, equipments and other items and no such taxes, duties & levies shall be additionally payable by the BSPTCL. Tenderer are also to confirm that no taxes and duties (except entry tax if applicable) shall be payable by the BSPTCL/Purchaser on bought-out items which are dispatched by the Sub-vendors of the contractor directly to the project site on sale-in-transit basis. However, BSPTCL shall provide necessary concessional sales tax declaration from, as concessional sales tax has been included in the price for such sale in transit transactions.

Section 40

Details

It is hereby confirmed that the bidder/tenderer is making the offer on the basis of a divisible supply-cum-Erection Contract on a single source responsibilit...

It is hereby confirmed that the bidder/tenderer is making the offer on the basis of a divisible supply-cum-Erection Contract on a single source responsibility basis. The supply portion of the Contract will relate to supply of equipments/materials and erection portion will relate to transportation, insurance, storage, intallation, construction, stringing, testing and ommissioning etc as defined in price schedules. The Tender/bidder has no objection if the contract is considered to be placed in to separate contracts, i.e., one contract for supply of all equipment on ex-works basis and second contract for all services such as in land transportation, insurance, handling at site, storage, isurance, erection, testing and commissioning etc of materials/ items as defined in the tender specifications.

Section 41

Details

It is hereby confirmed that the bidder/tenderer is making the offer on the basis of a divisible supply-cum-Erection Contract on a single source responsibilit...

It is hereby confirmed that the bidder/tenderer is making the offer on the basis of a divisible supply-cum-Erection Contract on a single source responsibility basis. The supply portion of the Contract will relate to supply of equipments/materials and erection portion will relate to transportation, insurance, storage, intallation, construction, stringing, testing and ommissioning etc as defined in price schedules. The Tender/bidder has no objection if the contract is considered to be placed in to separate contracts, i.e., one contract for supply of all equipment on ex-works basis and second contract for all services such as in land transportation, insurance, handling at site, storage, isurance, erection, testing and commissioning etc of materials/ items as defined in the tender specifications.

Section 42

Details

This is also hereby confirmed that the award of two contracts will not in any way absolve the contractor of any responsibility and obligation as per the term...

This is also hereby confirmed that the award of two contracts will not in any way absolve the contractor of any responsibility and obligation as per the terms and conditions of the tender specification for succesful completion of the complete work as per the tender specifications and both the contract will have a cross fall breach Clause i.e., a breach in one contract will automatically be considered as breech of the other contract which will conform the BSPTCL/Purchaser/ Employer the right to terminate the other contract at th contractor's risk and cost.

Section 43

Details

It is hereby confirmed that if any income-tax, surcharge on income tax or any other corporate tax is applicable/payble under the law, the same shall be paid ...

It is hereby confirmed that if any income-tax, surcharge on income tax or any other corporate tax is applicable/payble under the law, the same shall be paid by the contractor.

Section 44

Details

It is confirmed that the contract shall be executed strictly in accordance with the specifications and documents except for the variations and deviations, al...

It is confirmed that the contract shall be executed strictly in accordance with the specifications and documents except for the variations and deviations, all of which have been detailed out exhaustively in the respective schedules irrespective of what soever has been stated to the contrary any where else in the tender/offer/bid.

Section 45

Details

Confirm that the Price clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account w...

Confirm that the Price clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 46

Details

Confirm that the Security Deposit clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on an...

Confirm that the Security Deposit clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 47

Details

Confirm that the Earnest Money clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any a...

Confirm that the Earnest Money clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 48

Details

Confirm that the Liquidated damage for delay clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are ...

Confirm that the Liquidated damage for delay clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 49

Details

Confirm that the Guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...

Confirm that the Guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 50

Details

Confirm that the Terms of payment clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on an...

Confirm that the Terms of payment clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 51

Details

Confirm that the Performance guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken ...

Confirm that the Performance guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 52

Details

Confirm that the Taking over clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any acc...

Confirm that the Taking over clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 53

Details

Confirm that the Insurance clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...

Confirm that the Insurance clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 54

Details

Confirm that the Negligence clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any acco...

Confirm that the Negligence clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 55

Details

Confirm that the Agreement clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...

Confirm that the Agreement clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 56

Details

Confirm that the Time for execution of the contract clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptio...

Confirm that the Time for execution of the contract clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 57

Details

Confirm that additional conditions, deviations, if any, found in the proposal documents other than those stated in the deviation schedules, save the pretaini...

Confirm that additional conditions, deviations, if any, found in the proposal documents other than those stated in the deviation schedules, save the pretaining to any rebate, offered, shall stand with drawn.

Section 58

Details

Unit rates of items/equipments/works as and where required have been furnished

Unit rates of items/equipments/works as and where required have been furnished

Section 59

Details

The details of equipments/materials proposed to be supplied as bought out items have been furnished in a separate schedule.

The details of equipments/materials proposed to be supplied as bought out items have been furnished in a separate schedule.

Section 60

Details

The required documents related to the pre-qualification of he tenderers as detailed in the tender specifications has been furnished in the tender. The docume...

The required documents related to the pre-qualification of he tenderers as detailed in the tender specifications has been furnished in the tender. The documents for the fulfillment of the requirement of the tender specifications have been furnished.

Section 61

Details

Confirm that if the offer is submitted against the tender is accepted by the BSPTCL, the contractor agree to submit engineering data, provide services and co...

Confirm that if the offer is submitted against the tender is accepted by the BSPTCL, the contractor agree to submit engineering data, provide services and complete the entire work in accordance with schedule indicated in the tender/offer. It has been clearly understood that the time for completion of the project is the essence of the contract and hence the execution schedule shall be strictly adhered to the execution schedule has been furnished with the offer.

Section 62

Details

Separate schedule for each item for which L.S. price have been quoted should be furnished with part I of the tender.

Separate schedule for each item for which L.S. price have been quoted should be furnished with part I of the tender.

Section 63

Details

Confirm that all equipments and materials confirming strictly to the tender specification only shall be offered to be delivered in case the order is placed o...

Confirm that all equipments and materials confirming strictly to the tender specification only shall be offered to be delivered in case the order is placed on the bidder. In case of any deviations in the technical specification or make of offered materials/equipments, the BSPTCL shall not be responsibble for any delay even if it is approved proved.

Section 64

Details

Confirm that no extra claim shall be entertained by the BSPTCL for the specified scope of work

Confirm that no extra claim shall be entertained by the BSPTCL for the specified scope of work

Authority Records

BIHAR STATE POWER TRANSMISSION COMPANY LIMITED
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

Tender Notice.pdf

NIT

NIT No. 01-Tender Specs for ERS-converted (1).pdf

NIT

NIT No. 01-Tender Specs for ERS_Updated.pdf

NIT

Clarification NIT 01.pdf

NIT

87987_PRICEBIDSHEETFORERSNEW_uploaded.xlsx

GENERAL_DOCUMENT

Past Similar Tenders (Historical Results)

5 found

Emergency Restoration System (ERS) suitable for 400kV Transmission Lines

Power Grid Corporation Of India Limited

Posted: 22 May 2025
Closed: 8 August 2025
GEM

Emergency Restoration System (ERS) suitable for 400kV Transmission Lines

Power Grid Corporation Of India Limited

Posted: 22 May 2025
Closed: 8 August 2025
GEM

Tender Notice for Design Manufacture Testing Supply and Demonstration for Erection at Purchasers location of Emergency Restoration System (ERS) in SRINAGAR, JAMMU AND KASHMIR

N/A

SRINAGAR, JAMMU AND KASHMIR

Posted: 16 December 2015
Closed: 4 May 2016
EPROCURE

Contract Bidding Open For Supply of 2 No. complete set of aluminum based re-usable ERS (Emergency Restoration system,) tension Tower for 400 KV D/C Baglihar-Kishanpur transmission line in RAMBAN, JAMMU AND KASHMIR

N/A

RAMBAN, JAMMU AND KASHMIR

Posted: 16 February 2024
Closed: 9 April 2024
EPROCURE

Package ERS-1 for procurement of Emergency Restoration System (ERS) suitable upto 765kV AC/± 800kV

Power Grid Corporation Of India Limited

Posted: 30 April 2025
Closed: 1 September 2025
GEM

Bill of Quantities (BOQ) 1 Item Sign in for GEM prices

#NIT-01

Design, manufacture, testing, supply and delivery of 01 (one) set of Emergency Restoration System (ERS) (10 Tension type + 06 Suspension type) suitable for 220KV transmission lines as well as 132kV transmission line

Design, manufacture, testing, supply and delivery of 01 (one) set of Emergency Restoration System (ERS) (10 Tension type + 06 Suspension type) suitable for 220KV transmission lines as well as 132kV transmission line

1 WORK Rate: ₹18,51,03,325 Est: ₹1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Similar Tenders

5 found
Urgent

Tender Notice for Work in MATHURA, UTTAR PRADESH

UP Power Transmission Corp.Ltd (Operation)

📍 MATHURA, UTTAR PRADESH

EMD: ₹26,000
Est: ₹22.1 L
⏰ Deadline: 3 days left
🛒 Type: Works
View EPROCURE
Urgent

Annual rate contract for emergency restoration work of 220kV and 400kV various Lines on Tower Structure under Rajkot Zone.

Gujarat Energy Transmission Corporation Limited

📍 RAJKOT, GUJARAT

Est: ₹2.2 Cr
⏰ Deadline: 7 days left
🛒 Type: Service
View NPROCURE

Supply of Emergency Response Kits as per department technical specification - reg.

📍 KARNATAKA

EMD: ₹10.3 L
Est: ₹10.3 Cr
⏰ Deadline: 5 weeks left
🛒 Type: Goods
View EPROCURE-KARNATAKA
Urgent

Procurement Opportunity: FOR REPLACEMENT OF MAIN PIPE LINE OF EMULSIFIRE SYSTEM INSTALLED AT 220KV S/S NAUBASTA KANPUR UNDER ETD-II KANPUR. in KANPUR NAGAR, UTTAR PRADESH

UP Power Transmission Corp.Ltd (Operation)

📍 KANPUR NAGAR, UTTAR PRADESH

EMD: ₹4,500
Est: ₹3.2 L
⏰ Deadline: 4 days left
🛒 Type: Works
View EPROCURE

Open Tender for Works related to the installation of protection systems and new LT Low Tension lines under the Business Plan for the year 2026 27 under the Executive Engineer Electricity Distribution Division Khalilabad in SANT KABEER NAGAR, UTTAR PRADESH

Purvanchal Vidyut Vitran Nigam Limited Varanasi

📍 SANT KABEER NAGAR, UTTAR PRADESH

EMD: ₹20,000
⏰ Deadline: 2 weeks left
🛒 Type: Works
View EPROCURE
Chat with us