GEM

Contract Bidding Open For Lot-1 Cast steel Wheel and Axle assembly with bearing.,Lot-2 C. I. Pedestal Bearing for 2" shaft,Lo in NAGPUR, MAHARASHTRA

Bid Publish Date

22-Dec-2025, 4:10 pm

Bid End Date

12-Jan-2026, 12:00 pm

EMD

₹1

Progress

Issue22-Dec-2025, 4:10 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1000

Category

Lot-1 Cast steel Wheel and Axle assembly with bearing.

Bid Type

Two Packet Bid

Categories 2

Moil Limited announces a tender for Lot-1 Cast steel Wheel and Axle assembly with bearing. , Lot-2 C. I. Pedestal Bearing for 2" shaft, Lot-3 Wheel and Axle assembly inside journal type. in NAGPUR, MAHARASHTRA. Quantity: 1000. Submission Deadline: 12-01-2026 12: 00: 00. Last date to apply is approaching fast!

Past Similar Tenders (Historical Results)

5 found

BEARING,GEAR,HOUSING DIFFERENTIAL,BEARING,BEARING,SHAFT REAR WHEEL,GEAR, DRIVEN,HOUSING,HALF AXLE,L

Eastern Coalfields Limited

BARDHAMAN, WEST BENGAL

Posted: 19 February 2025
Closed: 12 March 2025
GEM

Indian Army Wiper Blade Main Shaft Assembly Bearings Regulator Bearing Axle Tender Kangra Himachal Pradesh 2025

Indian Army

KANGRA, HIMACHAL PRADESH

Posted: 15 November 2025
Closed: 25 November 2025
GEM

WHEEL CYLINDER REAR LH,WHEEL CYLINDER REAR RH,CLUTCH PLATE,WIPER MOTOR,BEARING AXLE ROLLER,UNIVERSA

Indian Army

KANGRA, HIMACHAL PRADESH

Posted: 4 February 2025
Closed: 25 February 2025
GEM

Crankshaft Assembly Rear,Bearing Cell-003,Bearing Cell-002,Balance Shaft Bearing Cell,Piston Kit Ty

Indian Army

DEHRADUN, UTTARAKHAND

Posted: 27 September 2025
Closed: 7 October 2025
GEM

AXLE BOX, WHEEL&AXLE ASSY, 060.002. 00.015A

Bokaro Steel Plant

Posted: 12 November 2024
Closed: 27 November 2024
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Additional Doc 3 (Requested in ATC)

6

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer