TenderDekho Logo
Active GEM

Bids are Invited For Sanitary Napkins Incinerator Machine with Smoke Control Unit in CHITTOOR, ANDHRA PRADESH

Bid Publish Date

31-Aug-2026, 5:34 pm

Bid End Date

05-Sep-2026, 6:00 pm

Location

CHITTOOR , ANDHRA PRADESH

Progress

Issue31-Aug-2026, 5:34 pm
AwardPending

A tender has been published for South Coast Railway Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3) in CHITTOOR, ANDHRA PRADESH. Quantity: 6 by. Submission Deadline: 05-09-2026 18: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

6

Bid Type

Single Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Tirupati

Delivery Pincodes

517506

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
SAPAVATH RAJU517506,O/o Chief Workshop Manager, Carriage Repair Shop, Administrative office Building, Settipalli , Tirupati - 517506.TirupatiAndhra Pradesh517506630-

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9827219.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Indian Railways

Office Name

Principal Chief Material Manager Visakhapatnam

Grievance Contact

[email protected]

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
GENERAL Type Wall Mountable
GENERAL Stand provided No, Yes
DIMENSIONS OF MAIN UNIT Thickness of thermal Insulation material (mm) 25.0
DIMENSIONS OF MAIN UNIT Thickness of MS/SS sheet of burning chamber (internal) (mm) (Min) 3, 5 Or higher
DIMENSIONS OF MAIN UNIT Machine Weight(kg) 5-15, 16-30
DIMENSIONS OF MAIN UNIT Thickness of door including insulation (mm) 20.0
DIMENSIONS OF MAIN UNIT Flexible emission Outlet pipe dia (mm) 63.0, 25.0
MATERIAL OF MACHINE UNIT Material of Housing cabinet (External) Mild Steel(CRCA) sheet
MATERIAL OF MACHINE UNIT Material of Burning chamber (Internal) Mild Steel(CRCA) sheet, Stainless Steel sheet of SS-304 grade
MATERIAL OF MACHINE UNIT Material of Thermal Insulation High Density Ceramic Fiber sheet
CONTROL & FUNCTIONAL FEATURES Temperature indicator provided Yes
CONTROL & FUNCTIONAL FEATURES Minimum Burning temperature (degree C) 800
CONTROL & FUNCTIONAL FEATURES Burning Capacity per day (Number of Napkins) 51-100, 100-200
CONTROL & FUNCTIONAL FEATURES Burning Capacity at a time (Number of Napkins) 1-15
CONTROL & FUNCTIONAL FEATURES Burning time of full capacity Napkins/pads (minutes) (Max) 5.0, 15.0, 10.0
ELECTRICAL AND SAFETY FEATURES Automatic digital controller for time Yes
ELECTRICAL AND SAFETY FEATURES Automatic digital controller for temperature Yes
SMOKE CONTROL UNIT (SCU) Type of SCU (Smoke Control Unit) Top mounted
SMOKE CONTROL UNIT (SCU) Material of housing of Smoke Control Unit (SCU) Mild Steel(CRCA) cabinet
SMOKE CONTROL UNIT (SCU) Both carbon Control and Foul odour Control Chambers for filteration of smoke emission Yes
SMOKE CONTROL UNIT (SCU) Number of filters in Carbon control chamber Two, Three
SMOKE CONTROL UNIT (SCU) Type of filters in Carbon control chamber Activated Carbon filter
SMOKE CONTROL UNIT (SCU) Number of filters in Odour control chamber One, Two
SMOKE CONTROL UNIT (SCU) Blower RPM 2700, 1800
PERFORMANCE REQUIREMENTS Warranty in Years (Option of comprehensive warranty is available through bidding only, which if opted will supersede normal warranty in the catalogue) 1, 2, 3, 4, 5 Or higher