TenderDekho Logo
GEM

Government Tender Published for CS Pipe Fitting - Bend 15, LR, DN15,CS Pipe Fitting - Bend 15, LR, DN20,CS Pipe Fitting - Bend 15, in TIRUNELVELI, TAMIL NADU

Bid Publish Date

15-May-2025, 6:38 pm

Bid End Date

06-Jun-2025, 11:00 am

EMD

₹1,133

Progress

Issue15-May-2025, 6:38 pm
Technical27-05-2025 13:12:05
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

4445

Category

CS Pipe Fitting - Bend 15, LR, DN15

Bid Type

Two Packet Bid

Categories 38

Nuclear Power Corporation Of India Limited announces a tender for CS Pipe Fitting - Bend 15, LR, DN15, CS Pipe Fitting - Bend 15, LR, DN20, CS Pipe Fitting - Bend 15, in TIRUNELVELI, TAMIL NADU. Quantity: 4445. Submission Deadline: 06-06-2025 11: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7743484.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 200 Items Sign in for GEM prices

#1

CS Pipe Fitting - Bend 15, LR, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN15, Type - Bend 15, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

4 nos Delivery: 126 days
#2

CS Pipe Fitting - Bend 15, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20, Type - Bend 15, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

6 nos Delivery: 126 days
#3

CS Pipe Fitting - Bend 15, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25, Type - Bend 15, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

14 nos Delivery: 126 days
#4

CS Pipe Fitting - Bend 30, LR, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN15, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

5 nos Delivery: 126 days
#5

CS Pipe Fitting - Bend 30, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

14 nos Delivery: 126 days
#6

CS Pipe Fitting - Bend 30, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

6 nos Delivery: 126 days
#7

CS Pipe Fitting - Bend 30, LR, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN32, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

4 nos Delivery: 126 days
#8

CS Pipe Fitting - Bend 30, LR, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

4 nos Delivery: 126 days
#9

CS Pipe Fitting - Bend 30, LR, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#10

CS Pipe Fitting - Bend 30, LR, DN125

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN125, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#11

CS Pipe Fitting - Bend 30, LR, DN150

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN150, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#12

CS Pipe Fitting - Bend 30, LR, DN250

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN250, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#13

CS Pipe Fitting - Bend 45, LR, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN10, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

5 nos Delivery: 126 days
#14

CS Pipe Fitting - Bend 45, LR, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN15, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

16 nos Delivery: 126 days
#15

CS Pipe Fitting - Bend 45, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

42 nos Delivery: 126 days
#16

CS Pipe Fitting - Bend 45, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

33 nos Delivery: 126 days
#17

CS Pipe Fitting - Bend 45, LR, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN32, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

9 nos Delivery: 126 days
#18

CS Pipe Fitting - Bend 45, LR, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

35 nos Delivery: 126 days
#19

CS Pipe Fitting - Bend 45, LR, DN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN80, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

8 nos Delivery: 126 days
#20

CS Pipe Fitting - Bend 45, LR, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

7 nos Delivery: 126 days
#21

CS Pipe Fitting - Bend 45, LR, DN125

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN125, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

17 nos Delivery: 126 days
#22

CS Pipe Fitting - Bend 45, LR, DN150

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN150, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#23

CS Pipe Fitting - Bend 45, LR, DN200

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN200, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#24

CS Pipe Fitting - Bend 45, LR, DN250

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN250, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

25 nos Delivery: 126 days
#25

CS Pipe Fitting - Bend 60, LR, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN10, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#26

CS Pipe Fitting - Bend 60, LR, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN15, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

5 nos Delivery: 126 days
#27

CS Pipe Fitting - Bend 60, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

9 nos Delivery: 126 days
#28

CS Pipe Fitting - Bend 60, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

4 nos Delivery: 126 days
#29

CS Pipe Fitting - Bend 60, LR, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

4 nos Delivery: 126 days
#30

CS Pipe Fitting - Bend 60, LR, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#31

CS Pipe Fitting - Bend 60, LR, DN125

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN125, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#32

CS Pipe Fitting - Bend 90, LR, DN8

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN8, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

8 nos Delivery: 126 days
#33

CS Pipe Fitting - Bend 90, LR, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN10, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

113 nos Delivery: 126 days
#34

CS Pipe Fitting - Bend 90, LR, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN15, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

192 nos Delivery: 126 days
#35

CS Pipe Fitting - Bend 90, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

95 nos Delivery: 126 days
#36

CS Pipe Fitting - Bend 90, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

201 nos Delivery: 126 days
#37

CS Pipe Fitting - Bend 90, LR, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN32, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

40 nos Delivery: 126 days
#38

CS Pipe Fitting - Bend 90, LR, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

207 nos Delivery: 126 days
#39

CS Pipe Fitting - Bend 90, LR, DN65

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN65, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

12 nos Delivery: 126 days
#40

CS Pipe Fitting - Bend 90, LR, DN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN80, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

67 nos Delivery: 126 days
#41

CS Pipe Fitting - Bend 90, LR, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

37 nos Delivery: 126 days
#42

CS Pipe Fitting - Bend 90, LR, DN125

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN125, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

36 nos Delivery: 126 days
#43

CS Pipe Fitting - Bend 90, LR, DN150

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN150, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

26 nos Delivery: 126 days
#44

CS Pipe Fitting - Bend 90, LR, DN200

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN200, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

5 nos Delivery: 126 days
#45

CS Pipe Fitting - Bend 90, LR, DN250

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN250, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

34 nos Delivery: 126 days
#46

CS Pipe Fitting - Boss, M20x1.5

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 105, BW, Size - M20x1.5, Type - Boss - I and C connector, female threads, Butt Welded end condition, Rating - 300, Standard - As per drg.

4 nos Delivery: 126 days
#47

CS Pipe Fitting - Concentric Reducer, DN15xDN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN15xDN10, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

9 nos Delivery: 126 days
#48

CS Pipe Fitting - Concentric Reducer, DN20xDN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20xDN10, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#49

CS Pipe Fitting - Concentric Reducer, DN20xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20xDN15, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#50

CS Pipe Fitting - Concentric Reducer, DN25xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25xDN15, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

8 nos Delivery: 126 days
#51

CS Pipe Fitting - Concentric Reducer, DN25xDN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25xDN20, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

7 nos Delivery: 126 days
#52

CS Pipe Fitting - Concentric Reducer, DN32xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN32xDN15, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#53

CS Pipe Fitting - Concentric Reducer, DN32xDN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN32xDN20, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#54

CS Pipe Fitting - Concentric Reducer, DN32xDN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN32xDN25, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

12 nos Delivery: 126 days
#55

CS Pipe Fitting - Concentric Reducer, DN50xDN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50xDN32, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

15 nos Delivery: 126 days
#56

CS Pipe Fitting - Concentric Reducer, DN65XDN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN65XDN50, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

9 nos Delivery: 126 days
#57

CS Pipe Fitting - Concentric Reducer, DN80xDN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN80xDN50, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

13 nos Delivery: 126 days
#58

CS Pipe Fitting - Concentric Reducer, DN80xDN65

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN80xDN65, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#59

CS Pipe Fitting - Concentric Reducer, DN100xDN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100xDN50, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#60

CS Pipe Fitting - Concentric Reducer, DN100xDN65

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100xDN65, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#61

CS Pipe Fitting - Concentric Reducer, DN100xDN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100xDN80, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

20 nos Delivery: 126 days
#62

CS Pipe Fitting - Concentric Reducer, DN125xDN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN125xDN100, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

5 nos Delivery: 126 days
#63

CS Pipe Fitting - Concentric Reducer, DN150xDN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN150xDN100, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

5 nos Delivery: 126 days
#64

CS Pipe Fitting - Concentric Reducer, DN150xDN125

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN150xDN125, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#65

CS Pipe Fitting - Concentric Reducer, DN200xDN150

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN200xDN150, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

7 nos Delivery: 126 days
#66

CS Pipe Fitting - Concentric Reducer, DN250xDN200

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN250xDN200, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

7 nos Delivery: 126 days
#67

CS Pipe Fitting - End Cap, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN15, Type - End Cap, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#68

CS Pipe Fitting - End Cap, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20, Type - End Cap, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#69

CS Pipe Fitting - End Cap, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25, Type - End Cap, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#70

CS Pipe Fitting - End Cap, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50, Type - End Cap, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#71

CS Pipe Fitting - Olet, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 105, BW, Size - DN10, Type - Olet - Run pipe DN50 to DN250, Butt Welded end condition, Rating - 300, Standard - MSS SP 97

4 nos Delivery: 126 days
#72

CS Pipe Fitting - Tee Equal, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN10, Type - Tee Equal, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

22 nos Delivery: 126 days
#73

CS Pipe Fitting - Tee Equal, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN15, Type - Tee Equal, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

33 nos Delivery: 126 days
#74

CS Pipe Fitting - Tee Equal, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20, Type - Tee Equal, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

6 nos Delivery: 126 days
#75

CS Pipe Fitting - Tee Equal, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25, Type - Tee Equal, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

17 nos Delivery: 126 days
#76

CS Pipe Fitting - Tee Equal, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN32, Type - Tee Equal, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

6 nos Delivery: 126 days
#77

CS Pipe Fitting - Tee Equal, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50, Type - Tee Equal, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

17 nos Delivery: 126 days
#78

CS Pipe Fitting - Tee Equal, DN65

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN65, Type - Tee Equal, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#79

CS Pipe Fitting - Tee Equal, DN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN80, Type - Tee Equal, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#80

CS Pipe Fitting - Tee Equal, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100, Type - Tee Equal, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

4 nos Delivery: 126 days
#81

CS Pipe Fitting - Tee Reducing, DN20xDN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20xDN10, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#82

CS Pipe Fitting - Tee Reducing, DN20xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN20xDN15, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

7 nos Delivery: 126 days
#83

CS Pipe Fitting - Tee Reducing, DN25xDN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25xDN10, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

8 nos Delivery: 126 days
#84

CS Pipe Fitting - Tee Reducing, DN25xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25xDN15, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

33 nos Delivery: 126 days
#85

CS Pipe Fitting - Tee Reducing, DN25xDN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN25xDN20, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

8 nos Delivery: 126 days
#86

CS Pipe Fitting - Tee Reducing, DN32xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN32xDN15, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#87

CS Pipe Fitting - Tee Reducing, DN50xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50xDN15, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

5 nos Delivery: 126 days
#88

CS Pipe Fitting - Tee Reducing, DN50xDN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50xDN20, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

4 nos Delivery: 126 days
#89

CS Pipe Fitting - Tee Reducing, DN50xDN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN50xDN25, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

4 nos Delivery: 126 days
#90

CS Pipe Fitting - Tee Reducing, DN65XDN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN65XDN50, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#91

CS Pipe Fitting - Tee Reducing, DN100xDN65

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100xDN65, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

3 nos Delivery: 126 days
#92

CS Pipe Fitting - Tee Reducing, DN100xDN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Pipe Fitting confirming to ASTM A 234 WPB, BW, Size - DN100xDN80, Type - Tee Reducing, Butt Welded end condition, Schedule - 40, Standard - ASME B 16.9

2 nos Delivery: 126 days
#93

CS Flange, Blind 6 mm, DN300

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, Blind 6 mm, confirming to ASTM A 516 Gr 60, Size - DN300

2 nos Delivery: 126 days
#94

CS Flange, WNRF, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, WNRF, confirming to ASTM A 105, Size - DN10, Rating - 300, Standard - ASME B 16.5

5 nos Delivery: 126 days
#95

CS Flange, WNRF, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, WNRF, confirming to ASTM A 105, Size - DN15, Rating - 300, Standard - ASME B 16.5

22 nos Delivery: 126 days
#96

CS Flange, WNRF, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, WNRF, confirming to ASTM A 105, Size - DN20, Rating - 300, Standard - ASME B 16.5

18 nos Delivery: 126 days
#97

CS Flange, WNRF, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, WNRF, confirming to ASTM A 105, Size - DN25, Rating - 300, Standard - ASME B 16.5

3 nos Delivery: 126 days
#98

CS Flange, WNRF, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, WNRF, confirming to ASTM A 105, Size - DN50, Rating - 150, Standard - ASME B 16.5

20 nos Delivery: 126 days
#99

CS Flange, WNRF, DN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, WNRF, confirming to ASTM A 105, Size - DN80, Rating - 150, Standard - ASME B 16.5

10 nos Delivery: 126 days
#100

CS Flange, WNRF, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, WNRF, confirming to ASTM A 105, Size - DN100, Rating - 150, Standard - ASME B 16.5

10 nos Delivery: 126 days
#101

CS Flange, WNRF, DN200

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, WNRF, confirming to ASTM A 105, Size - DN200, Rating - 150, Standard - ASME B 16.5

6 nos Delivery: 126 days
#102

CS Flange, WNRF, DN250

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Carbon Steel Flange, WNRF, confirming to ASTM A 105, Size - DN250, Rating - 150, Standard - ASME B 16.5

8 nos Delivery: 126 days
#103

SS Pipe Fitting - Bend 15, LR, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN10, Type - Bend 15, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

9 nos Delivery: 126 days
#104

SS Pipe Fitting - Bend 15, LR, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN15, Type - Bend 15, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

4 nos Delivery: 126 days
#105

SS Pipe Fitting - Bend 15, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN20, Type - Bend 15, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#106

SS Pipe Fitting - Bend 15, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN25, Type - Bend 15, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

14 nos Delivery: 126 days
#107

SS Pipe Fitting - Bend 15, LR, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50, Type - Bend 15, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

5 nos Delivery: 126 days
#108

SS Pipe Fitting - Bend 30, LR, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN10, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

15 nos Delivery: 126 days
#109

SS Pipe Fitting - Bend 30, LR, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN15, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

14 nos Delivery: 126 days
#110

SS Pipe Fitting - Bend 30, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN20, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

5 nos Delivery: 126 days
#111

SS Pipe Fitting - Bend 30, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN25, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

18 nos Delivery: 126 days
#112

SS Pipe Fitting - Bend 30, LR, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN32, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

16 nos Delivery: 126 days
#113

SS Pipe Fitting - Bend 30, LR, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50, Type - Bend 30, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#114

SS Pipe Fitting - Bend 45, LR, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN10, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

58 nos Delivery: 126 days
#115

SS Pipe Fitting - Bend 45, LR, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN15, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

17 nos Delivery: 126 days
#116

SS Pipe Fitting - Bend 45, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN20, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#117

SS Pipe Fitting - Bend 45, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN25, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

39 nos Delivery: 126 days
#118

SS Pipe Fitting - Bend 45, LR, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN32, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

9 nos Delivery: 126 days
#119

SS Pipe Fitting - Bend 45, LR, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

100 nos Delivery: 126 days
#120

SS Pipe Fitting - Bend 45, LR, DN150

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN150, Type - Bend 45, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

8 nos Delivery: 126 days
#121

SS Pipe Fitting - Bend 60, LR, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN10, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

5 nos Delivery: 126 days
#122

SS Pipe Fitting - Bend 60, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN20, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#123

SS Pipe Fitting - Bend 60, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN25, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#124

SS Pipe Fitting - Bend 60, LR, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN32, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#125

SS Pipe Fitting - Bend 60, LR, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50, Type - Bend 60, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#126

SS Pipe Fitting - Bend 90, LR, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN10, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

160 nos Delivery: 126 days
#127

SS Pipe Fitting - Bend 90, LR, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN15, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

94 nos Delivery: 126 days
#128

SS Pipe Fitting - Bend 90, LR, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN20, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

36 nos Delivery: 126 days
#129

SS Pipe Fitting - Bend 90, LR, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN25, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

168 nos Delivery: 126 days
#130

SS Pipe Fitting - Bend 90, LR, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN32, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

57 nos Delivery: 126 days
#131

SS Pipe Fitting - Bend 90, LR, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

526 nos Delivery: 126 days
#132

SS Pipe Fitting - Bend 90, LR, DN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN80, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

10 nos Delivery: 126 days
#133

SS Pipe Fitting - Bend 90, LR, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN100, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

15 nos Delivery: 126 days
#134

SS Pipe Fitting - Bend 90, LR, DN150

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN150, Type - Bend 90, LR, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

13 nos Delivery: 126 days
#135

SS Pipe Fitting - Boss, M20x1.5

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 182 Gr F304L, BW, Size - M20x1.5, Type - Boss - IandC connector, female threads, Butt Welded end condition, Rating - 300, Standard - As per drg.

7 nos Delivery: 126 days
#136

SS Pipe Fitting - Boss, M27x2

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 182 Gr F304L, BW, Size - M27x2, Type - Boss - IandC connector, female threads, Butt Welded end condition, Rating - 300, Standard - As per drg.

3 nos Delivery: 126 days
#137

SS Pipe Fitting - Concentric Reducer, DN15xDN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN15xDN10, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#138

SS Pipe Fitting - Concentric Reducer, DN25xDN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN25xDN10, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#139

SS Pipe Fitting - Concentric Reducer, DN25xDN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN25xDN20, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

11 nos Delivery: 126 days
#140

SS Pipe Fitting - Concentric Reducer, DN32xDN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN32xDN20, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#141

SS Pipe Fitting - Concentric Reducer, DN38xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN38xDN15, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

5 nos Delivery: 126 days
#142

SS Pipe Fitting - Concentric Reducer, DN50xDN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50xDN25, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

10 nos Delivery: 126 days
#143

SS Pipe Fitting - Concentric Reducer, DN50xDN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50xDN32, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

12 nos Delivery: 126 days
#144

SS Pipe Fitting - Concentric Reducer, ID52xID40

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - ID52xID40, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S

2 nos Delivery: 126 days
#145

SS Pipe Fitting - Concentric Reducer, DN80xDN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN80xDN50, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

9 nos Delivery: 126 days
#146

SS Pipe Fitting - Concentric Reducer, DN100xDN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN100xDN50, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

23 nos Delivery: 126 days
#147

SS Pipe Fitting - Concentric Reducer, DN100xDN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN100xDN80, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#148

SS Pipe Fitting - Concentric Reducer, DN150xDN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN150xDN100, Type - Concentric Reducer, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#149

SS Pipe Fitting - End Cap, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN10, Type - End Cap, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

18 nos Delivery: 126 days
#150

SS Pipe Fitting - End Cap, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN15, Type - End Cap, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#151

SS Pipe Fitting - End Cap, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN20, Type - End Cap, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#152

SS Pipe Fitting - End Cap, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN32, Type - End Cap, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#153

SS Pipe Fitting - End Cap, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50, Type - End Cap, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

5 nos Delivery: 126 days
#154

SS Pipe Fitting - End Cap, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN100, Type - End Cap, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#155

SS Pipe Fitting - End Cap, DN150

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN150, Type - End Cap, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#156

SS Pipe Fitting - Olet - Run pipe DN150 to DN250, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 182 Gr F304L, BW, Size - DN50, Type - Olet - Run pipe DN150 to DN250, Butt Welded end condition, Rating - 150, Standard - MSS SP 97

2 nos Delivery: 126 days
#157

SS Pipe Fitting - Olet - Run pipe DN50 to DN250, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 182 Gr F304L, BW, Size - DN10, Type - Olet - Run pipe DN50 to DN250, Butt Welded end condition, Rating - 300, Standard - MSS SP 97

7 nos Delivery: 126 days
#158

SS Pipe Fitting - Olet - Run pipe DN50 to DN250, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 182 Gr F304L, BW, Size - DN15, Type - Olet - Run pipe DN50 to DN250, Butt Welded end condition, Rating - 300, Standard - MSS SP 97

2 nos Delivery: 126 days
#159

SS Pipe Fitting - Olet - Run pipe DN50 to DN250, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 182 Gr F304L, BW, Size - DN20, Type - Olet - Run pipe DN50 to DN250, Butt Welded end condition, Rating - 300, Standard - MSS SP 97

2 nos Delivery: 126 days
#160

SS Pipe Fitting - Tee Equal, DN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN10, Type - Tee Equal, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

37 nos Delivery: 126 days
#161

SS Pipe Fitting - Tee Equal, DN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN15, Type - Tee Equal, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

47 nos Delivery: 126 days
#162

SS Pipe Fitting - Tee Equal, DN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN20, Type - Tee Equal, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

7 nos Delivery: 126 days
#163

SS Pipe Fitting - Tee Equal, DN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN25, Type - Tee Equal, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

27 nos Delivery: 126 days
#164

SS Pipe Fitting - Tee Equal, DN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN32, Type - Tee Equal, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#165

SS Pipe Fitting - Tee Equal, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50, Type - Tee Equal, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

70 nos Delivery: 126 days
#166

SS Pipe Fitting - Tee Equal, DN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN80, Type - Tee Equal, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

4 nos Delivery: 126 days
#167

SS Pipe Fitting - Tee Equal, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN100, Type - Tee Equal, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#168

SS Pipe Fitting - Tee Equal, DN150

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN150, Type - Tee Equal, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

4 nos Delivery: 126 days
#169

SS Pipe Fitting - Tee Reducing, DN15xDN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN15xDN10, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

8 nos Delivery: 126 days
#170

SS Pipe Fitting - Tee Reducing, DN25xDN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN25xDN20, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

4 nos Delivery: 126 days
#171

SS Pipe Fitting - Tee Reducing, DN32xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN32xDN15, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#172

SS Pipe Fitting - Tee Reducing, DN50xDN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50xDN10, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

21 nos Delivery: 126 days
#173

SS Pipe Fitting - Tee Reducing, DN50xDN15

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50xDN15, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

9 nos Delivery: 126 days
#174

SS Pipe Fitting - Tee Reducing, DN50xDN20

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50xDN20, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

7 nos Delivery: 126 days
#175

SS Pipe Fitting - Tee Reducing, DN50xDN25

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50xDN25, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

19 nos Delivery: 126 days
#176

SS Pipe Fitting - Tee Reducing, DN50xDN32

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN50xDN32, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

12 nos Delivery: 126 days
#177

SS Pipe Fitting - Tee Reducing, DN65xDN10

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN65xDN10, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#178

SS Pipe Fitting - Tee Reducing, DN80xDN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN80xDN50, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

4 nos Delivery: 126 days
#179

SS Pipe Fitting - Tee Reducing, DN100xDN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN100xDN50, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

4 nos Delivery: 126 days
#180

SS Pipe Fitting - Tee Reducing, DN100xDN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN100xDN80, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

3 nos Delivery: 126 days
#181

SS Pipe Fitting - Tee Reducing, DN150xDN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN150xDN100, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

2 nos Delivery: 126 days
#182

SS Pipe Fitting - Tee Reducing, DN150xDN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Pipe Fitting confirming to ASTM A 403 Gr WP 304L-S, BW, Size - DN150xDN80, Type - Tee Reducing, Butt Welded end condition, Schedule - 40S, Standard - ASME B 16.9

5 nos Delivery: 126 days
#183

SS Flange, WNRF, DN50

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Flange, WNRF, confirming to ASTM A 182 Gr F304L, Size - DN50, Rating - 150, Standard - ASME B 16.5

30 nos Delivery: 126 days
#184

SS Flange, WNRF, DN80

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Flange, WNRF, confirming to ASTM A 182 Gr F304L, Size - DN80, Rating - 150, Standard - ASME B 16.5

15 nos Delivery: 126 days
#185

SS Flange, WNRF, DN100

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Flange, WNRF, confirming to ASTM A 182 Gr F304L, Size - DN100, Rating - 150, Standard - ASME B 16.5

3 nos Delivery: 126 days
#186

SS Flange, WNRF, DN150

Procurement of Raw Material, Manufacturing, Inspection, Testing, Documentation, Packing and Delivery of Stainless Steel Flange, WNRF, confirming to ASTM A 182 Gr F304L, Size - DN150, Rating - 150, Standard - ASME B 16.5

3 nos Delivery: 126 days
#187

Fasteners - Bolts, Nuts, Stud Bolts and Washers

Supply of Fasteners - Bolts, Stud Bolts, Nuts and Washers - as per Chapter-IV of Technical Specifications

1 lot Delivery: 126 days
#188

Gasket-CNAF - DN10

Supply of Gasket-CNAF, Size - DN10, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

5 nos Delivery: 126 days
#189

Gasket-CNAF - DN15

Supply of Gasket-CNAF, Size - DN15, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

23 nos Delivery: 126 days
#190

Gasket-CNAF - DN20

Supply of Gasket-CNAF, Size - DN20, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

18 nos Delivery: 126 days
#191

Gasket-CNAF - DN32

Supply of Gasket-CNAF, Size - DN32, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

3 nos Delivery: 126 days
#192

Gasket-CNAF - DN50

Supply of Gasket-CNAF, Size - DN50, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

35 nos Delivery: 126 days
#193

Gasket-CNAF - DN80

Supply of Gasket-CNAF, Size - DN80, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

10 nos Delivery: 126 days
#194

Gasket-CNAF - DN100

Supply of Gasket-CNAF, Size - DN100, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

12 nos Delivery: 126 days
#195

Gasket-CNAF - DN150

Supply of Gasket-CNAF, Size - DN150, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

3 nos Delivery: 126 days
#196

Gasket-CNAF - DN200

Supply of Gasket-CNAF, Size - DN200, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

8 nos Delivery: 126 days
#197

Gasket-CNAF - DN250

Supply of Gasket-CNAF, Size - DN250, Thickness - 2 mm, confirming to BS 7531 Gr X, Standard - BS 7531

10 nos Delivery: 126 days
#198

Rubber Hose - 16NB

Supply of Fiber braided rubber hose, Type 2, Size - 16 NB, confirming to IS 10660 - 1983, Rating - 6 MPa

52 mtr Delivery: 126 days
#199

Rubber Hose - 25NB

Supply of Fiber braided rubber hose, Type 2, Size - 25 NB, confirming to IS 10660 - 1983, Rating - 4MPa

500 mtr Delivery: 126 days
#200

Steam Trap - DN20

Supply of Thermodynamic Steam Trap, Size - DN20, confirming to ASTM A105, Rating - 800, Standard - Manufacturer standard

12 nos Delivery: 126 days

Required Documents

1

Additional Doc 1 (Requested in ATC)

2

Additional Doc 2 (Requested in ATC)

3

Additional Doc 3 (Requested in ATC)

4

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
JINDAL FORGING PRIVATE LIMITED   Under PMA
-27-05-2025 13:12:05
2
M/S PIPING ZONE   Under PMA
-06-06-2025 10:59:39
3
MECH WELL FITTINGS PRIVATE LIMITED   Under PMA
-03-06-2025 17:38:00
4
RAJMANI FITTINGS PRIVATE LIMITED   Under PMA
-04-06-2025 21:35:31
5
SUPER FORGE PRIVATE LIMITED   Under PMA
-05-06-2025 18:45:07

Frequently Asked Questions

Key insights about TAMIL NADU tender market

What are the eligibility requirements for CS and SS fittings procurement?

The eligibility requirements include being a registered entity that operates in the manufacturing or supply sector for CS and SS fittings. Bidders must demonstrate past experience in similar projects and provide relevant documentation proving their capability to fulfill the tender requirements.

What technical specifications must be met for CS and SS fittings?

Bidders must ensure that their products comply with recognized quality standards for CS and SS fittings. The technical specifications detail dimensions, materials, and finishing processes. Manufacturers are expected to provide documentation verifying compliance with these standards during the tender submission.

How is the Earnest Money Deposit (EMD) structured for this tender?

The Earnest Money Deposit (EMD) is required to secure the bid and demonstrate the seriousness of the proposal. Specific amounts are detailed in the tender documentation, and failure to comply with the EMD submission may lead to disqualification from the tender process.

What are the submission methods and deadlines for the tender?

Submissions must be made electronically through the designated government procurement platform. Bidders should pay close attention to the key timelines and deadlines specified in the tender documentation to ensure compliance.

What benefits are there for Micro and Small Enterprises (MSEs)?

Micro, Small, and Medium Enterprises (MSEs) can benefit from special provisions in this tender, which may include relaxed eligibility criteria, assistance during the bidding process, and potential advantages in evaluation to encourage participation and inclusivity in government procurements.