GEM

Open Tender for INTERCONNECTOR,ABS,5.7IN,RO SKID,ADVNC,THRUST CONE,PLSTCUPVC,78IN12MM,ROSKID,DUMMY END CAP,HE,ABS,1 in VISAKHAPATNAM, ANDHRA PRADESH

Bid Publish Date

16-Jan-2026, 11:33 am

Bid End Date

27-Jan-2026, 3:00 pm

Progress

Issue16-Jan-2026, 11:33 am
Corrigendum16-Jan-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3695

Category

INTERCONNECTOR,ABS,5.7IN,RO SKID,ADVNC

Bid Type

Two Packet Bid

Hindustan Petroleum Corporation Ltd announces a tender for INTERCONNECTOR, ABS, 5. 7IN, RO SKID, ADVNC, THRUST CONE, PLSTCUPVC, 78IN12MM, ROSKID, DUMMY END CAP, HE, ABS, 1IN THRD, RO SKID, O- RING, ENDCAP, INTRNL, NBR, 8IN, ROSKD, ADVNC, PERMEATE ADAPTER, UPVC, 142630145MM, VICTAULIC COUPLING, CS, 1IN, RO SKID, WBUSH, VICTAULIC COUPLING, 1. 5IN, RO SKID, WBUSH, VICTAULIC COUPLING, CS, 2IN, RO SKID, WBUSH, INTERCONNECTOR, ORING, NBR, RO SKID, ADVNC, O- RING, ADAPTER, NBR, RO SKID, ADVNC, PERMEATE PRDCT PORT, UPVC, 1. 252. 256. 5IN, PERMEATE PRDCT PORT, UPVC, 1. 252. 257IN, PERMEATE PRDCT PORT, NBR, RO SKID, ADVNC, CIRCLIP, SS304, 4555MM, RO SKID, ADVNC, DMP3 RUBBER GROMMET MB SAC, PERMEATE ADAPTER, UPVC, 152830140MM, DMP3, SAC1 STRAINER, DMP3, SAC, MB LATERAL STRAINER in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 3695. Submission Deadline: 27-01-2026 15: 00: 00. Last date to apply is approaching fast!

Documents 6

GeM-Bidding-8846101.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

1 found

THRUST CONE,PN 96163 F UF,RO I and II,BEARING PLATE,PN 96156 F UF,RO I and II,SEALING PLATE,PN 9616

Bharat Petroleum Corporation Ltd

SAGAR, MADHYA PRADESH

Posted: 7 February 2025
Closed: 3 March 2025
GEM

Bill of Quantities (BOQ) 18 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 INTERCONNECTOR,ABS,5.7IN,RO SKID,ADVNC Please refer detailed Item Line 50 each vnmpatrudu 56
2 THRUST CONE,PLSTCUPVC,78IN12MM,ROSKID Please refer detailed Item Line 50 each vnmpatrudu 56
3 DUMMY END CAP,HE,ABS,1IN THRD,RO SKID Please refer detailed Item Line 100 each vnmpatrudu 56
4 O-RING,ENDCAP,INTRNL,NBR,8IN,ROSKD,ADVNC Please refer detailed Item Line 100 each vnmpatrudu 56
5 PERMEATE ADAPTER,UPVC,142630145MM Please refer detailed Item Line 100 each vnmpatrudu 56
6 VICTAULIC COUPLING,CS,1IN,RO SKID,WBUSH Please refer detailed Item Line 100 each vnmpatrudu 56
7 VICTAULIC COUPLING,1.5IN,RO SKID,WBUSH Please refer detailed Item Line 100 each vnmpatrudu 56
8 VICTAULIC COUPLING,CS,2IN,RO SKID,WBUSH Please refer detailed Item Line 100 each vnmpatrudu 56
9 INTERCONNECTOR,ORING,NBR,RO SKID,ADVNC Please refer detailed Item Line 200 each vnmpatrudu 56
10 O-RING,ADAPTER,NBR,RO SKID,ADVNC Please refer detailed Item Line 200 each vnmpatrudu 56
11 PERMEATE PRDCT PORT,UPVC,1.252.256.5IN Please refer detailed Item Line 200 each vnmpatrudu 56
12 PERMEATE PRDCT PORT,UPVC,1.252.257IN Please refer detailed Item Line 200 each vnmpatrudu 56
13 PERMEATE PRDCT PORT,NBR,RO SKID,ADVNC Please refer detailed Item Line 200 each vnmpatrudu 56
14 CIRCLIP,SS304,4555MM,RO SKID,ADVNC Please refer detailed Item Line 300 each vnmpatrudu 56
15 DMP3 RUBBER GROMMET MB SAC Please refer detailed Item Line 300 each vnmpatrudu 56
16 PERMEATE ADAPTER,UPVC,152830140MM Please refer detailed Item Line 195 each vnmpatrudu 56
17 DMP3, SAC1 STRAINER Please refer detailed Item Line 800 each vnmpatrudu 56
18 DMP3, SAC,MB LATERAL STRAINER Please refer detailed Item Line 400 each vnmpatrudu 56

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Bidder Turnover

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

16-Jan-2026