Swachh Bharat Waste Container Set
Urban Development And Housing Department
GOPALGANJ, BIHAR
Progress
Quantity
2000
Bid Type
Two Packet Bid
Organization: Darbhanga District Panchayats, under the Department of Panchayati Raj, invites bids for a Swachh Bharat Waste Container Set. The scope includes Supply Installation Testing and Commissioning of the containers. The contract permits a quantity variation up to 25% during both initial and extended delivery periods. Bidders must provide an undertaking about non-liquidation and meet ISO 9001 certification requirements. The ATC emphasizes color customization to legacy guidance: 2000 pairs in Green and Blue. Estimated value and start/end dates are not disclosed. This procurement targets efficient waste management in Darbhanga district with emphasis on standardized quality and delivery performance.
Product: Swachh Bharat waste container set (Q3) with supply installation testing and commissioning
Quantities: 2000 Green, 2000 Blue pairs specified in ATC; other colors allowed per ATC
Standards: ISO 9001 certification required for bidder or OEM
Delivery: governed by option clause; minimum additional time 30 days
Quality/Testing: installation and commissioning included; compliance with color and quantity directives
Quantity variation up to 25% at contracted rates
ISO 9001 certification mandatory for bidder or OEM
Non-liquidation undertaking must be uploaded with bid
OEM turnover proof required; 3-year average turnover considered
Color allocation: 2000 Green and 2000 Blue pairs; ATC may permit other colors
Adherence to ATC and corrigenda is mandatory
No explicit BOQ; scope includes delivery, installation, testing, commissioning
Not explicitly stated; payment terms to be defined in contract documentation following bid acceptance
Delivery period aligned to option clause; minimum 30 days added time if extended; time starts from last delivery order date
Not specified in provided terms; penalties, if any, to be defined in contract
Must not be under liquidation or similar proceedings
OEM must meet turnover criteria as per bid document
Must hold ISO 9001 certification (bidder or OEM)
Urban Development And Housing Department
GOPALGANJ, BIHAR
Rural Development Department
EAST CHAMPARAN, BIHAR
Urban Development And Housing Department
JAMUI, BIHAR
Rural Development Department
WEST CHAMPARAN, BIHAR
Ministry Of Panchayati Raj
SARAN, BIHAR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements or CA certificate showing OEM turnover for last 3 years
ISO 9001 certificate (bidder or OEM)
Undertaking not to be under liquidation or similar proceedings
OEM authorization letter (if applicable)
Color specification compliance statement for Green/Blue 2000 pairs
Any other certificates referenced in bid document/ATC
Key insights about BIHAR tender market
Bidders must submit ISO 9001 certification, OEM turnover proof for last 3 years, GST and PAN, and an undertaking not to be liquidated. The bid includes Supply, Installation, Testing and Commissioning with a 25% quantity flex. Ensure ATC colors Green/Blue (2000 each) and comply with all corrigenda.
Required documents include GST certificate, PAN, audited financial statements or CA certificate for OEM turnover, ISO 9001 certificate, non-liquidation undertaking, OEM authorization if applicable, color compliance statement for Green/Blue pairs, and any certificates cited in ATC/Corrigendum.
The ATC specifies 2000 Green and 2000 Blue pairs; other colors may be permitted only as per the ATC. Ensure color compliance as part of technical bid and provide color certification if required.
The purchaser may increase or decrease quantity by up to 25% at contract rates. Additional delivery time is calculated as (Increase/Original) × Original period, with a minimum of 30 days, and may extend to the original delivery period.
ISO 9001 certification is mandatory for bidders or OEMs. Non-submission results in rejection. Ensure the certificate is current and aligns with the offered product line.
Scope includes Supply, Installation, Testing, and Commissioning. Delivery timelines follow the option clause; ensure resources for on-site installation and commissioning are planned alongside procurement.
OEM must demonstrate average turnover over the last three years ending March 31 of the previous year, via audited balance sheets or CA certificate. If under 3 years, turnover is calculated from post-constitution years; bidder must upload this evidence.
Satara District Panchayats
📍 SATARA, MAHARASHTRA
Access all tender documents at no cost
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS