Bid Publish Date
14-Nov-2026, 1:35 pm
Bid End Date
24-Nov-2026, 3:00 pm
EMD
₹26,000
Progress
The Indian Army, Department of Military Affairs, is tendering for multiple sanitary and water management components including Copper alloy Taps/Stop Valves conforming to IS 8931 (Q3), Cast Copper Alloy Screw Down Bib Taps and Stop Valves for Water Services conforming to IS 781 (Q3), Rotational Moulded Polyethylene Water Storage Tanks conforming to IS 12701 (Q3), Stainless Steel Sinks for Domestic Purposes per IS 13983 (Q2), and Hydraulically Regulated Door Closers ISI Marked to IS 3564 (Q3). The estimated value and item count are not disclosed; EMD is ₹26,000. The bidder must meet OEM turnover requirements and provide specific certificates as per terms. The scope covers supply and delivery to unspecified locations under option clauses describing quantity variations.
Copper alloy taps/stop valves conforming to IS 8931 (Q3)
Cast copper alloy screw down bib taps and stop valves conforming to IS 781 (Q3)
Rotational moulded polyethylene water storage tanks conforming to IS 12701 (Q3)
Stainless steel sinks for domestic purposes conforming to IS 13983 (Q2)
Hydraulically regulated door closers ISI marked to IS 3564 (Q3)
EMD: ₹26,000
25% quantity variation right to buyer; delivery period adjustments with minimum 30 days
Enhanced quantity flexibility up to 25% during order and currency; extended delivery terms with formula
Mandatory documentation: PAN, GSTIN, cancelled cheque, EFT mandate; turnover criteria for bidder and OEM
IS/ISI conformity and OEM-specific turnover requirements; non-compliance leads to rejection
Terms reference standard procurement payments; exact percentages and timeline to be defined in final contract.
Delivery period begins from last date of original delivery order; option-driven extensions apply with minimum 30 days.
LD/Penalty terms would be specified in contract; adherence to delivery and quality standards expected.
Three-year average turnover criterion as per bid document; CA certificate acceptable
OEM eligibility: turnover criterion for the leading primary product bid value
Submit PAN, GSTIN, bank EFT mandate, and cancelled cheque with bid
Quantity
688
Category
Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
65
OEM Avg. Turnover
52
Past Performance
30 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) , Cast Copper Alloy Screw Down Bib Taps and Stop Valves for Water Services conforming to IS 781 (Q3) , Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) , Stainless Steel Sinks for Domestic Purposes (V3) as per IS 13983 (Q2) , Hydraulically Regulated Door Closers ISI Marked to 3564 (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
2%
ePBG Duration (Months)
3
Max Delivery Days
30
Delivery Locations
3
Delivery Cities
CALCUTTA CENTRAL DIVISION
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | CALCUTTA CENTRAL DIVISION | CALCUTTA CENTRAL DIVISION | - | - | 50 | 30 | - |
| - | CALCUTTA CENTRAL DIVISION | CALCUTTA CENTRAL DIVISION | - | - | 17 | 30 | - |
| - | CALCUTTA CENTRAL DIVISION | CALCUTTA CENTRAL DIVISION | - | - | 20 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
24-Nov-2026, 9:30 am
Opening Date
25-Nov-2026, 9:30 am
PAN Card
GSTIN
Cancelled Cheque
EFT Mandate certified by Bank
Audited Balance Sheets or CA/Cost Accountant turnover certificate for last 3 years
OEM authorization (where applicable)
Technical compliance certificates for IS/IS-related standards
Any other certificates requested in T&C (ATC/Corrige)
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; meet OEM turnover criteria for the offered product and provide CA/audited turnover documents for the last 3 years. Ensure IS 8931/781/12701/13983/3564 conformity where applicable and upload relevant compliance certificates.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT Mandate, audited balance sheets or CA turnover certificate for last 3 years, OEM authorizations if applicable, and IS/ISI compliance certificates for the listed product categories.
Key standards include IS 8931 for copper taps, IS 781 for screw-down taps, IS 12701 for PE water storage tanks, IS 13983 for stainless sinks, and IS 3564 for hydraulic door closers. Compliance with these standards is mandatory for tender eligibility.
Delivery terms allow up to 25% quantity variation; delivery period starts from the last date of the original order. If exercised, additional time follows a formula and minimum 30 days, with potential extension up to the original period.
EMD for this procurement is ₹26,000. Payment method details are specified in terms and conditions; bidders should prepare eligible EMD submission as per tender rules and ensure it accompanies the bid.
OEMs must show minimum average annual turnover for the last 3 years as indicated in the bid document, with CA/certified audits. If the OEM is younger than 3 years, turnover is calculated from the date of incorporation for completed financial years.
Non-submission of mandated certificates or documents risks bid rejection. Ensure all requested items—PAN, GSTIN, EFT mandate, certificates for IS standards—are uploaded with the bid to meet eligibility.
Scope covers copper alloy taps/stop valves (IS 8931), screw-down bib taps (IS 781), PE water storage tanks (IS 12701), stainless steel sinks (IS 13983), and hydraulically regulated door closers (IS 3564); verify quantities under final order and adhere to 25% variation provisions.