TIMER RELAY, OFF-DELAY 1C, 7 RANGE 0, 05. . . 100S, 24VOLT AC/DC WITH LED PART NO-3RP1540-1BB30 MAK
Advanced Weapons And Equipment India Limited
KANPUR NAGAR, UTTAR PRADESH
Bid Publish Date
14-Feb-2026, 5:52 pm
Bid End Date
24-Feb-2026, 6:00 pm
Value
₹3,94,828
Location
Progress
Quantity
90
Category
OFF DELAY TIMER 3RP1533-1AP308K, SIEMENS
Bid Type
Two Packet Bid
The procurement is issued by a Joint Venture Of Cil, NTPC, IOCL, FCIL & HFCL under the Department Of Fertilizers for a specialized electrical control package including an OFF DELAY TIMER 3RP1533-1AP308K from SIEMENS and a RISH CON? TRANSDUCER CL: 0.2 O/P 4-20mA. The estimated contract value is ₹394,828.00 with no BOQ items listed. Location is Gorakhpur, Uttar Pradesh 273001. The tender references a combined industrial procurement and references a unilateral option clause allowing up to 25% quantity variation and corresponding delivery adjustments. The absence of explicit start/end dates is noted, with a need for bidders to align to the clause-driven timeline. AATC document has been uploaded by the buyer.
This tender emphasizes a compact, high-precision control and sensing solution, potentially for fertilizer processing or plant automation, coupled with vendor-supplied control transducers. The unique differentiator is the integrated option Clause and the Siemens- branded timer coupled with a 4-20mA transducer interface, requiring compatibility with IS- or OEM-grade control networks and field instrumentation.
Product/service names: OFF DELAY TIMER 3RP1533-1AP308K (SIEMENS) and RISH CON? TRANSDUCER CL: 0.2 O/P 4-20mA
Quantities: not specified in BOQ; total items listed: 0
Estimated value: ₹394,828.00
Standards/certifications: not specified in tender data
Delivery/installation: governed by option clause; delivery period adjustments via formula
Experience: not specified
Warranty/AMC: not specified
Option clause permits ±25% quantity variation at contract and during currency
Delivery period adjustments follow a defined formula with a 30-day minimum
ATC document uploaded; bidders must review buyer-supplied terms
Not specified in data; bidders should consult ATC for payment milestones and schedule
Delivery period starts from last date of original delivery order; extended time scales with additional quantity as per formula
Not specified in provided text; verify in ATC
Must review ATC document uploaded by Buyer
Submit typical procurement documents per T&C (GST, PAN, etc. via ATC)
Demonstrate capability to supply Siemens timer and 4-20mA transducer interfaces
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
OFF DELAY TIMER 3RP1533-1AP308K, SIEMENS , RISH CON? I TRANSDUCER CL: 0.2 O/P 4-20mA , RISH CON? P TRANSDUCER CL: 0.2 O/P 4-20mA
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Advanced Weapons And Equipment India Limited
KANPUR NAGAR, UTTAR PRADESH
Advanced Weapons And Equipment India Limited
Nlc India Limited
CUDDALORE, TAMIL NADU
Salem Steel Plant
Nuclear Power Corporation Of India Limited
CHITTORGARH, RAJASTHAN
Tender Results
Loading results...
Experience Criteria
Past Performance
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ALCOM CONTROLGEAR Under PMA | Make : SIEMENS Model : 3RP1533-1AP308K Title : OFF DELAY TIMER 3RP1533-1AP308K, SIEMENS | 21-02-2026 11:06:50 | |
| 2 | ALTIUM TECHNICAL CONSULTANCY LLP Under PMA | Make : SIEMENS Model : Siemens 3RP1533-1AP30-8K Title : OFF DELAY TIMER 3RP1533-1AP308K, SIEMENS | 23-02-2026 10:57:05 | |
| 3 | INDUSTRIAL ASSOCIATES Under PMA | Make : ANY REPUTED BRAND Model : ON DELAY TIMER Title : OFF DELAY TIMER 3RP1533-1AP308K, SIEMENS | 24-02-2026 17:10:07 | |
| 4 | M.K. ELECTRIC COMPANY Under PMA | Make : SIEMENS Model : 3RP1533-1AP308K Title : OFF DELAY TIMER 3RP1533-1AP308K, SIEMENS | 20-02-2026 11:25:36 | |
| 5 | SAHAKAR AGENCIES Under PMA | Make : SIEMENS Model : 3RP1533-1AP30-8K Title : OFF DELAY TIMER 3RP1533-1AP308K, SIEMENS | 19-02-2026 15:19:37 | |
| 6 | TECHSURE SALES Under PMA | Make : A E AUTOMATIC Model : AE TRANSDUCER Title : RISH CON‐ I TRANSDUCER CL: 0.2 O/P 4-20mA | 18-02-2026 16:29:45 | |
| 7 | TULSI PUMPS AND POWER PRIVATE LIMITED Under PMA | Make : NA Model : NA Title : RISH CON‐ I TRANSDUCER CL: 0.2 O/P 4-20mA | 24-02-2026 17:33:12 |
Key insights about UTTAR PRADESH tender market
Bidders should access the ATC document uploaded by the buyer, submit typical bid documents (GST certificate, PAN, experience certs, financials), and ensure compliance with the option clause allowing ±25% quantity variation. Review delivery formulas and any site-specific conditions to prepare the technical proposal and commercial bid.
Required documents typically include GST registration, PAN card, company financial statements, experience certificates for similar control equipment, EMD submission proof, OEM authorizations for Siemens hardware, and technical compliance certificates. Verify exact list in the ATC to avoid disqualification.
Estimated contract value is ₹394,828.00. Scope includes an OFF DELAY TIMER 3RP1533-1AP308K and a RISH CON? TRANSDUCER CL: 0.2 O/P 4-20mA interface; no BOQ items are listed, so suppliers should align offers to the stated components and interface requirements.
Delivery starts from the last date of the original delivery order. If quantity increases, the additional time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days. The purchaser may extend to the original delivery period under option exercise.
The tender data does not specify exact standards. Bidders should rely on OEM requirements, Siemens product compatibility, and any IS/IEC certifications indicated in the ATC. Confirm with the buyer during bid submission for any mandatory conformity assessments.
Payment terms are not detailed in the provided data. Bidders must consult the ATC for milestone payments, possible advance, and post-delivery settlement timelines. Ensure readiness of financial documents and bank guarantees as per ATC requirements.
The purchaser may increase or decrease the ordered quantity by up to 25% at contract placement and during the contract period. Bidders should price flexibility into unit costs and verify the extended delivery calculations, ensuring readiness to fulfill adjusted quantities within contracted rates.
Delivery is contingent on the last delivery order date and the option clause. The package includes an OFF DELAY TIMER 3RP1533-1AP308K and a 4-20mA transducer interface; confirm packaging, freight terms, and site installation responsibilities in the ATC to avoid shipment delays.
Neyveli Uttar Pradesh Power Limited
📍 KANPUR DEHAT, UTTAR PRADESH
Eastern Coalfields Limited
📍 BARDHAMAN, WEST BENGAL
Nmdc Limited
📍 DANTEWADA, CHHATTISGARH
Border Road Organisation
📍 UPPER SIANG, ARUNACHAL PRADESH
📍 BARDHAMAN, WEST BENGAL
Sign up now to access all documents
Main Document
BOQ
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS