TenderDekho Logo
GEM

Indian Army LV7 Components Tender Amritsar Punjab 2026 - LV7 T815 Pumps, Beacons, Feedback Valves as per ATC 2026

Bid Publish Date

17-Feb-2026, 9:29 pm

Bid End Date

28-Feb-2026, 9:00 am

Progress

Issue17-Feb-2026, 9:29 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

14

Category

LV7 STLN CROSS ASSY

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirements: LV7 cross assemblies and LV2 ICVS components specified by Indian Army ATC
  • Technical standards: No explicit standards listed in the data; confirm IS/ISO compliance for LV7 components
  • Special clauses: Option to adjust quantity by ±25% during contract and extended period; minimum 30 days additional time
  • Eligibility: Three-year turnover data required with audited statements or CA certificate; past project experience documents accepted
  • Warranty/AMC: Not specified in data; verify in final terms and ATC
  • Penalty/Performance: Acceptance/rejection rights reserved; LD terms to be clarified in bid documents
  • Delivery/Installation: Delivery timeline tied to original delivery period; extension governed by option clause

Categories 21

Tender Overview

The opportunity stems from the Indian Army, Department Of Military Affairs, for multiple LV7 and LV1/2 components, with procurement located in AMRITSAR, PUNJAB. The scope references items including LV7 STLN CROSS ASSY, LV7 T815 FUEL FEED PUMP, LV7 T815 SPEEDOMETER, LV7 T815 BEACON ORANGE, LV1 R72 OIL PRIMING PUMP, LV2 ICVS ELECTRO PNEMATIC VALVE, LV2 ICVS COCK, and LV2 ICVS AUTOMATIC PRESSURE REGULATOR. No explicit quantity, estimated value, or product category is provided in the BOQ. The Buyer’s ATC imposes quantity variation up to 25% during contract execution and requires pre-sample submission by the bid deadline. The tender includes turnover and past experience criteria to be demonstrated via audited statements or CA certifications. A sample submission before the bid closing date is mandatory, and the purchaser reserves rights to accept or reject material based on ATC clauses.

This tender emphasizes compliance with unit-specific cross assemblies and auxiliary components, with emphasis on field readiness, compatibility with LV7 and LV2 modules, and adherence to extended delivery and acceptance terms. Bidders should prepare capability documentation, sample readiness, and a proven supply history for similar defence assemblies.

Technical Specifications & Requirements

  • Organization: Indian Army (Department of Military Affairs) for AMRITSAR, Punjab
  • Product scope: LV7 CROSS ASSEMBLY variants, LV7 T815 FUEL FEED PUMP, LV7 SPEEDOMETER, LV7 BEACON ORANGE, LV1 R72 OIL PRIMING PUMP, LV2 ICVS ELECTRO PNEMATIC VALVE, LV2 ICVS COCK**, LV2 ICVS AUTOMATIC PRESSURE REGULATOR
  • BOQ status: 8 total items, but no explicit quantities provided; suggests multiple line items and sub-assemblies
  • Delivery/ATC: Option clause allowing ±25% quantity variation; delivery window based on original delivery period with adjustments; minimum 30 days for additional time
  • Submission requirement: Sample must be submitted before bid deadline; bid may be rejected if sample is not provided or not accepted
  • Experience/Turnover: Turnover and past project experience must be demonstrated via audited statements or CA certificate; three-year turnover data required
  • Compliance: No explicit standards listed in the data; bidders should confirm ISI/IS standards if applicable to LV7 components or IS/ISO quality regimes
  • Documentation: Proof of past performance, contract invoices, execution certificates, or third-party release notes acceptable as evidence
  • ATC interplay: Terms indicate acceptance/rejection discretion by purchaser and potential price/quantity adjustments

Terms, Conditions & Eligibility

  • EMD/Security: Not specified in the data; bidders should review final bid documentation for EMD requirements
  • Turnover criteria: Minimum average annual turnover over the last 3 financial years; evidence via audited balance sheets or CA certificate
  • Past experience proof: Either contract copies with invoices and bidder self-certification, or client execution certificates, or equivalent documents
  • Sample submission: Mandatory to submit a sample before the last date of bid submission
  • Price/quantity variation: Purchaser may increase/decrease quantity by up to 25% during contract/extended period
  • Delivery timing: Delivery period aligned to original order dates; extension timing follows the option clause calculation
  • Payment terms: Not explicitly stated in the data; refer to final bid terms for payment schedule and milestones
  • Acceptance criteria: Purchaser reserves right to accept or reject material based on ATC clauses and sample evaluation

Key Specifications

  • LV7 CROSS ASSEMBLY and LV7 T815 FUEL FEED PUMP

  • LV7 T815 SPEEDOMETER and LV7 BEACON ORANGE

  • LV1 R72 OIL PRIMING PUMP

  • LV2 ICVS ELECTRO PNEMATIC VALVE and LV2 ICVS COCK

  • LV2 ICVS AUTOMATIC PRESSURE REGULATOR

  • 8 total items indicated; specific quantities not disclosed

Terms & Conditions

  • Quantity variation up to 25% during contract execution

  • Three-year turnover requirement with audited statements or CA certificate

  • Mandatory pre-submission of a sample; bid may be rejected if sample not provided

Important Clauses

Payment Terms

Payment terms not detailed in data; refer to final bid terms for milestones and schedule

Delivery Schedule

Delivery period begins from last date of original delivery order; additional time via option clause with minimum 30 days

Penalties/Liquidated Damages

ATC indicates purchaser reserve rights to accept/reject material; penalties if terms not met to be specified in final contract

Bidder Eligibility

  • Demonstrable turnover of three financial years; audited balance sheets or CA certificate

  • Past experience with contracts for LV7 or LV2 components; proof via invoices or execution certificates

  • Ability to submit a sample prior to bid deadline and comply with ATC quantity variation terms

Documents 4

GeM-Bidding-9002399.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

LV7 T815 FUEL FEED PUMP,LV7 T815 FUEL FEED ASSY,LV7 T815 AIR DRYER,LV7 T815 AIR PRESSURE GOVERNOR,L

Indian Army

Posted: 16 November 2024
Closed: 7 December 2024
GEM

Indian Army LV7 LV6 components procurement Amritsar Punjab 2025 - ISI/AAA/TRTL standards and 3-year turnover

Indian Army

AMRITSAR, PUNJAB

Posted: 23 November 2025
Closed: 3 December 2025
GEM

LV7 T815 MAIN BRAKE VALVE,LV7 T815 FUEL MOTOR,LV7 MG PUMP ASSY OIL,LV7 T815 VOLTMETER,LV7 TATA PRES

Indian Army

AMRITSAR, PUNJAB

Posted: 26 April 2025
Closed: 17 May 2025
GEM

LV7 T815 CLUTCH PLATE,LV7 T815 REVOLUTION COUNTER,LV7 T815 BECON ORANGE,LV7 TATA DOOR REGULATOR,LV7

Indian Army

AMRITSAR, PUNJAB

Posted: 1 October 2025
Closed: 16 October 2025
GEM

Indian Army LV7 Components Tender Amritsar Punjab 2026 LV7 Parts Specifications and Eligibility

Indian Army

AMRITSAR, PUNJAB

Posted: 25 January 2026
Closed: 5 February 2026
GEM

Bill of Quantities (BOQ) 8 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 LV7 STLN CROSS ASSY LV7 STLN CROSS ASSY 2 nos wkspoc6023 30
2 LV7 T815 FUEL FEED PUMP LV7 T815 FUEL FEED PUMP 2 nos wkspoc6023 30
3 LV7 T815 SPEEDOMETER LV7 T815 SPEEDOMETER 1 nos wkspoc6023 30
4 LV7 T815 BEACON ORANGE LV7 T815 BEACON ORANGE 4 nos wkspoc6023 30
5 LV1 R72 OIL PRIMING PUMP LV1 R72 OIL PRIMING PUMP 1 nos wkspoc6023 30
6 LV2 ICVS ELECTRO PNEMATIC VALVE LV2 ICVS ELECTRO PNEMATIC VALVE 1 nos wkspoc6023 30
7 LV2 ICVS COCK LV2 ICVS COCK 2 nos wkspoc6023 30
8 LV2 ICVS AUTOMATIC PRESSURE REGULATOR LV2 ICVS AUTOMATIC PRESSURE REGULATOR 1 nos wkspoc6023 30

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited balance sheets or CA certificate indicating three-year turnover

4

Past project experience proofs (contract copies, invoices, execution certificates, or third-party notes)

5

Sample submission prior to bid submission deadline

6

Any OEM authorization documents if applicable

7

Technical bid documents and compliance certificates (if required in final terms)

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for Indian Army LV7 components tender in Amritsar?

Bidders must submit the required documents listed in the terms and conditions, including turnover proofs, past experience proofs, and a mandatory sample before the submission deadline. Ensure compliance with the option clause for quantity adjustments up to 25% and confirm delivery timelines aligned to the original order dates.

What documents are required for LV7 cross assemblies procurement in Amritsar?

Required documents include GST certificate, PAN card, three-year turnover proof via audited statements or CA certificate, past project experience proofs (contract copies or execution certificates), OEM authorizations if applicable, and the mandatory sample submission before the bid deadline.

What are the delivery terms for the LV7 components tender in Punjab?

Delivery begins from the last date of the original delivery order; the option clause allows quantity variation up to 25% and may extend delivery time with a minimum 30 days for the added quantity; extension follows calculated timings as specified.

What equipment categories are included in the Amritsar LV7 tender?

Categories include LV7 CROSS ASSEMBLY, LV7 T815 FUEL FEED PUMP, LV7 T815 SPEEDOMETER, LV7 T815 BEACON ORANGE, LV1 R72 OIL PRIMING PUMP, LV2 ICVS ELECTRO PNEMATIC VALVE, LV2 ICVS COCK, and LV2 ICVS AUTOMATIC PRESSURE REGULATOR.

What is the evidence required for past project experience?

Acceptable proofs are contract copies with invoices and bidder self-certification, client execution certificates with contract value, or third-party notes. The evidence should relate to similar LV7/ICVS component contracts and demonstrate successful delivery.

Are there specified standards or certifications for this Army tender in Amritsar?

The tender data does not specify explicit standards; bidders should verify IS/ISO or defence-specific standards in the final terms and ensure compliance for LV7 and LV2 components through OEM or supplier certifications before submission.

When is the sample submission deadline for the Amritsar tender?

A sample must be submitted before the last date of bid submission. Exact date and submission method are defined in the final tender documents; ensure the sample corresponds to LV7 and LV2 components and is representative of the proposed lot.

What happens if quantity is increased during contract execution?

The purchaser may increase quantity up to 25% of the contracted quantity and could adjust delivery timelines accordingly, with minimum 30 days added for the extended quantity; acceptance of the increased quantity depends on meeting original contract rates and ATC terms.