TenderDekho Logo
GEM

Invitation to Bid - SWITCH FUSE UNIT, 400 AMP TPN SURFACE MOUNTED WITH 3 POLE AND NUTRAL, ENCLOSURE CRAC SHEET 2 MM in THANE, MAHARASHTRA

Bid Publish Date

05-Feb-2026, 5:22 pm

Bid End Date

26-Feb-2026, 6:00 pm

Progress

Issue05-Feb-2026, 5:22 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5

Bid Type

Two Packet Bid

Yantra India Limited invites bids for SWITCH FUSE UNIT, 400 AMP TPN SURFACE MOUNTED WITH 3 POLE AND NUTRAL, ENCLOSURE CRAC SHEET 2 MM in THANE, MAHARASHTRA. Quantity: 5. Submission Deadline: 26-02-2026 18: 00: 00. Submit your proposal before the deadline.

Documents 4

GeM-Bidding-8939388.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Department Of Military Affairs LED and Electrical Materials Tender 2026-IS Specifications

Indian Army

IMPHAL WEST, MANIPUR

Posted: 3 January 2026
Closed: 13 January 2026
GEM

Air Cleaner Boot,Engine Oil Filter,Rear Side Mirror,Ignition Switch,Tail Light Assy,Fuse 400 Amp,Le

Indo Tibetan Border Police (itbp)

DEHRADUN, UTTARAKHAND

Posted: 13 December 2025
Closed: 3 January 2026
GEM

PVC Insulation Tape,Pendant Holder,Switch 5 A,Socket 5 Pin 5 Amp,Switch 15 Amp,Socket 6 Pin 15 Amp,

Northern Farm Machinery Training & Testing Institute Hissar

Posted: 2 December 2025
Closed: 23 December 2025
GEM

G I Street Light Pole,3 Core Copper single strand Armoured UG Cable,Single Core Copper Multi Strand

Directorate General Of Lighthouses And Lightships

PURI, ODISHA

Posted: 2 December 2025
Closed: 23 December 2025
GEM

Split AC 1.5 Ton,Wall mounted 5 KVA stabilizer,Sheet Metal enclosure qith a two pin and earth plug

Indian Army

MATHURA, UTTAR PRADESH

Posted: 28 November 2025
Closed: 8 December 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Bidder Turnover

2

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer