TenderDekho Logo
Closed GEM

Contract Bidding Open For Timing case housing,Water temperature sensor,Oil separator assy,Radiator hose bottom lower,Radiator in UDHAMPUR, JAMMU & KASHMIR

Bid Publish Date

19-Jun-2025, 1:22 pm

Bid End Date

10-Jul-2025, 2:00 pm

Progress

Issue19-Jun-2025, 1:22 pm
Technical26-06-2025 13:59:45
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

33

Category

Timing case housing

Bid Type

Two Packet Bid

Categories 32

A tender has been published for Indian Army Timing case housing, Water temperature sensor, Oil separator assy, Radiator hose bottom lower, Radiator hose top, Hose, hose inter cooler to adaptor, Hose metal pipe to pressure sensor, Spring bearing, Sealing ring for injector, Flexible hose in UDHAMPUR, JAMMU & KASHMIR. Quantity: 33 by. Submission Deadline: 10-07-2025 14: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Timing case housing , Water temperature sensor , Oil separator assy , Radiator hose bottom lower , Radiator hose top , Hose , hose inter cooler to adaptor , Hose metal pipe to pressure sensor , Spring bearing , Sealing ring for injector , Flexible hose

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7986339.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

Timing case housing

Timing case housing

1 pieces Delivery: 15 days
#2

Water temperature sensor

Water temperature sensor

1 pieces Delivery: 15 days
#3

Oil separator assy

Oil separator assy

1 pieces Delivery: 15 days
#4

Radiator hose bottom lower

Radiator hose bottom lower

2 pieces Delivery: 15 days
#5

Radiator hose top

Radiator hose top

2 pieces Delivery: 15 days
#6

Hose

Hose

3 pieces Delivery: 15 days
#7

hose inter cooler to adaptor

hose inter cooler to adaptor

3 pieces Delivery: 15 days
#8

Hose metal pipe to pressure sensor

Hose metal pipe to pressure sensor

3 pieces Delivery: 15 days
#9

Spring bearing

Spring bearing

5 pieces Delivery: 15 days
#10

Sealing ring for injector

Sealing ring for injector

10 pieces Delivery: 15 days
#11

Flexible hose

Flexible hose

2 pieces Delivery: 15 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
SARV SHAKTI SALES   Under PMA
-26-06-2025 13:59:45
2
Satyanand Enterprises   Under PMA
-05-07-2025 10:26:51
3
SEHYOG MOTORS   Under PMA
-03-07-2025 12:59:07

Financial Results

Rank Seller Price Item
L1
SARV SHAKTI SALES(MSE)( MSE Social Category:General )    Under PMA
Item Categories : Timing case housing,Water temperature sensor,Oil separator assy,Radiator hose bottom lower,Radiator
L2
SEHYOG MOTORS   Under PMA
Item Categories : Timing case housing,Water temperature sensor,Oil separator assy,Radiator hose bottom lower,Radiator
L3
Satyanand Enterprises (MSE)( MSE Social Category:General )    Under PMA
Item Categories : Timing case housing,Water temperature sensor,Oil separator assy,Radiator hose bottom lower,Radiator

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

What are the eligibility requirements for GEM/2025/B/6361889?

The eligibility requirements necessitate that bidders must be registered entities with all relevant certifications. Furthermore, they should have observable experience in supplying military-grade components. Complying with local industry standards and maintaining quality assurance through recognized certifications is crucial for participation in this tender.

What technical specifications must be met for the Timing Case Housing tender?

In this tender, the technical specifications require all components to adhere to military-grade quality standards. Suppliers must provide detailed documentation demonstrating compliance with technical norms, including certifications and testing results that validate the performance and durability of the products supplied.

What are the payment terms associated with GEM/2025/B/6361889?

The payment terms will be outlined in the final contract following the award of the tender. Typically, payment may be structured upon successful delivery, subject to compliance verification of received goods with the specified quality standards. Detailed invoicing protocols will be discussed during the contract negotiation phase.

How will bids be evaluated for the Timing Case Housing tender?

The evaluation process for bids will focus on both technical and financial compliance. Bids will be assessed based on adherence to eligibility criteria, product specifications, performance metrics, and overall pricing. A transparent and fair assessment process will ensure the selection of the most qualified suppliers.

Are there any benefits for Micro, Small, and Medium Enterprises (MSEs) in this tender?

Yes, the Timing Case Housing tender includes specific provisions that facilitate participation from Micro, Small, and Medium Enterprises (MSEs). These benefits promote local manufacturing and support small businesses in entering the defense procurement market, in alignment with the government’s ‘Make in India’ initiative.