Progress
Bharat Electronics Limited invites bids for ISI 1391 Part 2 (V3) compliant wall-mount split air conditioners, to be supplied to BEL locations in Hyderabad, Telangana. The procurement emphasizes adherence to BEL specifications, non-China sourced components, and a 66‑month performance bank guarantee lifecycle. The commercial terms allocate 80% payment on delivery and acceptance, 10% on PBG submission, and the remaining 10% after installation/commissioning (within 12 months or at acceptance, whichever is earlier). The winner is the technically qualified L1 bidder based on landed cost including GST. A 5‑year warranty is mandatory from final acceptance. A PBG lasting 66 months from delivery is required. Unique risk controls include counterfeit prevention and recall handling by BEL/GeM. The scope targets government-grade reliability with strict compliance reporting and data-sheet alignment.
Product/Category: Wall-mount split air conditioner
Standard: ISI 1391 Part 2 (V3) compliance
Origin: Not China-made; BEL-specified origin preferred
Warranty: 5 years from final acceptance/installation testing
PBG: 66 months from date of delivery
Payment terms: 80% on delivery/acceptance, 10% on PBG submission, 10% after installation/12 months acceptance
Documentation: Upload OEM authorization and data sheet; ensure parameter match
PBG duration: 66 months from delivery
80% payment upon delivery and acceptance
No China-made products allowed; strict compliance with BEL specs
80% of PO value payable within 30 days of delivery and acceptance; 10% on submission of PBG; remaining 10% on completion of installation and acceptance within 12 months.
Delivery and installation must occur at BEL sites with timely commissioning; non-compliance triggers LD up to 10% of material value (0.5% per week).
Delay LD: 0.5% of material value per week, capped at 10% of value.
Not under liquidation, court receivership, or bankruptcy
Experience in supply of ISI/IS 1391 compliant ACs
Financial capability to support PBG and warranty commitments
Quantity
30
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
5 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
66
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
84
Delivery Locations
1
Delivery Cities
Hyderabad
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Hyderabad | Hyderabad | - | - | 30 | 84 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar ISI 1391 Part 2 compliant AC supply
Financial statements or turnover proof
EMD/Security deposit documents
Technical compliance certificates
OEM authorizations or authorized distributor certificates
Data Sheet of offered AC model
Compliance to Technical Specification Document (signed and stamped)
Key insights about TELANGANA tender market
To bid, submit GST and PAN, provide OEM authorization, upload Data Sheet of the offered AC model, and ensure compliance with ISI 1391 Part 2 (V3). Include 5-year warranty proof and PBG for 66 months; ensure no China-made components. Ensure compliance with BEL ATC and terms.
Required documents include GST certificate, PAN, experience certificates for similar supply, financial statements, EMD/PBG documents, OEM authorization, Data Sheet of the proposed model, and signed Compliance to Technical Specification Document indicating adherence to BEL specs.
Payment terms specify 80% payment on delivery and acceptance, 10% on submission of PBG, and the remaining 10% after installation/within 12 months of acceptance. Ensure timely documentation and site acceptance to minimize payment delays.
Bidders must provide ISI 1391 Part 2 (V3) compliant ACs with BEL-specified warranty of 5 years from final acceptance or completion of installation/testing, whichever is later. Ensure OEM certification and data sheet alignment with standard parameters.
L1 is determined on landed cost including GST. The technically qualified L1 bidder will receive the purchase order for the entire scope of supply, with lowest total value and proper compliance to BEL specified terms and conditions.
If items are counterfeit or fail verification, BEL will initiate GeM portal actions. Defective items must be replaced within 1 month; a recall may be triggered, and supplier liable for remedial costs related to counterfeit provisions.
The Performance Bank Guarantee must be valid for 66 months from the date of delivery and paid as part of the bid submission process, ensuring coverage during warranty and post-installation support as per BEL terms.