TenderDekho Logo
Closed GEM

Government Tender Published for Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 24,Silicone Liner With Pin AK 3mmx4 in PANCHKULA, HARYANA

Bid Publish Date

20-Jan-2026, 12:02 pm

Bid End Date

10-Feb-2026, 1:00 pm

EMD

₹4

Generate Docs

Progress

RA
Issue20-Jan-2026, 12:02 pm
Reverse Auction21-Apr-2026, 11:00 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

4851

Category

Chopart foot plate size 26 Lt activity level 3 and 4 with foot shell

Bid Type

Two Packet Bid

Categories 31

A tender has been published for Indian Army Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 24, Silicone Liner With Pin AK 3mmx4 in PANCHKULA, HARYANA. Quantity: 4851 by. Submission Deadline: 10-02-2026 13: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8832501.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 87 Items Sign in for GEM prices

#1

Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 24

As per uploaded file

2 no Delivery: 28 days
#2

Silicone Liner With Pin AK 3mmx42cm

As per uploaded file

2 no Delivery: 28 days
#3

Silicone Liner With Pin AK 3mmx40cm

As per uploaded file

2 no Delivery: 28 days
#4

Silicone Liner With Pin AK 3mmx38cm

As per uploaded file

2 no Delivery: 28 days
#5

Prosthesis Articulated Energy Storing Foot Activity 3 Left Size 25

As per uploaded file

4 no Delivery: 28 days
#6

Prosthesis Articulated Energy Storing Foot Activity 3 Left Size 26

As per uploaded file

4 no Delivery: 28 days
#7

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core Plastic Keel with Foot Shell Size 24 Rt

As per uploaded file

3 no Delivery: 28 days
#8

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core obq Plastic Keel with Foot Shell Size 28 Rt

As per uploaded file

3 no Delivery: 28 days
#9

BK Belt PTB belt Rt

As per uploaded file

45 no Delivery: 28 days
#10

Prosthesis Articulated Energy Storing Foot Activity 2 right Size 24

As per uploaded file

3 no Delivery: 28 days
#11

Stump Socks AK Size XL

As per uploaded file

45 no Delivery: 28 days
#12

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core obq Plastic Keel with Foot Shell size 28 Lt

As per uploaded file

2 no Delivery: 28 days
#13

Prosthesis Articulated Energy Storing Foot Activity 3 Left Size 24

As per uploaded file

2 no Delivery: 28 days
#14

Prosthesis Articulated Energy Storing Foot Activity 3 Right Size 24

As per uploaded file

3 no Delivery: 28 days
#15

Prosthesis Articulated Energy Storing Foot Activity 2 Left Size 26

As per uploaded file

3 no Delivery: 28 days
#16

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core obq Plastic Keel with Foot Shell size 26 Lt

As per uploaded file

3 no Delivery: 28 days
#17

JBR Rubber Sole 1 mtr x1mtr

As per uploaded file

6 sheet Delivery: 28 days
#18

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core obq Plastic Keel with Foot Shell size 27 Lt

As per uploaded file

3 no Delivery: 28 days
#19

Prosthesis Articulated Energy Storing Foot Activity 2 Right Size 25

As per uploaded file

6 no Delivery: 28 days
#20

Prosthesis Articulated Energy Storing Foot Activity 2 Right Size 27

As per uploaded file

6 no Delivery: 28 days
#21

MCR Rubber Sole 1 mtr x1mtr

As per uploaded file

6 sheet Delivery: 28 days
#22

Suspension Sleeve AK Lt Size Med

As per uploaded file

9 no Delivery: 28 days
#23

Suspension Sleeve AK Rt Size Med

As per uploaded file

9 no Delivery: 28 days
#24

Pedding Sheet

As per uploaded file

30 sheet Delivery: 28 days
#25

Double Face PVC Tape

As per uploaded file

10 roll Delivery: 28 days
#26

Suspension Sleeve AK Rt Size Large

As per uploaded file

9 no Delivery: 28 days
#27

thinner

As per uploaded file

10 ltr Delivery: 28 days
#28

Stump Socks BK Size L

As per uploaded file

45 no Delivery: 28 days
#29

Pedilin caucasian 6 mm

As per uploaded file

20 sheet Delivery: 28 days
#30

stump socks symes length 18 Size M

As per uploaded file

18 no Delivery: 28 days
#31

Synthetic Rubber Adhesive Fevicol

As per uploaded file

20 ltr Delivery: 28 days
#32

Stump Socks BK Size M

As per uploaded file

35 no Delivery: 28 days
#33

4 Pronged pyramid Adaptor BK

As per uploaded file

30 no Delivery: 28 days
#34

Stump Socks AK Size L

As per uploaded file

30 no Delivery: 28 days
#35

Stump Socks AK Size M

As per uploaded file

30 no Delivery: 28 days
#36

Tape Insulation Plastic

As per uploaded file

50 roll Delivery: 28 days
#37

Tube Clamp Adapter

As per uploaded file

50 no Delivery: 28 days
#38

sach foot adaptor

As per uploaded file

50 no Delivery: 28 days
#39

BK Cosmetic Stockings

As per uploaded file

60 no Delivery: 28 days
#40

White plaster of paris powder

As per uploaded file

300 kg Delivery: 28 days
#41

Pigment Paste Caucasian Skin Colour

As per uploaded file

1,500 gm Delivery: 28 days
#42

Feviquick 20ml

As per uploaded file

6 no Delivery: 28 days
#43

Silicone Liner With Pin BK Medium 3mmx26.5 cm

As per uploaded file

6 no Delivery: 28 days
#44

Silicone Liner With Pin BK Medium 3mmx25cm

As per uploaded file

6 no Delivery: 28 days
#45

Silicone Liner With Pin BK Medium 3mmx23.5cm

As per uploaded file

6 no Delivery: 28 days
#46

Stump Socks BK Size XL

As per uploaded file

45 no Delivery: 28 days
#47

Hardening powder for resin

As per uploaded file

1,800 gm Delivery: 28 days
#48

Prosthesis Articulated Energy Storing Foot Activity 3 Right Size 25

As per uploaded file

6 no Delivery: 28 days
#49

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core obq Plastic Keel with Foot Shell size 27 Rt

As per uploaded file

6 no Delivery: 28 days
#50

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core obq Plastic Keel with Foot Shell Size 25 Lt

As per uploaded file

4 no Delivery: 28 days
#51

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core obq Plastic Keel with Foot Shell Size 25 Rt

As per uploaded file

6 no Delivery: 28 days
#52

Prosthesis Basic Foot with Solid Ankle and Cushion Heel Carbon Composite Core obq Plastic Keel with Foot Shell Size 26 Rt

As per uploaded file

6 no Delivery: 28 days
#53

PVC Kling Film

As per uploaded file

30 roll Delivery: 28 days
#54

Gel Socks Symes

As per uploaded file

3 no Delivery: 28 days
#55

Chopart foot plate size 26 Lt activity level 3 and 4 with foot shell

As per uploaded file

3 no Delivery: 28 days
#56

Walking stick Monopad

As per uploaded file

18 no Delivery: 28 days
#57

Metal Rectangular D rings 1 1 obq 4and 1

As per uploaded file

60 pkt Delivery: 28 days
#58

Symes Foot Molded along with adaptor LT size 10

As per uploaded file

3 no Delivery: 28 days
#59

Orthocryl Lamination Resin 80 RATIO 20 4 POINT 6 kg

As per uploaded file

27 kg Delivery: 28 days
#60

Drill Bit 3 obq 16

As per uploaded file

12 no Delivery: 28 days
#61

Plastozoate Skin Colour 6MM

As per uploaded file

18 sheet Delivery: 28 days
#62

Rubber ferrule for crutches 3 obq 4 inch

As per uploaded file

30 no Delivery: 28 days
#63

Silicone Liner With Pin AK 3mmx34cm

As per uploaded file

6 no Delivery: 28 days
#64

Silicone Liner With Pin AK 3mmx36cm

As per uploaded file

6 no Delivery: 28 days
#65

Foot Impression Foam Pad

As per uploaded file

30 no Delivery: 28 days
#66

Silicone Liner With Pin BK Medium 3mmx28cm

As per uploaded file

6 no Delivery: 28 days
#67

Silicone Liner With Pin BK Medium 3mmx30cm

As per uploaded file

6 no Delivery: 28 days
#68

stump socks symes length 18 Size L

As per uploaded file

18 no Delivery: 28 days
#69

Thermolyn Clear 12mm

As per uploaded file

18 sheet Delivery: 28 days
#70

Diabetic foot care kit

As per uploaded file

30 kit Delivery: 28 days
#71

Leather Softy Black

As per uploaded file

9 sq ft Delivery: 28 days
#72

Leather Cow Lining

As per uploaded file

9 sq ft Delivery: 28 days
#73

Double End Adapter 35 mm for Below Knee Prosthesis

As per uploaded file

6 no Delivery: 28 days
#74

French Chalk Powder

As per uploaded file

3 kg Delivery: 28 days
#75

Drill Bit 5 obq 32

As per uploaded file

18 no Delivery: 28 days
#76

Suspension Sleeves BK Medium

As per uploaded file

18 no Delivery: 28 days
#77

Suspension Sleeves BK Large

As per uploaded file

18 no Delivery: 28 days
#78

Suspension Sleeve AK Lt Size Small

As per uploaded file

9 no Delivery: 28 days
#79

Suspension Sleeve AK Lt Size Large

As per uploaded file

9 no Delivery: 28 days
#80

Nylon Gel Socks Large

As per uploaded file

18 no Delivery: 28 days
#81

Nylon Gel Socks Med

As per uploaded file

18 no Delivery: 28 days
#82

Nylon Gel Socks Small

As per uploaded file

18 no Delivery: 28 days
#83

Chopart Foot Plate Size 26 Rt Activity Level 3 with Foot shell

As per uploaded file

3 no Delivery: 28 days
#84

Carbon fibre Symes foot with foot shellsock Full length toe Heel spring Foot Wt 500gm.Build height 45mm. Heel height10mm. Max user weight

As per uploaded file

1 no Delivery: 28 days
#85

Carbon fibre Symes foot with foot shellsock. Full length toe. Heel spring. Foot Wt 500gm. Build height 45mm. Heel height10mm. Max user weight

As per uploaded file

1 no Delivery: 28 days
#86

Carbon fibre Symes foot with foot shell sock. Full length toe. Heel spring. Foot Wt 500gm. Build height 45mm. Heel height10mm. Max user weight

As per uploaded file

1 no Delivery: 28 days
#87

Carbon fibre Symes foot with foot shell sock. Full length toe. Heel spring. Foot Wt 500gm. Build height 45mm. Heel height10mm. Max user weight

As per uploaded file

1 no Delivery: 28 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

03-Feb-2026

Extended Deadline

10-Feb-2026, 1:00 pm

Opening Date

10-Feb-2026, 1:30 pm

Reverse Auction Schedule

Completed

Start

21-Apr-2026, 11:00 am

End

22-Apr-2026, 1:00 pm

Duration: 26 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-03-02-2026 11:53:20
2
**********   Under PMA
-03-02-2026 12:55:58