Solenoid Switch 12V,CE Bush,BRG Bush,Pole Screw,Combination Switch,AC Relay,Siren,Field Coil,Vane P
Indian Army
SONITPUR, ASSAM
Bid Publish Date
03-Nov-2025, 12:59 pm
Bid End Date
17-Nov-2025, 1:00 pm
Location
Progress
RAQuantity
22
The Indian Army, Department Of Military Affairs, seeks procurement of multiple vehicle components including Pole Screw, Kelly kit, Bty Cut Off Switch, Clutch Release bearing, Brake booster Kit, Steering Pump Kit, Brg Bush, C E Bush, Bush, Rocker Plate, and Armature Assembly. The BOQ lists 11 items with no quantified specs or unit measures. The tender notes an Option Clause allowing up to 25% quantity variation during contract execution, at contracted rates, with delivery timelines calculated from the original delivery order. The opportunity is positioned within a defense procurement context and requires readiness to manage variable quantities and extended delivery periods. The estimated value and EMD are not disclosed in the provided data, requiring bidders to rely on standard government procurement practices for bid preparation.
Product/service names: Pole Screw, Kelly kit, Bty Cut Off Switch, Clutch Release bearing, Brake booster Kit, Steering Pump Kit, Brg Bush, C E Bush, Bush, Rocker Plate, Armature Assembly
Quantities/values: Not disclosed; 11 items listed in BOQ with N/A quantities
Standards/certifications: Not specified; prepare for standard defense procurement compliance
Delivery: Option to increase quantity up to 25%; delivery timeline linked to original order date with minimum 30 days
Warranty/AMC: Not specified; plan for typical manufacturer warranty
OEM/Brand: Not specified; verify during bid clarification
Option clause permits quantity variation up to 25% at contracted rates
Delivery period adjustments based on formula with minimum 30 days
No explicit EMD or precise eligibility criteria in provided data
Final payment terms to be specified in the bid; bidders should expect standard government terms including advance, milestone, or post-delivery payment as per contract
Delivery timelines governed by original order date; option quantity extensions require recalculated delivery time with minimum 30 days
LD clauses not disclosed in data; bidders should prepare for typical late delivery penalties and performance bonds per defense procurement norms
Experience in supplying vehicle components or allied mechanical assemblies to defense/government entities
Demonstrated financial stability (financial statements for past 2-3 years)
GST registration and PAN card valid; ability to comply with defense procurement requirements
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
SONITPUR, ASSAM
Indian Army
DARJEELING, WEST BENGAL
Indian Army
JAISALMER, RAJASTHAN
Indian Army
Sri Ganganagar, RAJASTHAN
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Pole Screw | Pole Screw | 4 | pieces | wkspoffr2@ | 15 |
| 2 | Kelly kit | Kelly kit | 1 | pieces | wkspoffr2@ | 15 |
| 3 | Bty Cut Off Switch | Bty Cut Off Switch | 1 | pieces | wkspoffr2@ | 15 |
| 4 | Clutch Release brg | Clutch Release brg | 1 | pieces | wkspoffr2@ | 15 |
| 5 | Brake booster Kit | Brake booster Kit | 6 | pieces | wkspoffr2@ | 15 |
| 6 | Steering Pump Kit | Steering Pump Kit | 1 | pieces | wkspoffr2@ | 15 |
| 7 | Brg Bush | Brg Bush | 2 | pieces | wkspoffr2@ | 15 |
| 8 | C E Bush | C E Bush | 2 | pieces | wkspoffr2@ | 15 |
| 9 | Bush | Bush | 2 | pieces | wkspoffr2@ | 15 |
| 10 | Rocker Plate | Rocker Plate | 1 | pieces | wkspoffr2@ | 15 |
| 11 | Armature Assy | Armature Assy | 1 | pieces | wkspoffr2@ | 15 |
GST registration certificate
PAN card
Experience certificates (defense/vehicle components preferred)
Financial statements (last 2-3 years)
EMD/Security deposit documentation (as per final bid terms)
Technical bid documents (compliance statements, OEM authorizations if applicable)
OEM authorization letters (if bidding on behalf of OEM)
Any existing product catalogs and installation/warranty statements
Extended Deadline
17-Nov-2025, 1:00 pm
Opening Date
17-Nov-2025, 1:30 pm
Start
19-Nov-2025, 10:00 am
End
20-Nov-2025, 10:00 am
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | SAMRIDDHI ENTERPRISES(MSE) Under PMA Winner | ₹10,043 | Item Categories : Pole Screw,Kelly kit,Bty Cut Off Switch,Clutch Release brg,Brake booster Kit,Steering Pump Kit,Brg |
| L2 | VR MARKETING (MSE) Under PMA | ₹10,055 | Item Categories : Pole Screw,Kelly kit,Bty Cut Off Switch,Clutch Release brg,Brake booster Kit,Steering Pump Kit,Brg |
| L3 | KAVYA TRADERS (MSE) Under PMA | ₹10,690 | Item Categories : Pole Screw,Kelly kit,Bty Cut Off Switch,Clutch Release brg,Brake booster Kit,Steering Pump Kit,Brg |
🎉 L1 Winner
SAMRIDDHI ENTERPRISES(MSE) Under PMA
Final Price: ₹10,043
Key insights about GUJARAT tender market
Bidders should register with GEM, obtain OEM authorizations if bidding as a third party, and prepare GST, PAN, and financial statements. The tender requires an EMD and technical compliance. Since specifications are not published, submit general capability documents and be ready for final bid clarifications, including delivery timelines under the 25% option clause.
Submit GST certificate, PAN card, 2-3 years of financial statements, experience certificates in defense supply, EMD documentation, technical bid with compliance statements, and OEM authorizations if applicable. Include product catalogs and warranty information to demonstrate capability for 11 listed items.
The buyer may increase/decrease quantity up to 25% at contracted rates. Delivery period scales with increased quantity: (Increased ÷ Original) × Original days, minimum 30 days. If the base period is shorter than 30 days, the minimum applies. Extensions allowed within original delivery window.
The tender data does not specify exact standards. Bidders should anticipate defense procurement norms and prepare ISO/IS standards readiness, along with OEM certifications for Pole Screw, Kelly kit, and related components. Ensure product documentation aligns with ISI/ISO where applicable and provide compliance statements.
Delivery timelines follow the original delivery order date. For any extended quantity, compute new delivery days as (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days. The buyer may extend within the original delivery window.
The provided tender data does not disclose an EMD amount. Bidders should monitor final bid documents for exact EMD value, mode of payment (DD/online), and submission deadlines. Prepare an EMD well in advance to ensure compliance with standard defense procurement requirements.
Include OEM authorizations if bidding for OEM, product catalogs for Pole Screw, Clutch Release bearing, Armature Assembly, and related items, along with installation/warranty statements. Provide evidence of capability to supply 11 listed items and any pre-existing defense project experience to strengthen technical compliance.
Verify eligibility by confirming defense supplier experience, GST registration, PAN, and financial stability. While the tender data lacks explicit criteria, bidders should prepare standard documents and await final bid instructions detailing category-specific requirements, delivery terms, and performance obligations under the 25% option clause.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS