TenderDekho Logo
Active GEM

Directorate Of Higher Education Goa Online UPS (>10 KVA) Tender Goa 50 Hz ISI/ISO Standards 2026

Bid Publish Date

27-Oct-2026, 1:13 pm

Bid End Date

11-Dec-2026, 2:00 pm

Progress

Issue27-Oct-2026, 1:13 pm
AwardPending

Key Highlights

  • • Manufacturer's net worth must be positive per latest audited statement
  • • OEM turnover must meet minimum average annual turnover over last 3 years
  • • Bid includes SITC: Supply, Installation, Testing and Commissioning
  • • Delivery quantity can vary ±25% with extension rules linked to original delivery period

Tender Overview

The Directorate Of Higher Education, Goa, seeks an Online UPS (>10 KVA) with Battery for North Goa, with performance parameters including KVA rating, AC input/output at 50 Hz, and inbuilt isolation transformer. The scope covers supply, installation, testing and commissioning (SITC) in a Goa educational campus setting. Key differentiators include a minimum overload capacity requirement and a defined backup time specification, with mounting considerations specified. The bid emphasizes OEM turnover and net worth criteria, reflecting financial stability expectations for sustained support. The procurement location is North Goa, with a focus on reliable power-backup infrastructure for higher education institutions.

Technical Specifications & Requirements

  • Rating (KVA): specify the required capacity for online UPS units (>10 KVA).
  • Input Voltage: AC, 50 Hz.
  • Output Voltage: AC, 50 Hz.
  • Inbuilt Isolation Transformer: required feature for power isolation.
  • Minimum Overload Capacity: defined performance threshold for fault tolerance.
  • Battery Type: specify the battery chemistry (e.g., VRLA, Li-ion) and compatibility with UPS.
  • Backup Time: explicit runtime requirement under typical load.
  • Mounting Type: prescribed mounting arrangement for installation.

Terms, Conditions & Eligibility

  • EMD/Financial Criteria: OEM must have positive net worth as per last audited statement; bidder turnover and OEM turnover to be demonstrated for last three financial years; annual turnover evidence required.
  • Scope: SITC of UPS systems, including installation and commissioning.
  • Documentation: upload all certificates as per ATC/Corrigendum; maintain minimum required documents for bid validity.
  • Delivery/Option Clause: quantity may vary by ±25% during contract; delivery timelines adjusted from last order date with minimum 30 days extension; adherence to these terms is mandatory.

Key Specifications

  • Online UPS capacity: >10 KVA (as per BOQ/technical schedule)

  • Input/Output: 230V/415V AC options with 50 Hz frequency

  • Inbuilt isolation transformer: required

  • Minimum overload capacity: specified by bidder (e.g., 1.25x nominal load)

  • Battery type: specify chemistry (VRLA/Li-ion) and compatibility

  • Backup time: documented runtime at defined load percentage

  • Mounting: wall or floor mounting as per site requirement

Terms & Conditions

  • Delivery period adjustable by ±25% of bid quantity with minimum 30 days extension

  • Positive net worth required for OEM and bidder, with turnover proof

  • SITC scope inclusive of installation and commissioning

  • Mandatory certificates: ATC, Corrigendum-compliant documents

  • Annual turnover evidence from last 3 financial years required

Important Clauses

Payment Terms

Payment terms linked to SITC completion; milestones to be defined in contract; ensure compliance with procurement rules.

Delivery Schedule

Delivery starts after issuance of purchase order; ensure install readiness and site access; default extension rules apply if option clause exercised.

Penalties/Liquidated Damages

LD applicable for delays beyond agreed delivery/completion; rate to be specified in contract.

Bidder Eligibility

  • Positive net worth as per latest audited financial statement

  • Average annual turnover of bidder and OEM over last 3 years meeting minimum thresholds

  • Experience in SITC of UPS systems for educational institutions

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

2

Past Performance

20 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Online UPS (>10 KVA) With Battery (Q2)

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

North Goa

Delivery Pincodes

403521

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Bhushan Keshav Savaikar403521,Goa Education Complex, Alto-PorvorimNorth GoaGoa403521115-

Authority Records

HIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10086186.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

North Zone

Grievance Contact

[email protected]

Categories 4

Advertisement

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for last 3 years (or CA certificate indicating turnover)

4

OEM authorization certificate (if bidding on behalf of OEM)

5

Technical bid documents showing UPS capacity, battery type, backup time, and mounting details

6

Product certification or standards compliance certificates (IS/IEC as applicable)

7

Experience certificates for similar SITC deployments

8

Net worth certification with supporting statements

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Performance Parameters Rating (in KVA) 20
Performance Parameters Input Voltage (AC, 50 Hz) Three Phase, 300 V - 450V
Performance Parameters Output Voltage (AC, 50 Hz) Three Phase, 415V±1% (Variable range: 380V - 415V)
Construction Availability of Inbuilt Isolation Transformer Yes, No
Construction Minimum Overload Capacity of Online UPS 120% of Rating in KVA for 10 minutes
Battery/Backup Bank Type of Battery SMF-VRLA (Sealed Maintenance Free-Valve Regulated Lead Acid) / Stationary Lead Acid Batteries
Battery/Backup Bank Backup Time 60.0
Features Type of Mounting of Online UPS Rack Mountable, Floor Standing

Frequently Asked Questions

Key insights about GOA tender market

How to bid for UPS procurement in Goa higher education?

To bid, provide positive net worth evidence, last 3-year turnover, and OEM turnover proof. Submit SITC scope documents, battery type, backup time, and 50 Hz ISI/IEC compliance where applicable. Ensure all ATC/ corrigendum certificates are uploaded with the bid.

What documents are required for UPS tender in Goa education sector?

Required documents include GST, PAN, audited financials for 3 years, OEM authorization, technical bid for >10 KVA UPS, battery specification, installation plan, and ISI/ISO certificates as applicable; ensure net worth and turnover proofs are provided.

What are the technical standards for Online UPS in this Goa tender?

Bid must specify compliance with applicable standards; ISI certification or other relevant standards should be provided; UPS must feature inbuilt isolation transformer and meet minimum overload capacity for continuous operation.

When is the delivery deadline for Goa UPS procurement?

Delivery timing is linked to the final purchase order with a standard extension rule: a minimum 30 days extension if the option quantity is exercised; otherwise delivery should begin per PO schedule and site readiness.

What are the backup time requirements for the UPS units?

Backup time must be clearly stated for the defined load; the tender requires explicit runtime data in the technical bid to demonstrate reliability during outages.

What are the OEM turnover criteria for this Goa UPS tender?

OEMs must show minimum average annual turnover over the last 3 financial years ending March; if the OEM is <3 years old, turnover is calculated from completed years post-constitution with certified statements.

Advertisement