TenderDekho Logo
Closed GEM

Procurement Opportunity: LED street light,LED street light,LED street light,Timer Panel,power contactor,Digital time switch, in NARMADA, GUJARAT

Bid Publish Date

11-Aug-2026, 1:17 pm

Bid End Date

31-Aug-2026, 7:00 pm

Value

₹18,33,201

Progress

Issue11-Aug-2026, 1:17 pm
AwardPending

Public procurement opportunity for Sardar Sraovar Narmada Nigam Limited LED street light, Timer Panel, power contactor, Digital time switch, Modular MCB Switch, Mount Downlight, LED Panel Light, Ceiling fan, Tube Light with integral driver, LED Lamps integral type, RCCBs, exhaust fan, Foot Light, soft copper tubing, MS angle, telephone, Metal Halide lamps, HPSV MH Lamp, Switch board, remote control ac and CELL, remote control panel assembly, Shifting of Split A. C. , end termination kit, Straight through joint kit, in NARMADA, GUJARAT. Quantity: 878 issued by. Submission Deadline: 31-08-2026 19: 00: 00. View full details and respond.

Authority & Contact

Organization

Sardar Sraovar Narmada Nigam Limited

Department

Narmada Water Resources Water Supply and Kalpsar Department Gujarat

Office Name

Office Of Chief Engineer Electrical And Mechanical

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

878

Category

LED street light

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

LED street light , Timer Panel , power contactor , Digital time switch , Modular MCB Switch , Mount Downlight , LED Panel Light , Ceiling fan , Tube Light with integral driver , LED Lamps integral type , RCCBs , exhaust fan , Foot Light , soft copper tubing , MS angle , telephone , Metal Halide lamps , HPSV MH Lamp , Switch board , remote control ac and CELL , remote control panel assembly , Shifting of Split A.C. , end termination kit , Straight through joint kit,

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

30

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Narmada

Delivery Pincodes

393151

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
DIVYESHKUMAR MAHENDRABHAI PATEL393151,519, 5th Floor, New Administrative Building, SSNNL, Ekta NagarNarmadaGujarat3931512515-

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9726849.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 34 Items Sign in for GEM prices

#1

LED street light

As Per ATC

25 pieces Delivery: 15 days
#2

LED street light

As Per ATC

50 pieces Delivery: 15 days
#3

LED street light

As Per ATC

20 pieces Delivery: 15 days
#4

Timer Panel

As Per ATC

4 pieces Delivery: 15 days
#5

power contactor

As Per ATC

20 pieces Delivery: 15 days
#6

Digital time switch

As Per ATC

20 pieces Delivery: 15 days
#7

Modular MCB Switch

As Per ATC

10 pieces Delivery: 15 days
#8

Mount Downlight

As Per ATC

125 pieces Delivery: 15 days
#9

Mount Downlight

As Per ATC

175 pieces Delivery: 15 days
#10

LED Panel Light

As Per ATC

10 pieces Delivery: 15 days
#11

Ceiling fan

As Per ATC

30 pieces Delivery: 15 days
#12

Tube Light with integral driver

As Per ATC

25 pieces Delivery: 15 days
#13

Tube Light with integral driver

As Per ATC

50 pieces Delivery: 15 days
#14

LED Lamps integral type

As Per ATC

100 pieces Delivery: 15 days
#15

RCCBs

As Per ATC

10 pieces Delivery: 15 days
#16

RCCBs

As Per ATC

10 pieces Delivery: 15 days
#17

RCCBs

As Per ATC

8 pieces Delivery: 15 days
#18

exhaust fan

As Per ATC

10 pieces Delivery: 15 days
#19

Foot Light

As Per ATC

10 pieces Delivery: 15 days
#20

soft copper tubing

As Per ATC

16 rmt Delivery: 15 days
#21

MS angle

As Per ATC

2 pieces Delivery: 15 days
#22

telephone

As Per ATC

10 pieces Delivery: 15 days
#23

Metal Halide lamps

As Per ATC

10 pieces Delivery: 15 days
#24

Metal Halide lamps

As Per ATC

30 pieces Delivery: 15 days
#25

HPSV MH Lamp

As Per ATC

10 pieces Delivery: 15 days
#26

HPSV MH Lamp

As Per ATC

30 pieces Delivery: 15 days
#27

Switch board

As Per ATC

10 pieces Delivery: 15 days
#28

remote control ac and CELL

As Per ATC

4 pieces Delivery: 15 days
#29

remote control panel assembly

As Per ATC

4 pieces Delivery: 15 days
#30

Shifting of Split A.C.

As Per ATC

10 pieces Delivery: 15 days
#31

end termination kit

As Per ATC

10 pieces Delivery: 15 days
#32

Straight through joint kit,

As Per ATC

10 pieces Delivery: 15 days
#33

end termination kit

As Per ATC

5 pieces Delivery: 15 days
#34

Straight through joint kit,

As Per ATC

5 pieces Delivery: 15 days

Categories 50

Required Documents

1

Bidder Turnover

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

OEM Annual Turnover

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer