Design and const of 590 Mtr snow gallery, const of 483 Mtr snow avalanche catch dam, 100 m loose rock scaling on D-S road approach road to south portal of proposed Shinkun la tunnel under 126 RCC 13 TF of project Yojak in the state of HP through EPC
Dte General Border Roads Organisation