Bid Publish Date
14-Aug-2026, 6:15 pm
Bid End Date
05-Sep-2026, 11:00 am
EMD
₹80,374
Value
₹40,18,693
Location
Progress
Bharat Sanchar Nigam Limited Portal(bsnl), under the Department Of Telecommunications, seeks a Comprehensive Maintenance Contract (CMC)/AMC for pre-owned transformer substations of two ratings: 25 KVA and 63 KVA. The scope includes transformer substations with External Service connections using either 3 core HT Cable or HT ACSR Conductor, plus a metering unit. The procurement location is Srinagar, Jammu & Kashmir. Estimated contract value is ₹4,018,693 with an EMD of ₹80,374. There are no BOQ items published. All work must comply with the applicable ATC provisions and be covered by a CMC/AMC arrangement. A key differentiator is the dual-rating, pre-owned asset maintenance under ATC guidance, with optional quantity/duration adjustments as per ATC terms.
Product/service names: Customized AMC/CMC for pre-owned transformer substations
Quantities/ratings: 25 KVA and 63 KVA transformer substations
Financials: Estimated value ₹4,018,693; EMD ₹80,374
Experience: Prior AMC/CMC for transformer substations (pre-owned)
Quality/standards: ATC compliance; maintenance under CMC/AMC terms
EMD fixed at ₹80,374; payment terms per ATC
50% quantity/duration variation allowed pre/post contract
All terms governed by GTC/ATC/BOQ compliance
Payment terms aligned with ATC/CMC guidelines; include method of EMD and instalment schedule per contract
Delivery/commissioning schedule to be defined in ATC; flexibility up to 50% as per buyer clause
Penalties to be specified in ATC/CMC contract; LDs applicable for non-compliance as per terms
Experience in supplying/maintaining transformer substation AMC/CMC for pre-owned assets
Financial capacity to handle an estimated value of ₹4,018,693
Compliance with GTC/ATC/BOQ requirements and ability to submit OEM authorizations
Quantity
71
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Compliance
Yes
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
13
Experience Required
7 Year (s)
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Customized AMC/CMC for Pre-owned Products - 25 KVA rating Transformer Substation with External Service connection with 3 core HT Cable and metering unit; AS PER ATC; Comprehensive Maintenance Contract (CMC); AS PER ATC; No , Customized AMC/CMC for Pre-owned Products - 25 KVA rating Transformer Substation with External Service connection with HT ACSR Conductor and metering unit; AS PER ATC; Comprehensive Maintenance Contract (CMC); AS PER ATC; No , Customized AMC/CMC for Pre-owned Products - 63 KVA rating Transformer Substation with External Service connection with 3 core HT Cable and metering unit; AS PER ATC; Comprehensive Maintenance Contract (CMC); AS PER ATC; No , Customized AMC/CMC for Pre-owned Products - 63 KVA rating Transformer Substation with External Service connection with HT ACSR Conductor and metering unit; AS PER ATC; Comprehensive Maintenance Contract (CMC); AS PER ATC; No
Advisory Bank
PUNJAB NATIONAL BANK
ePBG Percentage
5%
ePBG Duration (Months)
27
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Srinagar
Delivery Pincodes
190001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Vijay K. Raina | 190001,Telephone Exchange Building Lal Chowk Srinagar | Srinagar | Jammu And Kashmir | 190001 | 45 | - | Number of months within the contract period for which service is required : 24 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar AMC/CMC of transformer substations
Financial statements (as required by GTC/ATC/BOQ)
EMD submission proof (₹80,374)
Technical bid documents confirming ATC/BOQ compliance
OEM authorization/certifications (if required by ATC)
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit all documents per GTC/ATC/BOQ, provide EMD of ₹80,374, and ensure ATC compliance. The scope includes 25 KVA and 63 KVA pre-owned substations with external service connections and metering units. Include OEM authorizations and experience certificates demonstrating prior transformer maintenance projects.
Submit GST registration, PAN, experience certificates for similar AMC/CMC work, financial statements, EMD proof of ₹80,374, technical bid documents, OEM authorizations, and all documents as per GTC/ATC/BOQ to participate in this tender.
The tender requires AMC/CMC for pre-owned substations with external service connections using 3 core HT Cable or HT ACSR Conductor and an integrated metering unit; all work must be AS PER ATC with a comprehensive maintenance contract.
EMD of ₹80,374 is required at bid submission; ensure online or DD payment as per ATC/GTC guidelines, with submission proof attached to the bid package.
Under the buyer-added ATC, the contract quantity or duration can be adjusted by up to 50% prior to award and after issue, subject to supplier consent and ATC approval.
The maintenance contract must comply with ATC provisions specified by GTC; no specific IS/IEC standard is listed, but ATC compliance and OEM authorizations are required.
The estimated value is ₹4,018,693 with an EMD of ₹80,374; bidders should prepare financials and bid documents accordingly to align with ATC and GTC requirements.
Provide experience certificates showing prior AMC/CMC work on transformer substations (pre-owned), along with financial statements and OEM authorizations to prove capability and compliance with ATC/GTC requirements.