Bid Publish Date
14-Oct-2026, 3:02 pm
Bid End Date
04-Nov-2026, 3:00 pm
EMD
₹40,000
Location
Progress
Indian Army invites bids for Base work, Retaining wall, Teen shade construction, Vinyl Flooring, Underlay, Service and Installation PVC Mats Installation, Service and Installation Underlay Installation, Badminton Post, Artificial Grass, Grass installation with Adhesive, LED Lights, LED Lights installation in DEHRADUN, UTTARAKHAND. Quantity: 18956. Submission Deadline: 04-11-2026 15: 00: 00. Submit your proposal before the deadline.
Quantity
18956
Category
Base work
Bid Type
Two Packet Bid
Bid Validity
150 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
30 %
Warranty Period
2 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Base work , Retaining wall , Teen shade construction , Vinyl Flooring , Underlay , Service and Installation PVC Mats Installation , Service and Installation Underlay Installation , Badminton Post , Artificial Grass , Grass installation with Adhesive , LED Lights , LED Lights installation
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
26
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
DEHRADUN
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | DEHRADUN | DEHRADUN | - | - | 2100 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Base work
4 inch brick blast 2 inch PCC
Retaining wall
5 ft Wall from Ground level
Teen shade construction
Shed construction after 5 ft wall from the ground level, height one side 35 ft from botton slope 3 ft total area of shed 8000 sq ft
Vinyl Flooring
5 mm gem green roll size of 15M x 2M
Underlay
4 or 5 mm
Service and Installation PVC Mats Installation
Service and Installation PVC Mats Installation
Service and Installation Underlay Installation
Service and Installation Underlay Installation
Badminton Post
Movable
Artificial Grass
Pile Height of 30 mm
Grass installation with Adhesive
Artificial Grass installation with Adhesive
LED Lights
200 watt LED Sports Lights
LED Lights installation
Installation of Lights with copper cable of 3 mm or 2 and 2 core
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Base work | 4 inch brick blast 2 inch PCC | 2,100 | sq ft | rimc@ao | 90 | |
| 2 | Retaining wall | 5 ft Wall from Ground level | 1,330 | sq ft | rimc@ao | 90 | |
| 3 | Teen shade construction | Shed construction after 5 ft wall from the ground level, height one side 35 ft from botton slope 3 ft total area of shed 8000 sq ft | 8,000 | sq ft | rimc@ao | 90 | |
| 4 | Vinyl Flooring | 5 mm gem green roll size of 15M x 2M | 1,452 | sq ft | rimc@ao | 90 | |
| 5 | Underlay | 4 or 5 mm | 1,452 | sq ft | rimc@ao | 90 | |
| 6 | Service and Installation PVC Mats Installation | Service and Installation PVC Mats Installation | 1,452 | sq ft | rimc@ao | 90 | |
| 7 | Service and Installation Underlay Installation | Service and Installation Underlay Installation | 1,452 | sq ft | rimc@ao | 90 | |
| 8 | Badminton Post | Movable | 1 | pair | rimc@ao | 90 | |
| 9 | Artificial Grass | Pile Height of 30 mm | 850 | sq ft | rimc@ao | 90 | |
| 10 | Grass installation with Adhesive | Artificial Grass installation with Adhesive | 850 | sq ft | rimc@ao | 90 | |
| 11 | LED Lights | 200 watt LED Sports Lights | 16 | pc | rimc@ao | 90 | |
| 12 | LED Lights installation | Installation of Lights with copper cable of 3 mm or 2 and 2 core | 1 | set | rimc@ao | 90 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer