Bid Publish Date
22-Mar-2025, 2:22 pm
Bid End Date
06-Jun-2025, 11:00 am
Location
Progress
Quantity
50
Category
Item-1
Bid Type
Two Packet Bid
A tender has been published for Nuclear Power Corporation Of India Limited Item-1, Item-2, Item-3, Item-4, Item-5, Item-6, Item-7, Item-8, Item-9, Item-10, Item-11, Item-12, Item-13 in CHITTORGARH, RAJASTHAN. Quantity: 50 by. Submission Deadline: 06-06-2025 11: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Item-1 , Item-2 , Item-3 , Item-4 , Item-5 , Item-6 , Item-7 , Item-8 , Item-9 , Item-10 , Item-11 , Item-12 , Item-13
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Item-1
DABI ATLANTE SPRAY VALVE BO/DOM/071
Item-2
DABI ATLANTE WR VALVE BO/DOM/073
Item-3
DABI ATLANTE WATER FILTER BO/DOM/088
Item-4
DABI ATLANTE 6x4 AIR TUBE BO/DOM/147
Item-5
DABI ATLANTE 6x4 SOFT TUBE BO/DOM/148
Item-6
DABI ATLANTE 2x1.6mm SOFT TUBE BO/DOM/502
Item-7
DABI ATLANTE 3/4 DRAINAGE TUBE BO/DOM/151
Item-8
DABI ATLANTE 1/2 SUCTION TUBE BO/DOM/150
Item-9
DABI ATLANTE LIGHT WIRE BO/DOM/145
Item-10
DABI ATLANTE 3 WAY SYRINGE CONTRA BO/IMP/009
Item-11
DABI ATLANTE AIROTOR CUPPLING BO/IMP/010
Item-12
DABI ATLANTE 3 WAY SYRINGE TUBING BO/DOM/080
Item-13
DABI ATLANTE AIROTOR TUBING BO/DOM/081
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Item-1 | DABI ATLANTE SPRAY VALVE BO/DOM/071 | 2 | nos | consignee24.rj | 60 | |
| 2 | Item-2 | DABI ATLANTE WR VALVE BO/DOM/073 | 2 | nos | consignee24.rj | 60 | |
| 3 | Item-3 | DABI ATLANTE WATER FILTER BO/DOM/088 | 1 | no | consignee24.rj | 60 | |
| 4 | Item-4 | DABI ATLANTE 6x4 AIR TUBE BO/DOM/147 | 5 | nos | consignee24.rj | 60 | |
| 5 | Item-5 | DABI ATLANTE 6x4 SOFT TUBE BO/DOM/148 | 5 | nos | consignee24.rj | 60 | |
| 6 | Item-6 | DABI ATLANTE 2x1.6mm SOFT TUBE BO/DOM/502 | 5 | nos | consignee24.rj | 60 | |
| 7 | Item-7 | DABI ATLANTE 3/4 DRAINAGE TUBE BO/DOM/151 | 4 | nos | consignee24.rj | 60 | |
| 8 | Item-8 | DABI ATLANTE 1/2 SUCTION TUBE BO/DOM/150 | 8 | nos | consignee24.rj | 60 | |
| 9 | Item-9 | DABI ATLANTE LIGHT WIRE BO/DOM/145 | 10 | nos | consignee24.rj | 60 | |
| 10 | Item-10 | DABI ATLANTE 3 WAY SYRINGE CONTRA BO/IMP/009 | 2 | nos | consignee24.rj | 60 | |
| 11 | Item-11 | DABI ATLANTE AIROTOR CUPPLING BO/IMP/010 | 2 | nos | consignee24.rj | 60 | |
| 12 | Item-12 | DABI ATLANTE 3 WAY SYRINGE TUBING BO/DOM/080 | 2 | nos | consignee24.rj | 60 | |
| 13 | Item-13 | DABI ATLANTE AIROTOR TUBING BO/DOM/081 | 2 | nos | consignee24.rj | 60 |
Discover companies most likely to bid on this tender
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
06-Jun-2025, 11:00 am
Opening Date
06-Jun-2025, 11:30 am
Extended Deadline
23-Apr-2025, 11:00 am
Opening Date
23-Apr-2025, 11:30 am
Key insights about RAJASTHAN tender market
The eligibility requirements include being a registered entity, possessing valid GST registration, and having no blacklist status with any government department. Additionally, bidders must demonstrate prior experience in supplying similar products.
All spare parts must meet specific industry standards for quality and safety, as detailed in the tender documentation. Bidders are required to provide comprehensive technical descriptions to ensure compliance with the outlined specifications.
Bidders must submit all required documents electronically through the designated tender portal. It's essential to format documents according to the provided guidelines to ensure compliance and avoid disqualification.
Bidders may be required to provide a performance security deposit as specified in the tender documents. This deposit ensures compliance with the contract terms and is typically a percentage of the total contract value as determined during the bidding process.
Yes, there are special provisions that benefit MSEs and startups. Bidders are encouraged to identify their status as MSEs in their submissions to take advantage of these advantages, which may include prioritization in the evaluation process.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS