Bid Publish Date
09-Sep-2026, 3:32 pm
Bid End Date
21-Sep-2026, 4:00 pm
Location
Progress
The South East Central Railway (Indian Railways) invites bids for Miner's Safety Goggles (V2) conforming to IS 14352 (Q3) under a supply-only contract. No initial BOQ items are listed and the estimated value is not disclosed. The project location is not specified in the tender data. A 25% quantity option is reserved to the Purchaser, with prices remaining at contracted rates. Inspection will be conducted post-receipt by the consignee, based on OEM guidelines documented in GC & TC. Manufacturer authorization from OEMs is required for authorized distributors.
Product name: Miner's Safety Goggles (V2)
Standard: IS 14352 (Q3)
Category: Safety eyewear for miners
Scope: Supply of Goods only
Inspection: Post-receipt inspection by consignee; OEM GC & TC referenced
EMD amount: Not disclosed in the tender data
Quantity adjustments: Up to 25% during contract; extended delivery time formula
Delivery: From last date of original delivery order; extended period rules apply
Payment terms: Not specified in the data provided
Documentation: Mandatory OEM authorization and post-receipt inspection terms
Inspection authority: Post-receipt by consignee; pre-dispatch inspection not mandated
Purchaser may alter quantity by up to 25% during contract and currency at contracted rates; delivery time adjusts per formula with minimum 30 days
Post-receipt inspection by consignee; OEM GC & TC to govern acceptance; pre-dispatch not mandatory unless ATC selects it
Bidder must submit OEM authorization form/certificate with vendor details for authorized distributors
Authorized distributor of OEM with valid authorization
Experience in supplying safety eyewear or IS 14352-compliant products
GST registration and PAN card valid; financial capability to supply goods
Quantity
1000
Bid Type
Single Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Miner's Safety Goggles (V2) Conforming to IS 14352 (Q3)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Nagpur
Delivery Pincodes
440001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ashim Kumar Montu Mohan Das | 440001,Office of CWM MIB Workshop,Nagpur-440001 | Nagpur | Maharashtra | 440001 | 1000 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
OEM authorization / Authorized distributor certificate
Manufacturer authorization form with OEM details (name, designation, address, email, phone)
Any existing quality certifications proving IS 14352 (Q3) compliance
Bid submission letter on bidder’s letterhead
Post-acceptance inspection plan or GC/TC excerpts related to IS 14352 compliance
Bidders should ensure IS 14352 (Q3) compliance, submit OEM authorization, provide GST and PAN, and attach post-receipt inspection plans. Include updated contact details and confirm supply-only scope. The option clause allows up to 25% quantity changes at contracted rates, with delivery timing linked to the original schedule.
Submit GST certificate, PAN, OEM authorization, vendor contact details, and GC/TC excerpts showing IS 14352 conformity. Include bid submission letter, financial statements if requested, and post-receipt inspection plan aligned to consignee requirements.
Delivery starts from the last date of the original delivery order; option clause may extend delivery time if quantity changes. If extended, minimum extension is 30 days; exact period depends on quantity adjustment calculated as (increased quantity/original quantity) × original delivery period.
Goggles must conform to IS 14352 (Q3); ensure all performance and safety requirements of the standard are met and be able to provide IS 14352 certification or test reports with bid.
Inspection is post-receipt by the consignee under OEM GC & TC; pre-dispatch inspection is not mandatory unless ATC specifies. Ensure readiness to facilitate post-delivery inspection and supply necessary documentation.
EMD details are not disclosed in the tender data; bidders should monitor the procurement portal for payment terms and security deposit requirements and prepare funds or guarantees accordingly once published.
Yes, but you must provide a valid OEM authorization/Certificate with full distributor details (name, designation, address, email, phone) to demonstrate authorized status and eligibility.
The purchaser may adjust quantity up to ±25% at contracted rates; extended delivery time is calculated by (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.