Bid Publish Date
28-Aug-2026, 6:29 pm
Bid End Date
07-Sep-2026, 7:00 pm
Location
Progress
The procurement is issued by IISCO Steel Plant (part of Steel Authority of India Limited) for a Semi-Hermetic Reciprocating Compressor. Location: BARDHAMAN, WEST BENGAL - 713101. Scope is the supply of goods (no BOQ items listed) with an undefined estimated value and EMD; delivery terms are governed by standard option clauses allowing up to 25% quantity variation. GST clarifications are vendor responsibility, with GST reimbursement subject to actuals or lower applicable rates. Unique terms include vendor-code creation documentation and GST invoicing through the GeM portal. The contract emphasizes supply-only delivery and adherence to standard procurement protocols.
Product/service names and category: Semi-Hermetic Reciprocating Compressor
Estimated value and EMD: not specified in tender
Delivery terms: 25% quantity variation; minimum 30 days extended delivery
GST requirements: vendor bears GST; reimbursement as actuals or lower rate
Invoicing: GST invoice upload and GST portal payment screenshot on GeM
Documentation: PAN, GSTIN, cancelled cheque, EFT mandate for vendor code
Scope: supply of goods only; installation/commissioning not indicated
Option clause allows ±25% quantity variation during contract
GST responsibility rests with bidder; reimbursement capped by actuals or lower rate
Delivery commences from last date of original delivery order; extended period rules apply
GeM portal invoicing requires GST invoice and payment confirmation
GST invoicing via GeM and payment confirmation; no explicit advance or milestone terms stated
Delivery period adjusts with quantity variations; minimum 30 days for extended delivery
Not specified in provided terms; implied adherence to standard GeM contract rules
Eligibility to supply semi-hermetic reciprocating compressors as per GeM Geology terms
PAN and GSTIN valid; EFT mandate provided for vendor-code creation
Experience in supplying compressor equipment or similar OEM-approved products
Quantity
3
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
SEMI-HERMETIC RECIPROCATING COMPRESSOR
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
130
Delivery Locations
1
Delivery Cities
Paschim Bardhaman
Delivery Pincodes
713325
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sanjoy Kumar Maji | 713325,Materials Management Dept. IISCO Steel Plant Burnpur | Paschim Bardhaman | West Bengal | 713325 | 3 | 130 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about WEST BENGAL tender market
Bidders should prepare PAN, GSTIN, cancelled cheque, and EFT mandate for vendor-code creation, submit through GeM, and ensure GST invoicing with payment confirmation. The contract allows ±25% quantity variation, and delivery timelines hinge on the original order with a minimum 30-day extension when quantities change.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, and GST invoice with GeM payment confirmation. OEM authorizations and experience certificates for compressor equipment are recommended. Ensure GeM portal uploads align with the ATC terms referenced in the tender.
Delivery begins from the last date of the original delivery order. If the quantity increases, the extended delivery time is calculated as (increased quantity/original quantity) × original period, with a minimum of 30 days. The purchaser may extend this duration up to the original delivery period.
Bidders must account for GST as applicable; the purchaser reimburses GST at actuals or the lower rate. Ensure GST invoicing on GeM and provide payment confirmation screenshots to process the GST portion efficiently.
Scope is limited to the supply of goods only; installation or commissioning is not explicitly included in the tender. Vendors should confirm post-bid for any after-sales support or warranty terms.
Eligible bidders should demonstrate prior experience supplying semi-hermetic reciprocating compressors or OEM-approved equivalents, with valid credentials and performance history. Documentation should align with GeM vendor-code requirements and ATC terms included in the tender.
Bids must incorporate the 25% variation clause, anticipating possible increases or decreases during contract execution. Provide pricing that accommodates potential quantity changes and ensure delivery schedules are flexible enough to absorb the extended timelines.
Submit a GST-compliant invoice on GeM with payment confirmation from the GST portal. Ensure the EFT mandate and GSTIN details are correct to enable timely reimbursement and avoid payment delays.