Panchayati Raj Department Bihar High Mast Lighting Tower LED Flood Lighting Tender Begusarai 2026

Bid Publish Date

10-Oct-2026, 5:03 pm

Bid End Date

20-Oct-2026, 9:00 pm

Progress

Issue10-Oct-2026, 5:03 pm
AwardPending

Key Highlights

  • • Product category clearly identified: High Mast Lighting Tower with LED Flood Lighting System for large areas
  • • Location specificity: Begusarai, Bihar 848201 under Panchayati Raj Department
  • • Option clause permits ±25% quantity change at contracted rates during placement and currency of contract
  • • Delivery-extension formula: (additional quantity ÷ original quantity) × original delivery period, minimum 30 days

Tender Overview

The procurement is led by Panchayati Raj Department, Bihar for a High Mast Lighting Tower for large area with LED Flood Lighting System in Begusarai, Bihar (PIN 848201). The tender covers a single, broad lighting solution category (Q3) with no specified BOQ items or exact quantities disclosed. A key differentiator is the option clause allowing ±25% quantity changes at contracted rates. The delivery framework references the last delivery order date for start of delivery and outlines pro-rated extension calculations, emphasizing flexible fulfillment within contract terms.

Technical Specifications & Requirements

  • Product/service: High Mast Lighting Tower for large area with LED Flood Lighting System (Q3).
  • Location: Begusarai, Bihar.
  • Quantity/Estimated value: Not disclosed in the tender data.
  • Delivery/extension terms: Option to increase/decrease quantity by up to 25%; delivery period calculated as (additional quantity ÷ original quantity) × original delivery period, minimum 30 days; extended delivery time may apply up to the original period.
  • ATC/terms: Buyer added terms include the ATC document reference; no technical specs or standards are specified in the provided data.
  • Compliance expectations: Absent explicit standards; bidders should anticipate typical infrastructure lighting norms and ensure compatibility with LED flood lighting systems for large areas.

Terms, Conditions & Eligibility

  • EMD/financials: Not specified in the data; bidders should verify in ATC and tender portal.
  • Delivery: Flexible delivery window per option clause; original delivery period governs base timeline.
  • Payment terms: Not described in the data; bidders should await TE/ATC for payment milestones.
  • Documentation: ATC refers to a separate document; prepare standard tender documents and certifications per portal requirements.
  • Risk/penalties: No explicit LD or warranty terms provided in the excerpt.

Key Specifications

  • Product/service names: High Mast Lighting Tower, LED Flood Lighting System

  • Location/Delivery: Begusarai, Bihar

  • Quantity/Value: Not disclosed; await ATC updates

  • Standards/Certifications: Not specified in tender data

  • Delivery: Option clause allows ±25% quantity; delivery formula and minimum 30 days rule

  • Warranty/Support: Not specified in provided data

Terms & Conditions

  • Option clause allows +/- 25% quantity change at contract rates

  • Delivery period based on last original delivery order date with extension method

  • ATC document referenced; verify all terms in bidder stage

Important Clauses

Payment Terms

Not specified in the data; refer to ATC for milestones and terms

Delivery Schedule

Delivery starts from the last date of the original delivery order; extended time is calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

No LD information provided in the excerpt; verify in ATC

Bidder Eligibility

  • Experience in supplying LED lighting towers or large-area lighting solutions

  • Financial capacity to handle orders with potential ±25% quantity changes

  • GST registration and PAN; compliance with standard tender submission requirements

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

105 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

2

Past Performance

10 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

High Mast Lighting Tower for large area with LED Flood Lighting System (Q3)

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Begusarai

Delivery Pincodes

851211

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rama Shankar Jha851211,PANCHAYAT OFFICE RAHATPURBegusaraiBihar851211145-

Authority Records

PANCHAYAT RAJ DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-10016653.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Panchayat Office Rahatpur

Grievance Contact

[email protected]

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar LED lighting installations

4

Financial statements (audited, last 3 years)

5

EMD/Security deposit proof (as per ATC)

6

Technical compliance certificates (if applicable to LED flood lighting systems)

7

OEM authorization or authorized dealership documents (if bidding as a partner)

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for Begusarai high mast lighting tender in Bihar 2026?

Bidders should review the ATC document, gather GST and PAN, obtain OEM authorizations if required, and prepare technical compliance certificates. Ensure capability to handle ±25% quantity changes and confirm delivery timelines per the option clause. Submit all standard bidder documents through the portal in the specified format.

What documents are required for Panchayati Raj Bihar lighting bid 2026?

Required documents include GST registration, PAN card, audited financial statements, experience certificates for LED lighting projects, EMD proof, and any OEM authorization. Depending on ATC, additional technical compliance certificates may be necessary for LED flood lighting systems.

What are the delivery terms for the Begusarai lighting tender 2026?

Delivery starts from the last date of the original delivery order; if quantity increases, the extended time is (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. The buyer may extend delivery up to the original delivery period.

What standards or certifications are required for LED mast towers in Bihar?

The provided data does not list specific standards; bidders should rely on ATC to confirm required certifications and ensure LED flood lighting systems meet local electrical safety norms and project specifications before submission.

How is the EMD handled for this Panchayati Raj tender in Bihar?

EMD details are not specified in the summary; bidders must refer to the ATC for exact EMD amount, mode of payment, and validity. Prepare an EMD payment instrument accordingly to avoid disqualification.

What is the scope of the option clause in the Bihar lighting tender 2026?

The purchaser may increase or decrease the contracted quantity by up to 25% at contracted rates during placement or currency of the contract, enabling flexible fulfillment for variations in demand.

When will the tender procurement for Begusarai lighting be announced?

Dates are not provided in the data; bidders should monitor the official portal and ATC notices for start date, bid sale window, last date for submission, and any amendments.

What is the expected delivery timeline for LED lighting towers in this tender?

Delivery timelines are tied to the original delivery order date and adjusted by the option clause; if quantity increases, minimum 30 days applies, with time scaled by the proportion of added quantity.