TenderDekho Logo
Active GEM

Indian Air Force Procurement of Aircraft Spare Parts & Assemblies Pulwama JK 2026 ISI/AAA Standards

Bid Publish Date

28-Aug-2026, 5:24 pm

Bid End Date

18-Sep-2026, 6:00 pm

EMD

₹63,857

Progress

Issue28-Aug-2026, 5:24 pm
AwardPending

Key Highlights

  • OEM authorization certificate required from bidders
  • EMS/EMD amount clearly specified as ₹63,857
  • 3 years government/PSU experience in similar product category
  • Supply, installation, testing, commissioning, and operator training scope

Tender Overview

The Indian Air Force, Department of Military Affairs, seeks procurement of a broad range of aircraft spare parts and assemblies for operations at Pulwama, Jammu & Kashmir (190012). The catalog covers components such as sliding sleeves, flywheels, slave cylinders, master and other hydraulic and engine components, plus filters, hoses, belts, and electrical items. Estimated EMD is ₹63,857 and the scope includes supply, installation, testing, commissioning, operator training, and any statutory clearances required. The initiative features 60 BOQ items with a diverse catalog, signaling a comprehensive maintenance cycle. A key differentiator is the integration of OEM authorization and a robust past-Government-supply requirement, underscoring compliance with central procurement norms and OEM brand integrity. The tender emphasizes readiness for large, multi-item spares support in a defense context, with emphasis on timely delivery and quality adherence.

Technical Specifications & Requirements

  • No explicit technical specs published in the tender data; bidders should rely on standard IAF supply practices for aircraft spare parts and assemblies.
  • Critical compliance indicators include: OEM/OEM authorization certificate, 3 years Govt/PSU experience in manufacturing or supplying similar category products, and documented past performance.
  • Bid scope includes Supply, Installation, Testing, Commissioning, and training of operators; potential statutory clearances if applicable.
  • Required pre-submission documents include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate; bidders must demonstrate ability to meet centralized procurement standards.
  • The bid allows quantity variation up to 50% during contract execution and requires adherence to contracted rates.

Terms, Conditions & Eligibility

  • EMD: ₹63,857.
  • Experience: bidder or OEM must have regularly manufactured/supplied the same or similar category products to central/state Govt/PSU for 3 years before bid opening.
  • ATC requires: ink-signature, OEM authorization certificate, and vendor-code related documents.
  • Scope includes: supply plus installation, testing, commissioning, operator training, and any statutory clearances.
  • Payment and delivery terms are aligned with option clause; delivery period adjustments apply per quantity changes with minimum 30 days.
  • Mandatory documents: PAN, GSTIN, cancelled cheque, EFT mandate; provide OEM authorizations and past contract evidence.

Key Specifications

  • 60 total BOQ items indicating broad spare parts assortment

  • EMD amount: ₹63,857

  • Need OEM authorization and prior Govt/PSU experience: 3 years

  • Supply, Installation, Testing, Commissioning, and Operator Training included

  • Delivery period flexibility via option clause (up to 50% quantity variation)

Terms & Conditions

  • 50% quantity variation allowed during contract

  • Supply including installation and training

  • OEM authorization and Govt/PSU experience mandatory

Important Clauses

Payment Terms

Payment terms follow contract rates under option clause; no explicit timelines stated; based on delivery and acceptance.

Delivery Schedule

Delivery period linked to original order date; extended periods derive from calculated additional time formula with minimum 30 days.

Penalties/Liquidated Damages

Penalties/LD terms not detailed in data; contract allows delivery flexibility under option clause with potential extensions.

Bidder Eligibility

  • Must have 3 years of govt/PSU experience in similar product category

  • Must hold OEM authorization certificate

  • Must provide GSTIN and PAN, EFT mandate, and cancelled cheque

Tender Data

Bid Details

Quantity

588

Category

SLIDING SLEEEVE

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

SLIDING SLEEEVE , SA OF FLY WHEEL , SLAVE CYLINDER ASY 1 , MASTER CYLINDER 2516 TIP , BALL BEARING , FIP COUPLING 6DTIE 2 , RESERVOIR ASSEMBLY , RECTIFIER ASSY , CLUTCH PLATE , CUT MODEL WATER PUMP 6 DT , STARTER 24 V , VOLTAGE REGULATOR 24 VDC , SPIGOT BEARING , DRIVING PLATE PRESSURE PLATE , PINION , O FILTER BUSH 6DT , SOLENOID SWITCH , SPEEDO CABLE , HYDRAULIC SUCTION FILTER , HYDRAULIC RETURN LINE FILTER ELEMENT , ENGINE WATER SEPRATOR , HUMP HOSE , WIPER BLADE ASSY , COMP VS KIT 6DTI , FUEL HOSE , HOSE , SILICON HOSE 6 DTI E2 , STRAIGHT HOSE , SA PIPE-690 , BEARING FOR CENTRAL BRUSH , ENGINE STOPING SOLENOID , PURGING VALVE , AIR PRESSURE GAUGE , HYDRAULIC AIR BREATHER , HYDRAULIC HOSE 1 , IGNITION SWITCH , MAIN BLOWER BEARING , ALTERNATOR LUCAS24 V , WATER SPREYING PNUMATIC PUMP , AIR DRYER , MAIN BLOWER BEARING SLEEVE , ENGINE PRIMARY FUEL FILTER ELEMENT , ENGINE SECONDARY FUEL FILTER ELEMENT , ENGINE OIL FILTER ELEMENT , ENGINE AIR FILTER ELEMENT , V BELT FOR BLOWER , V BELT FOR HYDRAULIC PUMP , PUSH BUTTON , RUBBER SEALING BETWEEN CM CHAMBER , SELECTOR SWITCH , PU TUBE , BATTERY TERMINAL , SUCTION HOOD RUBBER SEALING , TAPPET COVER PACKING , REV LIGHT SWITCH , RADIATOR HOSE INCLUDING INTER COOLER HOSE SET , FAN BELT FOR FOR AUX ENGINE , COMBINATION SWITCH , A RESERVOIR 15 LTR , HYDRAULIC CYLINDER FOR HOPPER

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

PULWAMA

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PULWAMAPULWAMA--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9714178.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Air Force

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 60 Items Sign in for GEM prices

#1

SLIDING SLEEEVE

SLIDING SLEEEVE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#2

SA OF FLY WHEEL

SA OF FLY WHEEL REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#3

SLAVE CYLINDER ASY 1

SLAVE CYLINDER ASY 1 REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#4

MASTER CYLINDER 2516 TIP

MASTER CYLINDER 2516 TIP REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#5

BALL BEARING

BALL BEARING REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#6

FIP COUPLING 6DTIE 2

FIP COUPLING 6DTIE 2 REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#7

RESERVOIR ASSEMBLY

RESERVOIR ASSEMBLY REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#8

RECTIFIER ASSY

RECTIFIER ASSY REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#9

CLUTCH PLATE

CLUTCH PLATE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#10

CUT MODEL WATER PUMP 6 DT

CUT MODEL WATER PUMP 6 DT REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#11

STARTER 24 V

STARTER 24 V REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#12

VOLTAGE REGULATOR 24 VDC

VOLTAGE REGULATOR 24 VDC REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#13

SPIGOT BEARING

SPIGOT BEARING REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#14

DRIVING PLATE PRESSURE PLATE

DRIVING PLATE PRESSURE PLATE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#15

PINION

PINION REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#16

O FILTER BUSH 6DT

O FILTER BUSH 6DT REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#17

SOLENOID SWITCH

SOLENOID SWITCH REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#18

SPEEDO CABLE

SPEEDO CABLE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#19

HYDRAULIC SUCTION FILTER

HYDRAULIC SUCTION FILTER REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#20

HYDRAULIC RETURN LINE FILTER ELEMENT

HYDRAULIC RETURN LINE FILTER ELEMENT REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#21

ENGINE WATER SEPRATOR

ENGINE WATER SEPRATOR REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#22

HUMP HOSE

HUMP HOSE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#23

WIPER BLADE ASSY

WIPER BLADE ASSY REQUIRED FOR REPAIR AND MAINTENACE OF MRS

4 pieces Delivery: 10 days
#24

COMP VS KIT 6DTI

COMP VS KIT 6DTI REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#25

FUEL HOSE

FUEL HOSE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#26

HOSE

HOSE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#27

SILICON HOSE 6 DTI E2

SILICON HOSE 6 DTI E2 REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#28

STRAIGHT HOSE

STRAIGHT HOSE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#29

SA PIPE-690

SA PIPE690 REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#30

BEARING FOR CENTRAL BRUSH

BEARING FOR CENTRAL BRUSH REQUIRED FOR REPAIR AND MAINTENACE OF MRS

4 pieces Delivery: 10 days
#31

ENGINE STOPING SOLENOID

ENGINE STOPING SOLENOID REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#32

PURGING VALVE

PURGING VALVE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

14 pieces Delivery: 10 days
#33

AIR PRESSURE GAUGE

AIR PRESSURE GAUGE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#34

HYDRAULIC AIR BREATHER

HYDRAULIC AIR BREATHER REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#35

HYDRAULIC HOSE 1

HYDRAULIC HOSE 1 REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#36

IGNITION SWITCH

IGNITION SWITCH REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#37

MAIN BLOWER BEARING

MAIN BLOWER BEARING SLEEVE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

4 pieces Delivery: 10 days
#38

ALTERNATOR LUCAS24 V

ALTERNATOR LUCAS-24 V REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#39

WATER SPREYING PNUMATIC PUMP

WATER SPREYING PNUMATIC PUMP REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#40

AIR DRYER

AIR DRYER REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#41

MAIN BLOWER BEARING SLEEVE

MAIN BLOWER BEARING SLEEVE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

4 pieces Delivery: 10 days
#42

ENGINE PRIMARY FUEL FILTER ELEMENT

ENGINE PRIMARY FUEL FILTER ELEMENT REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#43

ENGINE SECONDARY FUEL FILTER ELEMENT

ENGINE SECONDARY FUEL FILTER ELEMENT REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#44

ENGINE OIL FILTER ELEMENT

ENGINE OIL FILTER ELEMENT REQUIRED FOR REPAIR AND MAINTENACE OF MRS

4 pieces Delivery: 10 days
#45

ENGINE AIR FILTER ELEMENT

ENGINE AIR FILTER ELEMENT REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#46

V BELT FOR BLOWER

V BELT FOR BLOWER REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#47

V BELT FOR HYDRAULIC PUMP

V BELT FOR HYDRAULIC PUMP REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#48

PUSH BUTTON

PUSH BUTTON REQUIRED FOR REPAIR AND MAINTENACE OF MRS

6 pieces Delivery: 10 days
#49

RUBBER SEALING BETWEEN CM CHAMBER

RUBBER SEALING BETWEEN CM CHAMBER REQUIRED FOR REPAIR AND MAINTENACE OF MRS

30 pieces Delivery: 10 days
#50

SELECTOR SWITCH

SELECTOR SWITCH REQUIRED FOR REPAIR AND MAINTENACE OF MRS

10 pieces Delivery: 10 days
#51

PU TUBE

PU TUBE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

400 pieces Delivery: 10 days
#52

BATTERY TERMINAL

BATTERY TERMINAL REQUIRED FOR REPAIR AND MAINTENACE OF MRS

4 pieces Delivery: 10 days
#53

SUCTION HOOD RUBBER SEALING

SUCTION HOOD RUBBER SEALING REQUIRED FOR REPAIR AND MAINTENACE OF MRS

8 pieces Delivery: 10 days
#54

TAPPET COVER PACKING

TAPPET COVER PACKING REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#55

REV LIGHT SWITCH

REV LIGHT SWITCH REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#56

RADIATOR HOSE INCLUDING INTER COOLER HOSE SET

RADIATOR HOSE INCLUDING INTER COOLER HOSE SET REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#57

FAN BELT FOR FOR AUX ENGINE

FAN BELT FOR FOR AUX ENGINE REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#58

COMBINATION SWITCH

COMBINATION SWITCH REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#59

A RESERVOIR 15 LTR

A RESERVOIR 15 LTR REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days
#60

HYDRAULIC CYLINDER FOR HOPPER

HYDRAULIC CYLINDER FOR HOPPER REQUIRED FOR REPAIR AND MAINTENACE OF MRS

2 pieces Delivery: 10 days

Categories 96

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN certificate copy

3

Cancelled cheque copy

4

EFT Mandate copy certified by bank

5

OEM/OEM authorization certificate

6

Past project experience documents (contracts, invoices or execution certificates)

7

Contract copies with client certifications or equivalent

8

Technical bid documents and supplier compliance certificates

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for aircraft spare parts tender in Pulwama 2026?

Bidders must submit OEM authorization, PAN, GST, cancelled cheque, and EFT mandate along with technical bid. Ensure 3 years govt/PSU experience in similar parts, provide past contracts, and comply with supply, installation, testing, commissioning, and operator training requirements.

What documents are required for IAF parts procurement in Jammu & Kashmir?

Submit PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization certificate, and past performance proof (contracts/invoices/execution certificates). Include technical bid documents and any statutory clearance certificates if applicable to defence procurement.

What is the EMD amount for this IAF tender in Pulwama?

The earnest money deposit is ₹63,857. Provide payment via appropriate channel as per tender ATC; ensure EMD is valid through bid opening and aligns with contract value and variation terms.

What are the required experience criteria for defence spares supply?

Bidders must demonstrate 3 years of regular government/PSU supply of similar category products before bid opening, supported by contracts, invoices, or execution certificates that prove sustained capability.

What scope of work is included in the IAF tender for spares?

Scope includes supply, installation, testing, commissioning, operator training, and providing statutory clearances if required; the bid must cover setup and enabling operation of all supplied components.

Are there any special clause in delivery time for quantity changes?

Yes. An option clause allows up to 50% quantity variation with a new delivery period calculated as (additional quantity/original quantity) × original delivery period, minimum 30 days.