TenderDekho Logo
Active GEM

Indian Army Split AC 1.5 Ton, Stabilizer, Paper Shredder, Dak Briefcase, Digital Wall Clock Tender Gujarat 2026

Bid Publish Date

29-Aug-2026, 11:06 am

Bid End Date

08-Sep-2026, 12:00 pm

Progress

Issue29-Aug-2026, 11:06 am
AwardPending

Key Highlights

  • Organization and location: Indian Army, Department Of Military Affairs, KACHCHH, GUJARAT
  • Category coverage: Split AC 1.5 Ton, AC Stabilizers, Paper Shredder Machine, Dak Briefcase, Digital Wall Clock
  • Quantity flexibility: 25% up/down quantity variation during and after contract
  • Delivery timing logic: starts from last original delivery order date; extended time = (Increased quantity / Original quantity) × Original delivery period with min 30 days

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement in KACHCHH, GUJARAT 370001 for multiple office and equipment categories: Split AC 1.5 Ton units, AC stabilizers, Paper Shredder Machine, Dak Briefcase, and Digital Wall Clock. Although exact quantities and estimated value are not disclosed, the tender encompasses five distinct items with potential bulk needs and government-grade specifications. The inclusion of a delivery-quantity option clause signals flexible ordering up to 25% more than bid quantity, and a dynamic delivery timeline aligned with the last delivery order date. This framework indicates a broad scope across climate control, office automation, and essential administrative gear. The buyer emphasizes compliance with contractually adjustable quantities and extended delivery windows as project scope evolves.

Technical Specifications & Requirements

  • Items: Split AC 1.5 Ton units, AC Stabilizers, Paper Shredder Machine, Dak Briefcase, Digital Wall Clock
  • No explicit technical specifications or standards provided in the tender data
  • BOQ reports 5 total items; details missing for quantity, unit, and value
  • No brand, model, or certification requirements stated
  • Key procurement intent appears to cover standard office and climate-control equipment for defense administration
  • The absence of start/end dates requires bidders to rely on standard government procurement timelines and the option clause to gauge delivery planning

Terms, Conditions & Eligibility

  • Quantity Variation: Purchaser may increase/decrease up to 25% at contract award and during currency at contracted rates
  • Delivery Timeline: Calculations begin from the last date of the original delivery order; extended periods based on option clause with minimum 30 days
  • All bidders must comply with option-clauses and delivery-time logic as described
  • EMD, payment terms, and detailed eligibility criteria are not specified in the provided tender data; bidders should anticipate standard government bid documentation and compliance requirements

Key Specifications

  • Items and categories: Split AC 1.5 Ton, AC Stabilizers, Paper Shredder Machine, Dak Briefcase, Digital Wall Clock

  • Estimated value and exact quantities not disclosed; anticipate standard government procurement scales

  • No explicit standards (IS/ISO) listed; bidders should prepare equipment meeting general domestic electrical and safety norms

  • Delivery-related terms governed by option clause and last-delivery-order-based timeline

  • No brand/OEM mandates specified; bidders may propose compliant third-party or OEM-procured equipment

Terms & Conditions

  • 25% quantity variation permitted during and after contract

  • Delivery period linked to last original delivery order date with formula-based extension

  • No explicit EMD amount or payment terms provided; bidders should follow standard government bid practices

Important Clauses

Delivery Extension Clause

Delivery extension is computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, with possible extension to original delivery period during option exercise

Option Clause

purchaser reserves the right to increase or decrease quantity up to 25% at bid/contract time and during currency at contracted rates

Compliance

Bidder must comply with option and delivery terms; noncompliance may affect award or execution

Bidder Eligibility

  • Experience in supplying office equipment or climate-control units to government or defense bodies

  • Ability to meet delivery timelines under option-based quantity adjustments

  • Financial stability to support procurement and potential volume fluctuations

Tender Data

Bid Details

Quantity

13

Category

Split AC 1.5 Ton

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Split AC 1.5 Ton , Stabilizer for AC , Paper Shredder Machine , Dak Briefcase , Digital Wall Clock

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Kachchh

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KachchhKachchh--315-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9819912.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Split AC 1.5 Ton

Split AC 1.5 Ton

3 nos Delivery: 15 days
#2

Stabilizer for AC

Stabilizer for AC

3 nos Delivery: 15 days
#3

Paper Shredder Machine

Paper Shredder Machine

3 nos Delivery: 15 days
#4

Dak Briefcase

Dak Briefcase

3 nos Delivery: 15 days
#5

Digital Wall Clock

Digital Wall Clock

1 nos Delivery: 15 days

Categories 8

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience certificates for similar procurements

4

Financial statements or turnover documents

5

EMD/Security deposit proof (as applicable per scope)

6

Technical bid documents demonstrating capability for Split ACs, stabilizers, shredders, briefcases, clocks

7

OEM authorization letters (if bidding as authorized dealer)

8

Any essential compliance certificates for office equipment (as required by tender terms)

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for Indian Army tender in Kachchh Gujarat 2026

Bidders should register on the GEM portal, upload GST, PAN, and financials, provide OEM authorizations if needed, and submit technical and commercial bids. Ensure compliance with the 25% quantity variation clause and prepare for delivery based on the last original delivery order date.

What documents are required for Army equipment tender bid Gujarat

Required documents include GST registration, PAN, experience certificates for similar procurements, financial statements, EMD proof, technical bid, OEM authorizations, and declarations of compliance with option-based delivery terms and applicable standards.

What items are covered under the Indian Army procurement in Gujarat

The tender covers five item categories: Split AC 1.5 Ton units, AC stabilizers, Paper Shredder Machines, Dak Briefcases, and Digital Wall Clocks. Exact models and quantities are not disclosed in the available data.

What are the delivery terms for Army procurement Gujarat

Delivery terms are defined by the last date of the original delivery order; extension is allowed via the option clause with extended time calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days.

What is the EMD requirement for this procurement in Gujarat

Specific EMD amount is not disclosed in the tender data. Bidders should prepare to submit standard EMD as per GEM portal guidelines and ensure compliance with all terms for government supply contracts.

What standards must equipment meet for Army tender in Kachchh

No explicit standards (e.g., IS 550) are listed in the provided data. Bidders should align with general Indian safety and electrical norms and be prepared to supply standard-compliant ACs, stabilizers, shredders, briefcases, and clocks.

When will the Army tender in Gujarat be released for bids

Start and end dates are not provided in the tender data. Bidders should monitor the GEM portal for notification and prepare documentation promptly, including GST, PAN, and OEM authorizations.

How to handle quantity fluctuation in Army procurement Gujarat

Prepare for potential ±25% quantity changes at contract award and during currency. Set up flexible inventory and logistics to accommodate extended delivery windows while maintaining contracted rates.