Bid Publish Date
13-Mar-2026, 5:36 pm
Bid End Date
23-Mar-2026, 7:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Bokaro Steel Plant, under Steel Authority of India Limited, invites bids for the Electronic Total Station Survey Instrument (survey instrumentation category) to serve the West Singbhum, Jharkhand facility. The scope is limited to the supply of goods with mandatory OEM authorization where applicable, and post-inspection at the Kiriburu Iron Ore Mines store. The procurement emphasizes indigenous manufacturing with a 3-month delivery timeline from the purchase order date and stringent packing and labeling requirements. Key distinctions include supplier IM marking, GST compliance, and pre/post-delivery inspection procedures. This tender requires rigorous documentation and conformance with buyer-added terms, including warranty provisions and packing standards to minimize transit damage.
Product: Electronic Total Station Survey Instrument
Delivery: within 3 months from PO date
Origin: Indigenous manufacture or Indian supplier with OEM authorization
Inspection: Post Receipt Inspection at Kiriburu Iron Ore Mines store
Packing: robust packing with clear IM on material
Warranty: replacement for defects in design, material, workmanship
Documentation: upload data sheet; GST invoice with GST portal confirmation
Certification: follow ATC and Corrigendum certificates
Delivery within 3 months of order; strict packing with IM marks
Only indigenous or Indian suppliers; OEM authorization required if applicable
GST handling as per actuals; provide GST portal proof with invoice
Post-receipt inspection at Kiriburu store; pre-dispatch waived unless ATC states
Warranty: free replacement for defects; supplier must honor claims
GST invoicing to reflect consignee GSTIN; payment evidence via GST portal required
Delivery within 3 months from purchase order date; packing must prevent damage
Not specified in data; implied acceptance upon successful delivery and inspection
Indigenous manufacture eligibility
Authorized OEM authorization when using distributors
No current bans or suspensions by SAIL Bokaro Steel Plant
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
ELECTRONIC TOTAL STATION SURVEY INSTR.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Data sheet of Electronic Total Station Survey Instrument
Manufacturer/OEM authorization or authorized distributor certificate
GST invoice and GST portal payment screenshot
Technical bid documents as per bid conditions
Post-delivery inspection plan (if applicable)
Any certificates or documents sought in ATC/Corrigendum
Key insights about JHARKHAND tender market
Bidders must be Indigenous manufacturers or Indian suppliers with OEM authorization. Upload data sheet, OEM authorization, GST invoice, and GST payment proof. Ensure IM marking on goods and comply with Kiriburu store post-receipt inspection. Delivery within 3 months; follow ATC/Corrigendum certificates.
Submit GST registration, PAN, data sheet, OEM authorization (if applicable), GST invoice and GST portal payment screenshot, technical bid documents, and post-delivery inspection plan. Include certificates specified in ATC/Corrigendum and ensure IM marking details in invoice/packing list.
Delivery must be completed within 3 months from the purchase order date. Goods should be packed to prevent damage, with visible IM markings. Post-receipt inspection occurs at Kiriburu Iron Ore Mines store; pre-dispatch inspection is waived unless required by ATC.
Indigenous manufacture eligibility; OEM authorization if using distributors; data sheet alignment with product; GST compliance documented; ATC/Corrigendum certificates submitted; no IS/ISo standard specified in data.
GST is reimbursed at actuals or the applicable rate, whichever is lower, limited to the quoted GST percentage. The invoice must reflect consignee GSTIN and GST payment screenshot uploaded on the GeM portal.
Offers from blocked/suspended/banned vendors shall be summarily rejected and not considered further. Ensure compliance with the buyer's special condition on vendor eligibility before bidding.
Scope is limited to supply of goods only; no service scope. Bid price must include all costs. Post-delivery inspection will verify packaging, IM marking, and product conformity at Kiriburu store.
Submit Manufacturer Authorization/Certificate with OEM details: name, designation, address, email, and phone. This ensures authorized distribution or service for the Electronic Total Station and aligns with mandatory vendor qualification.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS