TenderDekho Logo
Active GEM

Hindustan Petroleum Corporation Ltd SITC of Fire Engine and Hazira IRD Visit Charges Tender Surat Gujarat 2026

Bid Publish Date

08-Oct-2026, 10:11 pm

Bid End Date

19-Oct-2026, 12:00 pm

EMD

₹1,87,000

Progress

Issue08-Oct-2026, 10:11 pm
AwardPending

Tender Overview

Hindustan Petroleum Corporation Ltd invites bids for the SITC of a Fire Engine as per SOJ and STC at Hazira IRD, including Hazira IRD PWAMC and Breakdown Visit Charges for the 1st to 5th years. Estimated value is not disclosed, but EMD ₹187,000 is required. Location is Surat, Gujarat 394101. The scope includes service charges per year and potential quantity adjustments under the option clause. Bold differentiators include compliance with Hazira IRD terms and multi-year visit charges. Bidders should align with the purchaser’s delivery framework and option-based quantity variability.

Technical Specifications & Requirements

  • Product/Service: SITC of Fire Engine and annual PWAMC/BREAKDOWN Visit Charges at Hazira IRD per SOJ/STC
  • Years Covered: 1st through 5th year visit charges; pricing at contracted rates
  • Delivery/Timeline: Delivery period built around original delivery orders with option of up to 25% quantity variance; minimum extended time logic applies (minimum 30 days)
  • EMD: ₹187,000 to be paid as per tender terms; mode not specified
  • BOQ: 11 items listed, but specific quantities/units are not disclosed in data; scope focuses on service visits and fire engine SITC per Hazira IRD
  • Special Terms: Generic ATC terms uploaded; bidder must comply with option clause and Hazira IRD conditions
  • Location Context: Surat, Gujarat; Hazira IRD facilities referenced

Terms, Conditions & Eligibility

  • EMD: ₹187,000; payment mode not specified but required to secure bid
  • Option Clause: Purchaser may increase/decrease quantity up to 25% at bid rates; extended delivery timelines follow the same proportional logic
  • Delivery: Delivery period aligned to last date of original delivery order with calculation rule for additional time
  • ATC/ATC Document: Buyer has uploaded ATC; bidders must review and comply
  • Delivery Period: Critical for multi-year visit charges; ensure readiness for Hazira IRD scope
  • Documentation: GST, PAN, experience, financials; specific documents listed in ATC
  • Compliance: Follow SOJ/STC at Hazira IRD; adhere to procurement terms

Key Specifications

  • Product/Service: SITC of Fire Engine and Hazira IRD visit charges (PWAMC, Breakdown) for 5 years

  • EMD: ₹187000

  • Location/Site: Hazira IRD, Surat, Gujarat

  • Contractual terms: Option clause up to 25% quantity change at contracted rates

  • Delivery framework: Based on original delivery order with extended time logic

Terms & Conditions

  • EMD amount and payment terms must be met to participate

  • Option clause allows ±25% quantity change at bid rates

  • Delivery timelines derived from original order; extended time rules apply

Important Clauses

Payment Terms

EMD of ₹187000; payment terms to be detailed in ATC/document; adhere to government procurement norms

Delivery Schedule

Delivery period begins from last date of original delivery order; additional time determined by (additional quantity/original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

LD/penalties if delivery/slippage occurs per ATC terms; not detailed in provided data

Bidder Eligibility

  • Proven experience in SITC of fire-related equipment or services

  • Financial capacity to support multi-year visit-charge contracts

  • Compliance with Hazira IRD SOJ/STC requirements and local procurement norms

Advertisement

Tender Data

Bid Details

Quantity

223

Category

SITC of Fire Engine as per SOJ and STC at Hazira IRD

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

28

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SITC of Fire Engine as per SOJ and STC at Hazira IRD , PWAMC Visit Charges 1st Year as per SOJ and STC at Hazira IRD , Breakdown Visit Charges 1st Year as per SOJ and STC at Hazira IRD , PWAMC Visit Charges 2nd Year as per SOJ and STC at Hazira IRD , Breakdown Visit Charges 2nd Year as per SOJ and STC at Hazira IRD , PWAMC Visit Charges 3rd Year as per SOJ and STC at Hazira IRD , Breakdown Visit Charges 3rd Year as per SOJ and STC at Hazira IRD , PWAMC Visit Charges 4th Year as per SOJ and STC at Hazira IRD , Breakdown Visit Charges 4th Year as per SOJ and STC at Hazira IRD , Breakdown Visit Charges 5th Year as per SOJ and STC at Hazira IRD

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

15

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Surat

Delivery Pincodes

394510

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ravi Kumar Agarwal394510,HPCL POL DEPOT, HAZIRA IRD, P.O. Ichhapore, Village Kawas, Hazira Road, Surat, Gujarat - 394510SuratGujarat394510360-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-10007876.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

SITC of Fire Engine as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

3 ea Delivery: 60 days
#2

PWAMC Visit Charges 1st Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

36 ea Delivery: 60 days
#3

Breakdown Visit Charges 1st Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

8 ea Delivery: 60 days
#4

PWAMC Visit Charges 2nd Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

36 ea Delivery: 60 days
#5

Breakdown Visit Charges 2nd Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

8 ea Delivery: 60 days
#6

PWAMC Visit Charges 3rd Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

36 ea Delivery: 60 days
#7

Breakdown Visit Charges 3rd Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

8 ea Delivery: 60 days
#8

PWAMC Visit Charges 4th Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

36 ea Delivery: 60 days
#9

Breakdown Visit Charges 4th Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

8 ea Delivery: 60 days
#10

Breakdown Visit Charges 5th Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

36 ea Delivery: 60 days
#11

Breakdown Visit Charges 5th Year as per SOJ and STC at Hazira IRD

Please refer tender terms and conditions, document for details.

8 ea Delivery: 60 days
Advertisement

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for SITC of fire-related services

4

Financial statements of last 3 years

5

EMD payment receipt or proof

6

Technical bid documents confirming compliance with SOJ/STC at Hazira IRD

7

OEM authorizations or service capability certificates if applicable

8

Any bidder-specific forms required by ATC document

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for the fire engine SITC tender in Surat Gujarat 2026

Bidders must meet eligibility including GST, PAN, and financials; submit EMD of ₹187000 and technical bids per ATC. Ensure compliance with SOJ/STC Hazira IRD terms and review the uploaded ATC document for mandatory forms and delivery terms.

What documents are required for HPCL Hazira fire engine bid in Surat

Required documents include GST certificate, PAN, last 3 years financials, experience certificates for SITC, EMD proof of ₹187000, technical bid, and OEM authorizations if applicable; ensure ATC-specific forms are completed.

What are the delivery terms for Hazira IRD visit charges tender

Delivery terms align with the last date of the original delivery order; if quantity increases by up to 25%, the extended time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.

What standards or compliance are required for HPCL fire engine bid

Compliance with SOJ/STC at Hazira IRD is essential; review the uploaded ATC for organization-specific standards and any OEM requirements; ensure all technical specifications and service provisions meet HPCL terms.

What is the EMD amount for the HPCL fire engine tender

The EMD is ₹187,000; bidders should include payment proof with their bid as per ATC guidelines and ensure funds are available for bid submission.

What is the scope of multi-year visit charges in this tender

The scope covers PWAMC and Breakdown Visit Charges for the 1st to 5th years, with charges per SOJ/STC; ensure pricing for each year is reflected in the technical bid and financial bid per Hazira IRD requirements.

Advertisement