Bid Publish Date
11-Apr-2026, 11:43 am
Bid End Date
22-Apr-2026, 4:00 pm
Location
Progress
Quantity
2
Bid Type
Single Packet Bid
The South East Central Railway, a division of Indian Railways, invites bids for automatic and semi-automatic welding equipment using the MIG/MAG process as per IS 7931 (Parts 1-3). The procurement location is DURG, CHHATTISGARH (490001). The scope is GOODS supply only, with no BOQ items listed. Key bid conditions include OEM bid specificity, pre/post inspection options, and a past performance clause for bulk orders. The contract emphasizes IS 7931 conformity, DC welding power source, and ISI-marked CO2 components. The buyer requires OEM authorization and limits on post-acceptance risk via inspection and compliance checks.
IS 7931 conformity for MIG/MAG equipment
DC welding generator power source per IS 7931 Part I 1975
Maximum welding current at 100% and 85% duty cycles
Wire feeder drive system details and wire feed speed
Torch current rating at 60% duty cycle
Wire diameter range and torch length specifications
CO2 regulator (ISI marked) and CO2 preheater
Warranty duration and supplier support commitments
EMD amount not disclosed; bid must include OEM authorization and post-inspection readiness
Delivery: supply of goods with post-receipt inspection at consignee site; GST as per actuals
Past performance: minimum 20% quantity achieved in last 3 years for bulk orders
GST treatment as actual or quoted rate; no explicit advance terms stated in data
Delivery is goods-only; inspections may occur pre-dispatch or post-receipt at consignee site
Penalty details not specified in provided data; standard SECR terms likely apply
Must supply OEM authorization directly from the manufacturer
Experience in delivering MIG/MAG welding equipment within rail sector preferred
Demonstrated capability to meet IS 7931 standards and ISI-marked components
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Automatic and Semi Automatic Welding Equipment with Self Adjusting Arcs MIG / MAG as per IS 7931 (Part 1, Part 2 and Part 3) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Standards | Conformation of automatic and semi automatic welding equipment with self adjusting arcs (MIG/MAG process) | "Conformity to IS: 7931 part 1 & Part 3" |
| Standards | DC welding generator power source conform to IS:7931/(Part-I)/1975 | Yes |
| Performance Parameters | Type of power Source | Three Phase Supply |
| Performance Parameters | Maximum automatic continuous welding current (in amp) at 100 percent duty cycle (Amp @ Duty Cycle) | 500.0 |
| Performance Parameters | Maximum automatic continuous welding current (in amp) at 85 percent duty cycle (Amp @ Duty Cycle) | 500.0 |
| Performance Parameters | Drive System for Wire Feeder | servo-controlled stepless drive system |
| Performance Parameters | Type of metal which can be welded | All (Stainless steel, Mild steel, Aluminium, Copper, Brass) |
| Performance Parameters | Pulse synchronization | No |
| Performance Parameters | Current rating of torch at 60 % duty cycle (Amp @ Duty Cycle) | 500 |
| Performance Parameters | Wire feed speed in mm/min | 25 |
| Performance Parameters | Rating (in Amperes) | 500.0 |
| Performance Parameters | Warranty (in years) | 1, 2, 3, 4, 5 |
| Dimensional Parameters | Diameter of wire with range (in mm) | (.8 to 1.2) mm |
| Dimensional Parameters | Length of torch (in meters) | 3.0 |
| Additional Parameters | Wire feeder covered | Yes |
| Additional Parameters | CO2 regulator (ISI marked) | Yes |
| Additional Parameters | CO2 preheater | Yes |
GST registration certificate
PAN card
OEM bid authorization certificate on applicant's letterhead with signatory details
Financial statements (latest available) and turnover proof
Experience certificates showing prior MIG/MAG welding equipment supply
Technical bid documents demonstrating IS 7931 conformity
M&P and T&P credentials for manufacturing scope
Quality certifications and ISI mark documentation for CO2 regulator
Delivery/completion schedule and installation plan (if any)
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | Akshay Traders Under PMA | Item Categories : Automatic and Semi Automatic Welding Equipment with Self Adjusting Arcs MIG / MAG as per IS 7931 (P | |
| L2 | UPADHYAY ENTERPRISES Under PMA | Item Categories : Automatic and Semi Automatic Welding Equipment with Self Adjusting Arcs MIG / MAG as per IS 7931 (P | |
| L3 | SHAM RAVINDRA AND CO (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Automatic and Semi Automatic Welding Equipment with Self Adjusting Arcs MIG / MAG as per IS 7931 (P |
Key insights about CHHATTISGARH tender market
Bidders should secure OEM bid authorization on company letterhead, confirm IS 7931 conformity, submit GST and PAN, provide past performance proofs (3 years, 20% tender quantity on a single order), and attach post-dispatch inspection readiness. Include complete price with GST and delivery timeline. Ensure OEM direct authorization is attached to the bid.
Required documents include GST registration, PAN, OEM authorization, financial statements, experience certificates for MIG/MAG supplies, technical compliance with IS 7931, M&P credentials, and supplier installation/maintenance capabilities. Also include quality certifications for CO2 regulator and ISI-marked components, with delivery plan.
Equipment must conform to IS 7931 Parts I-III for automatic and semi-automatic MIG/MAG operations; DC welding power source must comply with IS 7931 Part I 1975. Additional ISI-mark requirements apply for CO2 regulator and related accessories, plus warranty terms specified by SECR.
Pre-dispatch inspection may be selected in ATC with inspection at seller premises; post-receipt inspection occurs at the consignee site SSE(M)/ELS/BIA. Inspection determines acceptance before final payment and release of goods.
Tender requires satisfactory past performance within the last 3 years, with at least 20 percent of the tender quantity delivered to any Zonal railway or railway PUs on a single order to qualify for bulk orders or developmental orders; documentation proof is required.
OEM authorization must be on the bidder's letterhead, include full name, designation, active email, and mobile number of the signatory, company stamp, and be directly from the OEM; without this, the bid will be rejected.
GST will be applied by the bidder; reimbursement will be as per actuals or the quoted rate, whichever is lower, with the stated maximum GST percentage honored. Ensure GST registration is valid and reflected in the bid.
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS